checkAd

    ABM Resources - bereitet sich auf Produktionsstart vor - 500 Beiträge pro Seite

    eröffnet am 27.03.15 17:59:21 von
    neuester Beitrag 27.02.19 17:54:36 von
    Beiträge: 188
    ID: 1.210.268
    Aufrufe heute: 0
    Gesamt: 19.926
    Aktive User: 0

    ISIN: AU0000012494 · WKN: A2JMPV · Symbol: PRX
    0,0030
     
    AUD
    0,00 %
    0,0000 AUD
    Letzter Kurs 02:06:35 Sydney

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    0,5400+21,35
    0,7000+18,64
    1,2000+14,29
    37,18+10,00
    6,7700+9,90
    WertpapierKursPerf. %
    6,7400-10,01
    6,3600-10,04
    1,2000-10,45
    0,7696-13,53
    47,96-97,97

     Durchsuchen

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 27.03.15 17:59:21
      Beitrag Nr. 1 ()
      Wer einen Goldexplorer mit hohen Gehalten sucht, den möchte ich hiermit auf einen australischen Explorer aufmerksam machen, ABM Resources.
      Ein paar Eckpunkte die da wären:
      die Goldressourcen von der Old-Pirate-Lagerstätte hat insgesamt 1,7 Mio. Tonnen mit einem durchschnittlichen Goldgehalt von 11,7 g/t = 640.000 Unzen Gold. Hiervon liegen 820.000 Tonnen mit im Schnitt 8,5 g/t und damit 225.000 Unzen Gold als angezeigte Ressourcen vor und weitere 410.000 Unzen Gold (880.000 mit durchschnittlich 14,7 g/t Gold) als abgeleitete Ressourcen.
      Die Vorbereitungen für den Produktionsstart laufen, Produktionsbeginn ist im Mai/Juni zu erwarten. Mit kleinen Verzögerungen ist zu rechnen, da die geleaste Coyote Mühle erst mal wieder zum laufen gebracht werden muss.
      Die Planung für das erste volle Produktionsjahr bei Old Pirate ist:50.000 bis 60.000 Unzen Gold zu Betriebskosten von 690 bis 790 AUD je Unze.
      Mit den Abbauarbeiten des goldhaltigen Materials wurde bereits begonnen.
      Anhängig vom AUS$/Goldpreis hat ABM noch die Möglichkeit die Buccanner Lagerstätte mit durchschnittlich 2,5 g/t Gold = 1.248.000 Unzen Gold in Produktion zu bringen.
      Sie halten große Landpakete die immer wieder erstaunliche Werte bringen, z.B. bei Old Glory Süd 6m @ 37.8g/t gold oder Oberflächenproben mit bis zu 161g/t Gold.
      Mit der Independence Group (IGO) hat ABM ein JV bei Lake Makay Projekt.
      Das war es erst mal zum aufwärmen, so Ihr mehr erfahren wollt verweise ich auf die Webseite www.abmresources.com.au, dort findet Ihr ausreichend Lektüre um Euch selbst ein Bild zu machen.
      Auch bei hotcopper sind immer wieder sehr fachliche und informative Beiträge zu finden(neben dem üblichen emotionslastigen ...).
      ABM hat sehr viele Projekte die erhebliches Potential in sich bergen.
      Sowie freier Cashflow generiert werden kann, dürften die spannenden Zeiten bei ABM erst beginnen.
      Wünsche Euch viel Spaß beim stöbern, sollte sich lohnen.
      grenzwall
      Avatar
      schrieb am 29.03.15 13:57:24
      Beitrag Nr. 2 ()
      Vielen Dank für den Hinweis und für die ausführliche Erklärung!

