checkAd

    Think big - think ZINC! Trevali Resources Produzent in 6 Monaten (Seite 352)

    eröffnet am 18.02.08 21:57:43 von
    neuester Beitrag 22.08.22 15:42:57 von
    Beiträge: 4.273
    ID: 1.138.653
    Aufrufe heute: 0
    Gesamt: 409.022
    Aktive User: 0

    ISIN: CA89531J1093 · WKN: A1H9CE
    0,1140
     
    EUR
    -3,72 %
    -0,0044 EUR
    Letzter Kurs 30.11.21 Tradegate

    Werte aus der Branche Stahl und Bergbau

    WertpapierKursPerf. %
    1,7000+30,77
    0,5998+22,41
    575,00+21,05
    0,6440+19,26
    10,500+16,67
    WertpapierKursPerf. %
    14,100-10,76
    1,6000-13,53
    0,5100-13,56
    9,0900-17,36
    2,1400-45,41

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 352
    • 428

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 04.06.08 15:29:36
      Beitrag Nr. 763 ()
      Antwort auf Beitrag Nr.: 34.236.553 von e_type1 am 04.06.08 15:22:44Und 3mio Dollar sind nüscht. Die holen die in den ersten 2 Monaten raus :D

      Neono
      Avatar
      schrieb am 04.06.08 15:22:44
      Beitrag Nr. 762 ()
      läft alles wie am schnürrchen bei unserer unter dem radar fliegenden :D
      Avatar
      schrieb am 04.06.08 15:22:35
      Beitrag Nr. 761 ()
      Antwort auf Beitrag Nr.: 34.236.385 von e_type1 am 04.06.08 15:08:58
      Beste Nachricht, vielen Dank! :)
      Avatar
      schrieb am 04.06.08 15:08:58
      Beitrag Nr. 760 ()
      :D

      Trevali Resources plans to refurbish Santander mill


      Trevali Resources Corp (C:ZINC)
      Shares Issued 28,800,000
      Last Close 6/3/2008 $2.30
      Wednesday June 04 2008 - News Release

      Mr. Mark Cruise reports

      TREVALI ANNOUNCES TWO PHASE MILL REFURBISHMENT PLAN AT SANTANDER SILVER-LEAD-ZINC MINE PROJECT IN PERU

      Trevali Resources Corp. plans a mill refurbishment and upgrade program at its Santander silver-lead-zinc project in west-central Peru.

      Holland and Holland Consultants, of England, in conjunction with Resource Development Inc. of Denver, Colorado, have recently completed an engineering report reviewing refurbishment and upgrades at the existing mineral processing circuit at Santander -- to an initial capacity of 1,500-tonnes-per-day - and have tabled a cost estimate of $3 million along with a timeline of approximately 6 months for completion of the initial phase of the program.

      The engineering study involved a complete inventory of the existing processing circuit (crushing, milling, concentrating and flotation) - that was contracted to BBA (Briceno-Briceno-Arcata) Ingenieros of Lima, Peru -- to ascertain which components can be refurbished and which require replacement.

      BBA Ingenieros supplied Holland and Holland with the costs estimates for the repair of specific components of the circuit, and also for the replacement and installation of necessary equipment.

      Phase I

      The review indicates the existing 8-ft by 12-ft ball mill - to be used in the regrinding of tailings -- will be refurbished in Phase One of the program. The plan will also see replacement of the flotation circuit at Santander with new tanks, mechanisms and motors being installed. New rougher-scavenger cells will be purchased based on specifications for Outokumpu 8-cubic-metre cells for bulk lead rougher-scavenger duty and Outokumpu 16-cubic-metre cells used for zinc rougher-scavenger duty.

      The program also sees replacement of the dewatering circuit including new thickeners and filters with separate units for copper-lead duty and for zinc duty.

      Phase II

      Phase Two of the refurbishment-upgrade program will include a redesign of the grinding plant to include an additional rod mill (11-ft by 14-ft size) for planned processing of higher-grade hard rock feed.

      The study shows the existing crushing plant is in good condition and will only require replacement of the secondary crusher, which will in turn allow for plus-4,000-tonne-per-day crushing capacity -- sufficient capacity for additional anticipated plant expansions and upgrades.

      The Phase One program will be initiated imminently, currently anticipated as mid-June, with postulated commencement of zinc concentrate production from reprocessing of tailings material by late-2008 (see NR-08-03 for details).

      The Tingo hydroelectric generating station (located about 17-km down valley to the west from Santander) is currently producing approximately 1.2 megawatts - sufficient for initial power demands in reprocessing of the zinc-rich tailings at the Santander operation. The generating facility will require upgrades to meet increased future requirements with the Company's planned transition to hard rock feed in addition to potentially providing a fourth revenue stream through sale of excess power capacity.

      Development Plans

      Trevali continues to advance on its plan to recommence production from Santander by late-2008, targeting a potentially large bulk-tonnage and low-cost zinc resource.

