checkAd

    GAMESA (GAM) ++ Nr. 2 weltweit in Windkraftanlagen + Windparks + Solarenergie ++ (Seite 329)

    eröffnet am 17.08.06 17:41:40 von
    neuester Beitrag 29.08.23 06:44:30 von
    Beiträge: 3.834
    ID: 1.077.587
    Aufrufe heute: 0
    Gesamt: 286.463
    Aktive User: 0

    ISIN: ES0143416115 · WKN: A0B5Z8 · Symbol: GTQ1
    18,050
     
    EUR
    0,00 %
    0,000 EUR
    Letzter Kurs 07.02.23 Tradegate

    Werte aus der Branche Versorger

    WertpapierKursPerf. %
    19,100-8,26
    11,444-11,15
    21,400-11,57
    1,3310-14,95
    490,00-18,33

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 329
    • 384

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 05.04.10 10:58:26
      Beitrag Nr. 554 ()
      Antwort auf Beitrag Nr.: 39.267.999 von bossi1 am 02.04.10 09:51:41

      Artikel dazu ...
      http://www.renewableenergymagazine.com/paginas/Contenidosecc…
      Avatar
      schrieb am 05.04.10 10:56:09
      Beitrag Nr. 553 ()
      Antwort auf Beitrag Nr.: 39.268.302 von JoergP am 02.04.10 11:34:51GAMESA hat schon das eigene und spezielle Problem, dass im Heimatmarkt Spanien nicht viel gelaufen ist ...


      Siehe auch #523

      Ein Beispiel:
      In Andalusien werden nach 1.077 MW im Vorjahr in 2010 nur 30 MW Windkraft mit der neuen Vorregistierung installiert. Das gleiche Spiel wie bei PV-Solar in Spanien ...

      Andalucía solo instalará 30 MW eólicos en 2010 :look:

      25 de marzo de 2010

      El año pasado fueron más de mil. Este año, treinta. Son datos extraídos del último informe del Observatorio Andaluz de Energías Renovables, que acaba de hacer público Aprean (la patronal andaluza de las renovables). Según ese informe, la comunidad autónoma que más megavatios eólicos (1.077) instaló el año pasado, Andalucía, tiene prevista apenas una treintena para el presente ejercicio (en la foto, espectacular imagen del complejo eólico de El Andévalo, ubicado en la provincia de Huelva, 244 MW).

      Las energías renovables cuentan actualmente en Andalucía con 3.822 megavatios de potencia instalada (2.840 eólicos, al cierre del ejercicio 2009, según los datos de la Asociación de Promotores y Productores de Energías Renovables de Andalucía, Aprean). Por potencia instalada, a la eólica le sigue la energía fotovoltaica, con 665 MW (el 17%); la biomasa rondaría los doscientos (191 megavatios; el 5%); y la termoeléctrica sumaría 131 (3,4%). El parque renovable andaluz habría requerido una inversión, "desde hace cerca de una década", de unos 6.700 millones de euros, según la asociación.

      El brutal batacazo que va a experimentar la eólica andaluza –el gran yacimiento de megavatios renovables del sur– se debe, según Aprean, al registro de preasignación que impuso el gobierno central hace unos meses, un registro ya criticado en su momento tanto por la Asociación Empresarial Eólica, como por otras patronales autonómicas, como la Asociación de Promotores de Energía Eólica de Castilla y León, Apecyl, que emitió en mayo pasado, apenas unos días después de publicado el Real Decreto-ley 6/2009, un durísimo comunicado en el que ya anunciaba que "el nuevo RD incluye requisitos que pueden ser en muchos casos prácticamente insuperables en condición y plazo para las compañías del sector, sobre todo, para los pequeños y medianos promotores".

      La potencia eólica con que cuenta actualmente Andalucía es suficiente, según Aprean, "para abastecer de energía eléctrica a un millón setecientos mil hogares y evitar la emisión a la atmósfera de más de 2,2 millones de toneladas de CO2, el equivalente a retirar de la circulación a cerca de 1,2 millones de vehículos". El año pasado, en Andalucía se instalaron 36 nuevos parques eólicos (actualmente hay 127), lo que ha supuesto una inversión de 1.600 millones de euros en Andalucía (la región fue la comunidad autónoma que más potencia eólica sumó en 2009). Ese crecimiento supuso, según Aprean, un notable incremento en cuanto al número de empleos y desarrollo de la industria. Sin embargo, el "parón" que ha propiciado el registro de preasignación ha reducido a 30 MW los previstos para este año, 401 durante 2011 y 32 en 2012. ... Volumen für die nächsten Jahre in Andalusien ...30 MW 2010, 401 MW 2011 und 32 MW 2012.