      Das ist auf jeden Fall eine Überlegung wert und ich werde mir das mal durch den Kopf gehen lassen.
      Avatar
      schrieb am 31.03.15 16:57:47
      Beitrag Nr. 3 ()
      Der Chartverlauf spricht an sich eine klare Sprache.
      Wie so oft hat auch diese Medaille zwei Seiten.
      Der Kurs von ABM im Juli 2012 ca. 0,60 AUS$ bei einem Goldpreis von ca. 1.548,- AUS$, ABM hatte eine MC von ca. 146,- Mio.
      Der Kurs von ABM aktuell 0,225 AUS$ bei einem Goldpreis von 1.563,- AUS$,
      ABM hat eine MC von 79,- Mio AUS$.
      Nun sind in den letzten Jahren entscheidende Hürden genommen worden,
      wie unterschiedlich diese wahrgenommen und bewertet werden, für mich erstaunlich.
      Unabhängig vom Produktionsstart und einer Marge die ein abtauchen des Goldpreises (selbst in AUS$) verkraften würde, sind sinkende Kurse möglich.
      Avatar
      schrieb am 01.04.15 18:00:36
      Beitrag Nr. 4 ()
      Ein langfristig tragendes Element könnte das JV mit IGO / Independence Group NL werden.
      Das Lake Mackay Project ist für Gold wie für Basismetalle aussichtsreich.
      Frühere Bohrungen ergaben zum Beispiel Kupfer und Gold auf dem Tekapo Prospect,
      16 m die 3.4g/t gold und 4m mit 2.67% Kupfer (7/01/2010).
      Aktuelle Ergebnisse von IGO z.B. auf Tekapo (8m @ 1.57 g/t Au)
      Magmatic Ni potential
      • 7km x 5km Ni geochem anomaly
      • 1.60% Ni, 1.61% Co and 38.5%Mn in rockchip sampling
      Lake Mackay bietet IGO viele gute Ansatzpunkte für die Exploration.
      Das IGO in der Lage ist vorhandene Lagerstätten auch zu finden und die selbigen zur
      Produktion zu bringen haben Sie gezeigt.
      Die fachliche Kompetenz und der finanzielle Spielraum von IGO bringen für mich großen Vertrauen in diese JV.
      Avatar
      schrieb am 05.04.15 22:07:20
      Beitrag Nr. 5 ()
      Kernstück ist aktuell das Old Pirate Projekt für ABM.
      Die Lagerstätte Old Pirate ist in seiner Strucktur speziell. Das Gold befindet sich in einem verzweigten Venensystem. Über den genauen Aufbau und die Art der Entstehung dieses Systems scheint man sich zumindest noch nicht sicher.
      ABM sah sich gezwungen ein Sterilisationsprogramm aufzulegen.
      Damit sie sicher sein können, dass Ihr Camp nicht auf einer weiteren Ader plaziert wird. Solche Probleme hätten wohl einige Explorer gern.
      Das ganze hat ABM aber Zeit und Geld gekostet, einer der Punkte für den aktuellen Kursstand der Aktie.
      Der Abschnitt Golden Hind hat bei früheren Bohrungen zB :
      Bohrloch GHRC100014: 42 m mit 44,02 g/t Gold und darin 15 m mit 118,5 g/t Gold;
      Bohrloch GHRC100024: 20 m mit 10,59 g/t Gold und darin 11 m mit 18,4 g/t Gold Bohrloch GHRC100021: 21 m mit 9,52 g/t Gold und darin 15 m mit 13,2 g/t Gold.
      Von Old Glory wurden zB gemeldet:
      - 6 metres averaging 37.82g/t gold with a peak value of 120g/t gold from 12 metres down hole.
      - 4 metres averaging 33.47g/t gold with a peak value of 106g/t gold from 12 metres down hole.
      - 1 metre grading 122g/t gold from surface.
      - 1 metre grading 49.6g/t gold from 11 metres down hole.
      Wie gesagt, Sie sind sich nicht sicher welcher Art der Ursprung dieser Adern ist. Die Ergebnisse der laufenden Bohrungen werden hoffentlich etwas Licht in die Angelegenheit bringen. Leider weis ich nicht, bis in welche Tiefe gebohrt wird.

