Ja Solar kauft Equipment in Deutschland ein, das sollte ja dann
ganz gut funktionieren.
CONTRACT
CONTRACT NO.: 20061126SH-R&R
DATE: Nov. 26, 2006
The Buyer: Shanghai JA Solar Technology Co.,LTD
Address: E6-E8, Fengpu Industrial Park Export Processing Zone,
Fengxian District, Shanghai, China
Tel: +86-21-63735356 Fax: +86-21-63735356
The Seller: ROTH & RAU AG
Address: GEWERBERING 3, OT WUSTENBRAND, D-09337
HOHENSTEIN-ERNSTTHAL, GERMANY
Tel: +49-0 3723 /4988-28 Fax: +49-0 3723 / 4988-25
1. This Contract is made by and between the Buyers and the Sellers,
whereby the Buyers agree to buy and the Sellers agree to sell the
under-mentioned commodity according to the terms and conditions
stipulated below.
Item
Commodity and Specification
Quantity
Unit Price
Total Amount
1 Antireflective Coating Equipment for Crystalline
Silicon Solar Cells
PECVD (SINA L)
Four units Euros 1,000,000.00 FOB European main seaport Euros
4,000,000.00
DETAILS AS PER APPENDIX AS FOLLOWS,
Appendix 1: Quotation documents, Quoatation no. 2006-TH044
Appendix 2: Spares and consumable parts
Appendix 3: Acceptance test Criteria.
Appendix 4: Technical training service items.
TOTAL AMOUNT: FOB European main seaport EUROS four millions
only.
1
--------------------------------------------------------------------------------
2 MANUFACTURERS AND COUNTRY OF ORIGIN:
same as the Seller
3 PACKING:
To be packed in strong wooden case(s) then in container, suitable
for long distance ocean/parcel post/air freight transportation and
change of climate, well protected against moisture and shocks. The
Sellers shall be liable for any damage of the commodity and
expenses incurred on account of improper packing and for any rust
attributable to inadequate or improper protective measures taken by
the Sellers in regard to the packing. The wooden boxes must be
labeled with “IPPC”.
4 SHIPPING MARK:
The main shipping marks and wording: “KEEP AWAY FROM
MOISTURE”,”HANDLE WITH CARE”,”THIS SIDE UP” must be printed on each
wooden cases; package number, gross weight, net weight and
measurement must be stipulated in side shipping marks.
5 TIME OF SHIPMENT:
2 machines to be shipped before the
end of February,2007, 2
machines to be shipped before the end of March
2007............
http://contracts.onecle.com/ja-solar/roth-mfg-2006-11-26.sht…
Der weitere Ausbau der Produktion geht also voran.