      Based on an early-1990s non-NI43-101 historic review, approximately 5.5 million tonnes of 2% zinc was estimated in the roughly 500-by-500-metre Santander tailings impoundment. Trevali recently completed a resource definition drill program on the tailings, drilled on 50-metre centres, and expects a resource estimate very soon. The recent program identified a significant zone within the northwest quadrant of the tailings that averaged 2.78% zinc and contains a significant coarse component (plus-200 mesh) suitable for reprocessing. The tailings are located only 150 metres from the concentrate plant and are predominantly comprised of dry material (see NR-08-06 for details).

      Project Background

      The Santander silver-lead-zinc mine project is located approximately 215 km by road from Lima, in the western extent of Peru's prolific Cerro de Pasco mineral district. The mine operated from 1958-1993 - targeting a single Carbonate Replacement Deposit-type pipe and manto structure. Approximately 8 million tonnes grading +7% zinc, 1-4% lead and 60 grams/tonne silver plus by-product copper was processed - initially from open pit operations and then from underground mining reaching a depth of 500 metres below surface in rock grading about 11% zinc. Drilling by past operators indicates mineralization remains open to depth - extending at least 200 metres further beneath the previous workings.

      Recent exploration drilling by the Company has focused on three other similarly mineralized manto to pipe-type structures (Magistral North, Central and South) situated in favourable carbonate host rocks and located a couple of kilometres northwest -- along the same structural trend hosting the Santander orebody. Initial results are very encouraging with essentially every hole (of the more than 70 holes completed) encountering significant intercepts of polymetallic mineralization (Ag-Pb-Zn) to depths of approximately 200 metres below surface. Mineralization remains open at depth in all 3 bodies.

      Site infrastructure at the formerly-producing operation includes a large camp and associated support facilities, an ore processing / concentrator plant (including various crushers, mills and cell houses) able to produce zinc, lead-silver and copper concentrates, and the Tingo hydroelectric power-station, located some 17-km down-valley to the west.

      Trevali's current diamond drill program represents the first modern exploration on the large, 4,455-hectare (44 km2), mine and exploration lease.

      Qualified Person and Quality Control/Quality Assurance

      EurGeol Dr. Mark D. Cruise, Trevali's President and CEO and a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company, as he is an officer and shareholder.

      The work programs at Trevali were designed by, and are supervised by, Mark D. Cruise, President & CEO, Trevali, and Les Oldham, General Manager, Consultora Minera Anglo Peruana S.A. (independent geological consultants), who together are responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ACME Laboratories, Vancouver, for assay. ACMEs quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Blind certified reference material is inserted at regular intervals into the sample sequence by Trevali personnel in order to independently assess analytical accuracy. Finally, representative blind duplicate samples are routinely forwarded to ACME and an ISO compliant third party laboratory for additional quality control.

      © 2008 Canjex Publishing Ltd.
      Avatar
      schrieb am 03.06.08 22:32:48
      Beitrag Nr. 759 ()
      Die Aufmersamkeit auf Andere aus der
      Henk-Group (wieder CDY) kann man immer
      gut für die gerade Vernachlässigten nutzen,
      wie (auch meine) jene "sichere Kiste". Man
      muss nicht überpari zahlen, wenn viele gerade
      durch eine enge Tür herein wollen.

      Tasche :)

      Trading Spotlight

      Anzeige
      Nurexone Biologic
      0,3960EUR 0,00 %
      +600% mit dieser Biotech-Aktie?!mehr zur Aktie »
      Avatar
      schrieb am 03.06.08 22:30:50
      Beitrag Nr. 758 ()
      Antwort auf Beitrag Nr.: 34.231.274 von to_siam am 03.06.08 22:16:15
      "...dann wird die Zeit der Fakten folgen."

      War eigentlich ein gutes Schlusswort, vielleicht noch besser werdend verbessert durch "so oder so"! ;)

      @ALL-g-n8! :)
      Avatar
      schrieb am 03.06.08 22:19:05
      Beitrag Nr. 757 ()
      Antwort auf Beitrag Nr.: 34.231.109 von Totti_78 am 03.06.08 22:00:29Die Einen sagen es, nichts genaues wissen die Anderen! ;)

      ...auf jeden Fall knattert Sie/Er/Es in allen Threads um die Wette! :laugh:

      derschweizer
      Avatar
      schrieb am 03.06.08 22:16:15
      Beitrag Nr. 756 ()
      Irgendwie ist es eine blöde Zeit, Sommerzeit eben. Eigentlich schade...

      :rolleyes:

      ...aber auch diese Zeit wird vergehen und dann wird die Zeit der Fakten folgen. ;)
      Avatar
      schrieb am 03.06.08 22:10:08
      Beitrag Nr. 755 ()
      Antwort auf Beitrag Nr.: 34.218.549 von tzadoz am 02.06.08 15:40:21
      Ich habe vor, voraussichtlich (Ende) nächste Woche ein paar Stücke zu kaufen.


      Dann beeil dich mal besser.
      Ich bin seit heute bereits "vollverzinkt"!:D:D

      Gruss
      supernova
      Avatar
      schrieb am 03.06.08 22:03:18
      Beitrag Nr. 754 ()
      Antwort auf Beitrag Nr.: 34.230.936 von derschweizer am 03.06.08 21:40:14.

      :p



      .
      • 1
      • 352
      • 428
       DurchsuchenBeitrag schreiben


      Think big - think ZINC! Trevali Resources Produzent in 6 Monaten