      Líder en solar termoeléctrica y biomasa
      Según el Observatorio de Aprean, Andalucía cuenta actualmente con 666 MW de potencia solar fotovoltaica instalada, lo que sitúa a esta comunidad en el segundo puesto, a nivel nacional, tras Castilla-La Mancha. Durante 2009, sin embargo, únicamente se instalaron 2,62 MW. Con respecto a esta tecnología, la asociación señala que, "con las cifras alcanzadas hasta ahora, ha quedado superado el objetivo establecido en el Plan de Sostenibilidad Energética 2007-2013 (Pasener) en materia de potencia fotovoltaica" [ese plan andaluz fijaba la instalación de 400 MW para el año 2013].

      En cuanto a potencia solar termoeléctrica, la región tiene 131 MW en operación, tras la puesta en marcha de dos nuevas plantas durante el presente año (PS20 y ANDASOL 2), que han sumando 70 megas a los ya existentes. Las instalaciones andaluzas de solar termoeléctrica se encuentran en la provincia de Sevilla: PS10 (11 MW), PS20 (20 MW), Aznalcóllar (0,08 MW) y ESI (0,01 MW); y en la provincia de Granada: Andasol 1 y Andasol 2, con 50 MW cada una de ellas. Actualmente, se encuentran en construcción 516,8 MW correspondientes a once proyectos ubicados en las provincias de Sevilla (que contará con seis centrales); Córdoba (dos plantas), Cádiz (dos plantas) y Granada (una planta).

      Por fin, y según los datos de Aprean, Andalucía, "con 17 plantas de biomasa que suman un total de 191,3 megavatios, lidera el sector de esta tecnología en España, representando el 51 por ciento de la actividad total nacional". Por provincias, Córdoba se sitúa en cabeza de generación de energía eléctrica por biomasa con 82,8 MW, seguida de Huelva, con 68; Jaén, con 20,3; Málaga, con 16,8; y Almería, con 3,4. La comunidad cuenta actualmente con seis plantas de fabricación de pellets operativas y otros cuatro proyectos en Córdoba, Granada y Jaén.

      Más información
      www.aprean.com

      http://www.energias-renovables.com/paginas/Contenidoseccione…
      Avatar
      schrieb am 02.04.10 11:34:51
      Beitrag Nr. 552 ()
      Antwort auf Beitrag Nr.: 39.267.999 von bossi1 am 02.04.10 09:51:41Naja, allein den Chinesen die Schuld zu geben, zieht wohl nicht.
      GAMESA hat schon das eigene und spezielle Problem, dass im Heimatmarkt Spanien nicht viel gelaufen ist.
      Denn:
      Vestas und GE haben sich oben gehalten (Plätze 1 und 2), ENERCON behielt den vierten Platz (gemäss Veröffentlichung der Daten von Make-Consulting an anderer Stelle liegt die chinesische Sinovel auf Platz 3).
      Und GAMESA ist sogar noch hinter SIEMENS zurückgefallen.
      Avatar
      schrieb am 02.04.10 09:51:41
      Beitrag Nr. 551 ()
      ... die Marktquote von Gamesa ist 2009 von 11 auf 6% gefallen. Die Ursache liegt an der wichtigen Rolle chinesischer Anbieter am Markt.

      GAMESA - ACCIONA
      Pérdidas de cuota de mercado :look:
      [ GAMESA ]

      Martes, 23 de Marzo del 2010 - 10:27
      Este fin de semana la consultora danesa Make Consulting hizo público su informe sobre las cuotas de mercado de los fabricantes de aerogeneradores en 2009.

      1. Vestas cuota del 14,5% vs 20% en 2008.
      2. GE Energy.
      3. Enercon.
      .
      .
      .
      7. Gamesa cuota del 6% vs 11% en 2008. :look:
      .
      .
      .
      15. Acciona

      Noticia Negativa para Gamesa y Acciona que han perdido una importante cuota de mercado a causa del importante papel que están tomando en el sector las compañías chinas.

      capitalbolsa.es
      Avatar
      schrieb am 02.04.10 09:02:35
      Beitrag Nr. 550 ()
      ... BNP Paribas senkt KZ von 13 auf 8,50 und weiter untergewichten, da sie von rückläufigen Gewinnen ausgehen

      GAMESA Exane BNP Paribas baja P.O. Gamesa a 8,5 euros :look:
      Fecha: 29/3/2010 Fuente: Invertia

      Los analistas de Exane BNP Paribas han rebajado el precio objetivo de Gamesa a 8,5 euros desde los 13 euros por acción de su anterior recomendación. Asimismo, mantienen su consejo de infraponderar el valor ya que creen que la proyección de la compañía sobre la cartera de pedidos es ambigua y que las previsiones de beneficio son difíciles de lograr.