      Trading Spotlight

      Anzeige
      Kurschance genau jetzt nutzen?mehr zur Aktie »
      Avatar
      schrieb am 09.04.15 10:24:57
      Beitrag Nr. 6 ()
      Northern Star Resources ist derzeit in der Tanami Region aktiv geworden und bringt dadurch die angrenzenden Firmen mit in den Fokus.
      Bei hotcopper ist man sich nicht sicher, ob ABM ebenfalls ein Übernahmekandidat ist.
      Nachfolgend ein Beitrag aus dem hotcopper Forum mit einer schönen Übersicht zur erwarteten Produktion. Ich würde die Produktionskosten für die ersten zwei /drei Quartale etwas höher ansetzen. Einige Ausfalltage sind immer einzuplanen und die Optimierung einzelner Prozesse an der Anlage benötigt ebenfalls Zeit.
      Von "markh1960 Date: 09/04/15" eingestellt.
      As a share holder I am not at all interested in a takeover right now unless they have very deep pockets, like $2 now - $4 in a year or so.

      Way too close to producing profit, working capital a self sustained future, organic growth

      Todays Price per oz $1558 AU
      - say $800 cost per oz (upper end)
      = $758 per OZ profit
      x 60k oz (as per recent revised production forecast)
      = $45,480,000 P.A tax free profit
      x average sector P/E ratio of 12 (12 mid 14 upper)
      = $545,760,000 AU Market Cap
      divided by the shares on issue 315,000,000
      =$1.75 price per share (in production valuation based on profit)

      What value this

      Highest grade Gold at surface
      Mine plan designed and tested over the last year, in order to get it right
      2nd Resource is already proven for expansion
      Near mine targets identified
      off site processing plant secured
      backup plant in place at the ore body
      joint venture high grade metals indicated Lake McK
      30,000 square kms central Tanami exploration land tied up(largest land holder)
      pretty much virgin land, the same geological event as the other two largest gold producing regions in the world.

      Money in the Bank
      No debt
      Avatar
      schrieb am 09.04.15 11:55:48
      Beitrag Nr. 7 ()
      In einem Artikel über Northern Star wird ABM genannt.
      Der entsprechende Auszug:
      ..." The takeover proposal for struggling Tanami Gold (NYSE:TAM) came as a surprise to many observers, your humble scribe included, especially since fellow miner Metals X (ASX:MLX) had been trying to get a deal with this company over the line as well. Tanami Gold was one of the first victims of the current gold bear market when it had to close its only asset, the Coyote mine in the remote Tanami region a couple of years ago. The sudden interest by Northern Star Resources as well as Metals X might well be rooted in a hidden agenda, perhaps involving Newmont Mining's nearby Tanami mine.
      If this speculation proves true, then neighboring junior explorer ABM Resources (ASX:ABU) might well also be part of a scheme to consolidate the Tanami district. We might ponder a speculative position in ABM Resources, depending on how this story develops."...
      Wer an dem ganze Artikel interessiert ist dann hier richtig:
      http://seekingalpha.com/article/3054356-northern-star-has-ru…
      Avatar
      schrieb am 14.04.15 10:02:28
      Beitrag Nr. 8 ()
      Heute neues Update zum Stand der Dinge,
      Mine Site Development and Mining Operations on track:
      o High ‐ grade veins exposed with visible gold
      o Stockpiling of gold ‐ bearing quartz(“ore”)and mining of waste‐rock continues
      o Drill and Blast activities have commenced
      o Assay laboratory installed and operational.
       Coyote Gold Plant maintenance works progressing on schedule with commissioning expected in May.
       All key personnel appointments in place
      Den kompletten Text mit Bildern findet Ihr hier:
      http://www.asx.com.au/asxpdf/20150414/pdf/42xw6kgvdq8wp5.pdf
      *
      Dazu läuft noch das Bohrprogramm, welches auch bald News liefern wird.
      (10,000m drilling)
      Avatar
      schrieb am 15.04.15 14:14:56
      Beitrag Nr. 9 ()
      wie hart wird bei ABM nun wirklich gearbeitet?
      Bei den Aussi- Aktionären wurde gemurrt, es gäbe zu wenig Bilder von den laufenden Arbeiten bei Old Pirate.
      Auf hotcopper hat nun bruce13 heute abhilfe geschaffen:

      Damit sind wohl die letzten Zweifel an der Redlichkeit von ABM beseitigt.
      Avatar
      schrieb am 15.04.15 14:34:49
      Beitrag Nr. 10 ()
      Nun aber, die Mädel´s machens einem aber auch nicht leicht.
      [img][/img]
      Avatar
      schrieb am 16.04.15 18:06:06
      Beitrag Nr. 11 ()
      Zu den Liegenschaften von ABM gehört auch das North Arunta Projekt.
      Es beherbergt mehrere große ungetestete Goldanomalien.
      Einige Ziele haben bei früheren Bohrungen unter anderem folgende Werte gebracht:
      • Kroda – 14km of anomalism with 4 main target areas including drillhole intercepts of 57m@3.83g/t Gold and 29m @ 6.48g/t Gold.
      • Tulsa – 10km of anomalism.
      • Stafford – 20km of anomalism with 10 main target areas. Drillhole intercepts include 35m @2.02g/t Gold, and 2m @18.15g/t Gold. Rock chip results include >20% Copper and >200g/t Silver.



      Kroda 3 Discovery
       400m strike main trend at Kroda 3.
       125m strike high grade breccia pipe 25 –40m in width.
       Confirmed to 200m+ depth.
      Significant Drill Results:
       57m @ 3.83g/t gold incl.: 29m @ 6.38g/t gold, incl.:12m @ 5.69g/t gold.
       91m @ 1.44g/t gold incl.:33m @ 3.22g/t gold incl.:24m @ 4.28g/t gold.
      Extensional Gold + base metal potential
       14 km of surface anomalism around Kroda.
       10km of surface anomalism on nearby Tulsa Trend.
       Close to Stuart Highway + Rail + Gas.
       Recent airborne EM survey generated sulphide targets.
      .
      Für die weitere Entwicklung bei ABM gibt es reichlich Spielraum.
      So Sie es schaffen die Produktion aufzunehmen und positiven Cashflow
      zu erwirtschaften, sollte auch mit einer Wiederaufnahme der Aktivitäten
      bei North Arunta zu rechnen sein.
      Avatar
      schrieb am 18.04.15 11:39:49
      Beitrag Nr. 12 ()
      In der direkten Nachbarschaft von ABM kommt jetzt Bewegung rein.
      Am 13.4.15 meldete Northern Star Resources "the Shareholders in Tanami Gold NL (ASX: TAM) have voted overwhelmingly in favour of a resolution approving the proposed joint venture between Tanami and Northern Star.
      As part of the joint venture, Northern Star will progressively acquire from Tanami a 60 per cent interest in the Central Tanami Project (see ASX release dated 26 February 2015)."
      NST hat in den letzten zwei Jahren nachgewiesen, dass auch in dem aktuellen Marktumfeld mit Goldminen Geld verdient werden kann. Sie haben einige schwierige Minen in Betrieb gebracht, underground wie open pit.
      Zum einen lenkt NST durch seine Marktpräsenz den Focus größerer Investoren auf die Tanami Region und für ABM könnte es mit seinen Projekten in direkte Nähe von NST in Richtung JV/Nutzung der Mühle interessant werden.

      ABM´s Hyperion Projekt (confirmed mineralisation over a 600m strike length and Hyperion South has confirmed mineralisation over a 250m strike length.)
      bietet sich da förmlich an (Drilling Results include:
      • 35m @ 5.43g/t Gold
      • 10m @ 17.27g/t Gold).