      Trading Spotlight

      Anzeige
      Nurexone Biologic
      0,4200EUR +2,44 %
      Die bessere Technologie im Pennystock-Kleid?!mehr zur Aktie »
      Avatar
      schrieb am 25.03.10 13:35:09
      Beitrag Nr. 549 ()
      Habe den Wert schon lange auf der Watchliste und heute könnte charttechnisch eine Trendwende erreicht sein.
      Bis Ende des Jahres sollten 20-30% drin sein, den Wert war überverkauft und die Aussichten für Windindustrie sollten sich auch langsam aufhellen.
      Avatar
      schrieb am 11.03.10 13:11:19
      Beitrag Nr. 548 ()
      Wenn ich gerade flüssig wäre, würde ich jetzt kaufen!
      Offshore winkt!

      10. März 2010
      Gamesa Gets Ready for the Big Push Launch of G10x Signals New Era
      by Eize de Vries, Wind Technology Correspondent
      London, UK [Renewable Energy World Magazine]
      The erection of an innovative medium-speed 4.5 MW wind turbine prototype in Spain's Saragossa region made 2008 an important year for Gamesa. In that year, the vertically integrated company ranked third among the world's largest wind turbine suppliers, with manufacturing facilities in Spain, the US and Asia. Previously, the company had relied on its sub-megawatt class Gamesa G5X-850 kW and Gamesa G8X-2.0 MW series, both based upon Vestas technology designs but further developed and optimised in-house (see panel below). Gamesa's global manufacturing capabilities include rotor blades, root joints, blade moulds, gearboxes, generators, converters and towers, as well as wind turbine assembly.

      The main Gamesa G10X-4.5 MW design feature, is its segmented composite Gamesa-designed INNOBLADE rotor blades. In addition, the 128 metre rotor diameter represents a wind industry record, while the 250 tonne Top Head Mass (THM) can be highly regarded in its performance class. Gamesa’s G10X-4.5 MW project is a major multi-year product development undertaking, and the company’s first genuinely in-house developed wind turbine. The overall product development process involved more than 150 Gamesa engineers and other experts located in its Spanish and Danish R&D centres, working in close co-operation with external specialists and research organisations.

      The company’s largest main volume series, the 2 MW Gamesa G8X-2.0 MW, has been commercially available since 2002 and features a conventional state-of-the-art fast-speed drive system. This arrangement includes a multi-stage gearbox and a doubly–fed generator. The series offers rotor diameters of 80–90 metres.

      Compared to the Gamesa G8X-2.0 MW series, the new Gamesa G10X-4.5 MW represents a huge leap forwards in terms of rated capacity and rotor size. The rotor swept area has even grown by a factor two set against the currently largest G90-2.0 MW (rotor diameter 90 metres), which translates into a huge increase in terms of power generating potential per installation. Key development goals for the G10X-4.5 MW were maximum drive system reliability and being able to employ transportation and erection equipment logistics similar to the smaller Gamesa G8X-2.0 MW series.

      Medium-speed Drive System Emerges From R&D

      As the final outcome of an extensive multi-year drivetrain study and development process incorporating various alternative solutions, Gamesa’s reliability goal resulted in a medium-speed drive system. During the process many options were analysed, ranging from direct drive (no gearbox), to medium-speed and conventional high-speed geared solutions (see panel on page 66). Besides striving for maximised reliability, Gamesa formulated additional demands, including optimised systems flexibility and stability.

      The project aimed to set new standards with regard to Life Cycle Costs (LCC) performance, explains Gamesa chief technology officer José Antonio Malumbres.* ‘Major direct drive system limitations, in our view, include complex and costly transport and erection logistics due to the annular generator size and weight. By choosing instead a medium-speed drive system we were able to overcome size and weight issues linked to direct drive. Simultaneously, a medium-speed drive system eliminates the trouble-prone high-speed gear stage, which is an integral part of three-stage gearboxes applied in conventional geared wind turbines. It was important that by choosing to eliminate the high-speed gear stage as a reliability enhancing measure it proved unnecessary to compromise on overall systems flexibility.’

      The Gamesa G10X-4.5MW CompacTrain drivetrain comprises a main shaft with two main bearings and a two-stage planetary-type gearbox with 1:37 speed-up ratio, built as a single semi-integrated module. Like some of its main competitors (GE and Vestas), Gamesa made a switch away from a doubly-fed generator to a permanent magnet (PM)-type synchronous generator. Malumbres explains, ‘PM generators offer multiple advantages, include greater compactness, slip-ring elimination, superior partial-load efficiency and easier compliance with stringent future grid codes. Being a full converter technology it also offers greater project developer application flexibility at combined 50 Hz and 60 Hz wind markets.’