      .Suplejack ist ebenfalls nah genug.
      Positiv ist die Entwicklung allemal.
      Die Frage ist für mich, wie verkraftet NST das eigene Wachstum.
      Zu schnelle Expansion hat so manchen ins straucheln gebracht.
      Avatar
      schrieb am 19.04.15 21:22:27
      Beitrag Nr. 13 ()
      zum Suplejack Project
      Im Oktober 2014 meldete ABM die Optionsvereinbarung mit Ord River Resources Limited ("ORD").Suplejack liegt nur 25 Kilometer nördlich von 100% unternehmenseigenen Goldprojekt Hyperion. ABM sicherte sich damit den Zugriff auf 60 Kilometer Länge des sehr aussichtsreichen Suplejack Trend - der gleiche geologischen Scherzone auf dem sich auch die mehrere Millionen Unzen Groundrush Goldlagerstätte befindet, im Süden von Hyperion.
      Ein paar Zahlen dazu:
      10 Kilometer lange Zone mit anomalen Goldwerten.
      Tregony Prospect:
      - 3 km um 300 Meter-Zone von low-grade und hochgradige Goldabschnitte in Bohrungen.
      - Hochwertige Gold-Potenzial, einschließlich vorherigen Bohrergebnisse von:
      * 3 Meter mit durchschnittlich 106.3g / t Gold von 109 Metern im Bohrloch.
      * 5 Meter mit durchschnittlich 34,4 g / t Gold ab 60 m im Bohrloch.
      * 2 Meter mit durchschnittlich 67.3g / t Gold von 102 Metern im Bohrloch.
      * 3 Meter Mitte 44.6g / t Gold ab 67 m im Bohrloch.
      * 4 Meter Mitte 18.47g / t Gold von 115 Metern im Bohrloch.
      * 10 Meter mit durchschnittlich 5,57 g / t Gold ab 59 m im Bohrloch.

      Darren Holden, Managing Director of ABM Resources said, "ABM's short-term priority is to develop the high-grade Old Pirate gold project at Twin Bonanza. However, our medium term to long term strategy remains to unlock the potential of new and existing gold discoveries throughout the whole region.
      Avatar
      schrieb am 22.04.15 13:29:55
      Beitrag Nr. 14 ()
      Am 14.05.2014 wurden der Kauf von 3 Explorationslizenzen gemeldet.
      Zwei der Lizenzen grenzen direkt an das Twin Bonanza Gold Camp von ABU an.
      Perth, May 14, 2014 AEST (ABN Newswire) - ABM Resources NL (ASX:ABU) ("ABM" or "the Company") is pleased to announce that it has reached terms to acquire 567 square kilometres of exploration licence applications in the Central Desert Region of the Northern Territory from Toro Energy Limited (ASX:TOE).

      Die Details gäbe es hier nachzulesen:
      https://au.finance.yahoo.com/news/abm-resources-nl-asx-abu-0…
      EL 27.589 Umfasst eine Fläche von 355,6 Quadratkilometern. Das Syrene-Prospekt liegt in direkter Nachbarschaft von ABU´s - Vampire, wo frühere Oberflächengesteins-Proben bis zu Gold 83g/t.
      Syrene liegt 10 Kilometer nordöstlich der Old Pirate Goldlagerstätte.
      Der 13 Kilometer lange Port-Starboard Trend von ABU verläuft genau in die Fläche von EL 27.589 hinein.
      EL 27.589 besteht aus der gleichen Gesteinssequenz wie die Old Pirate Goldlagerstätte.
      Weitere Daten und Bilder zu Vampire wären hier:
      http://clients3.weblink.com.au/wcnewstemp/01534503.pdf
      Avatar
      schrieb am 22.04.15 13:40:17
      Beitrag Nr. 15 ()
      Bilder sagen mehr als ...
      zur Geologie / Killi Killi Formation