      The full power converter system consists of modular units located in the rear of the nacelle and is subdivided into two levels. Major focus points were maximised reuse of components already applied in other Gamesa models, the preferred application of standard off-the-shelf components and solutions, and ease of serviceability, for example the mass of individually removable components is limited to 25 kg. A medium-voltage transformer is also fitted in the nacelle rear, but behind the converter, while a liquid-cooling system for converter, generator and gearbox is positioned above the converter.

      Cyclic Blade Pitching Cuts THM

      ‘A main contributing factor to the favourable THM (nacelle + rotor) is the combination of an advanced MultiSmart turbine control system and the application of load-reducing cyclic rotor blade pitch technology. The latter continuously monitors blade root loads and adjusts the blade angle accordingly during each rotor revolution’, Malumbres continues. ‘As our highest priority was to commence soonest with controller testing and optimising, we decided to initially fit the prototype with a smaller provisional 107 metre rotor based upon conventional single piece blades.’ The segmented blades to be fitted on the prototype consist of carbon fibre and glass fibre reinforced epoxy composite inner and outer sections connected by a single bolted joint. ‘Eliminating any risk of a potential stiffness interruption occurring in the joining surface cross-section represented a major challenge for our rotor blade designers and required extensive research efforts’, he says.

      Malumbres disagrees with some competitors that transporting single blades with lengths of 52 metres and more (for instance the latest generation 3 MW+ turbines) by road can still be accomplished without facing real constraints. He names Mediterranean markets as an example where transporting such blades would represent a real challenge.

      With Gamesa’s segmented blades the maximum individual blade section length is in contrast less than 35 metres. Gamesa G10X nacelle erection is similar to the G8X-2.0 MW erection process and again, depending on hub height, (only) requires a standard 800–1000 tonne crane. Malumbres says, ‘Due to the modular Gamesa G10X concept with easily removable drivetrain and other main components, a relatively inexpensive crane can be employed to hoist an empty nacelle on top of a matching tower. After job completion this crane can then be moved to the next turbine erection location, while our new Gamesa FlexiFit nacelle-mounted crane system takes over and installs all main components.’

      The FlexiFit crane is a ground-assembled self-mounting system able to either hoist-in or exchange even a complete drive system. Malumbres believes it will help to substantially lower G10X-4.5MW erection costs and increase operational availability. A second prototype G10X-4.5MW is envisaged in 2010 near to the first unit.

      The next two prototypes are planned for the second quarter of 2011, perhaps 60 Hz versions, followed by series delivery to the US and Canada, Spain, Italy, Germany, France and China, all seen as key markets. Gamesa is also considering entering the offshore market, where it sees a relatively low THM as a key product specification. However, the envisaged offshore turbine will not represent the G10X-4.5 MW in its present form and its design will be evaluated further, says Malumbres.



      G10X-4.5MW chief engineer Rafael Hernández and marketing manager Juan Diego Díaz also participated in this interview and supplied some of the attributed quotes.


      Eize de Vries is wind technology correspondent of Renewable Energy World.
      Avatar
      schrieb am 26.02.10 12:42:51
      Beitrag Nr. 547 ()
      Mittel- und langfristig sind die Chancen in der Windindustrie mit starken Wachstumsraten ungebrochen! Einen Global Player zum Kursniveau von 2004 vorzufinden, nenne ich eine sehr gute Gelegenheit! Auch die Zahlen rechtfertigen keinesfalls diese momentane Übertreibung nach unten.

      Wie immer nur meine Meinung.
      PR
      Avatar
      schrieb am 26.02.10 12:42:24
      Beitrag Nr. 546 ()
      Avatar
      schrieb am 26.02.10 12:38:41
      Beitrag Nr. 545 ()
      15.02.2010 10:35
      Citigroup hebt Gamesa auf 'Buy' - Ziel gesenkt auf 13 Euro

      http://www.finanznachrichten.de/nachrichten-2010-02/16142814…
      • 1
      • 329
      • 384
       DurchsuchenBeitrag schreiben


      Investoren beobachten auch:

      WertpapierPerf. %
      -1,42
      -1,02
      -0,30
      -14,29
      +0,19
      -0,23
      -0,67
      +0,49
      +0,53
      +0,96
      22.03.24 · wallstreetONLINE Redaktion · BayWa
      07.02.24 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      24.01.24 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      13.10.23 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      04.09.23 · Shareribs · Siemens Gamesa Renewable EnergyAnzeige
      03.08.23 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      23.06.23 · LS-X Trader · Siemens Gamesa Renewable EnergyAnzeige
      23.06.23 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      12.06.23 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      16.05.23 · wallstreetONLINE Redaktion · Siemens Gamesa Renewable Energy
      GAMESA (GAM) ++ Nr. 2 weltweit in Windkraftanlagen + Windparks + Solarenergie ++