      Vampire
      Avatar
      schrieb am 23.04.15 16:25:33
      Beitrag Nr. 16 ()
      Bei der Strategie des ABM Managment gab es in den letzten Jahren hier und da mal einen Schwenk. Was verständlicherweise bei vielen Aktionären für Irritationen sorgte. Diese Kurswechsel sind für mich teilweise der geologischen Strucktur der Lagerstätten geschuldet.
      (Mal den allgemeinen Goldmarkt außen vor gelassen.)
      Mit dem wachsenden Verständnis der Lagerstätten muss natürlich auch die Planung des Unternehmens angepasst werden. Zeitliche Verzögerungen und steigende Kosten mit entsprechender Ausweitung bei der Anzahl der Aktien
      waren noch nie gern gesehen bei den Aktionären.
      Buccaneer Porphyry Gold Deposit und Olp Pirate können kaum unterschiedlicher sein, was Ihre mineralische Strucktur und die Erfordernisse für den Abbau betrifft.
      *
      Heute gab es mal wieder einen Eintrag von "Helmenesh", dessen Beiträge ich sehr schätze und diese auch jedem nur empfehlen kann.
      Auszügen in englisch habe ich eine deutsche Version angehangen, bitte habt Nachsicht bei der Qualität(Übersetzungsprogramm)
      *
      "I am glad that my earlier posts were informative to you, I wish to reiterate that much of what I write about the possible models of ore genesis and the gold mineralisation of these prospects is based on geological concepts applied to very limited and superficial data released to the public by ABM. It is therefore very theoretical and in time you will find that a much clearer picture will emerge about the geological models and settings that were responsible for the emplacement of the mineralisation in this region.
      As a prelude to answering your questions let me remind you that compared to other gold mining camps, this region of the Arunta Block has been very meagrely explored, it is possible that it could become a giant field like so many other great fields- Not only of gold eiither- that were discovered by good explorationists on this great continent of ours over the last 170 years.
      This region is undoubtedly one that has alluded many early prospectors despite it having much outcropping gold, this is possibly attributed to its remoteness and paucity of surface water. There will undoubtedly be other major fields that will be discovered (particularly of the concealed category) with the aid of the sophisticated technology that is developed and being applied to exploration in this century.
      The company focused on surface testing to sub-cropping depths of up to 5m depth. with very little drilling. Even the drilling that was done; focused on confirming the continuity of veining with depth which gave positive commercial results, including intersections of vein, disseminated and nuggetty gold mineralisation to depths of up to 150m or so. Some holes also confirmed that the veins pinch and swell (thicken and thin) with depth. But, I don't recall seeing detailed lithological or structural sections in any of the reports.
      Because of the nuggetty nature of the mineralisation, the drill hole spacing was not sufficiently concentrated to allow a JORC assessment beyond the Indicated or inferred categories and into the proven category. The nuggetty nature and general distribution of gold mineralisation in all gold deposits make it very difficult if not impossible and demand extremely expensive exercises in exploratory drilling to attempt to aim for proven gold resources.
      Nevertheless, the average grades in the ABU prospects are exceptionally high with comparison to other fields. This encouraged the company to continue the extremely detailed hands and knees type mapping and testing of the surficial exploration and bulk testing with confidence. Furthermore, the zones of outcropping rich veins are quite extensive in strike length and in number which are proving large enough to be mined on a standalone basis. And, as BOBMINER mentioned in his recent posts, this surface testing will reveal more spurs and veins which will culminate into wider mining zones, albeit with some dilution in the average grade.
      So, to define a confident assessment of the models of mineralisation at play in the ABU camp and the region, a substantial amount of regional geophysics followed by extensive core drilling followed by meticulous logging, chemical and structural analysis will have to be carried out. And, I suspect what will be revealed is that the region may host porphyritic intrusions that are significantly larger than Buccaneer, quartz vein deposits like the Old Pirate and others and possibly peripheral fine grade disseminated gold deposits in the intruded sediments.
      I think the next 50 years of exploration and exploitation in this field will yield many very interesting deposits. It’s a pity I will not be around as a spectator to witness it!
      *
      Ich bin froh, dass meine früheren Beiträge waren informativ, Ihnen möchte ich noch einmal betonen, dass vieles von dem, was ich schreibe über die möglichen Modelle Erz Genese und der Goldmineralisierung dieser Aussichten auf geologische Konzepte angewendet, um sehr begrenzte und oberflächliche Daten veröffentlicht die Öffentlichkeit durch ABM. Es ist daher sehr theoretisch und mit der Zeit werden Sie feststellen, dass ein viel klareres Bild wird über die geologischen Modelle und Einstellungen, die für die Einlagerung der Mineralisierung in dieser Region verantwortlich waren entstehen.
      Als Auftakt auf Ihre Fragen lassen Sie mich daran erinnern, dass im Vergleich zu anderen Goldminencamps, diese Region des Arunta Sperren ist sehr spärlich erforscht, ist es möglich, dass es ein riesiges Gebiet wie so viele andere große Felder-Nicht nur werden von Gold, die von Entweder-gute benutzen Forscher auf diesem großen Kontinent von uns in den letzten 170 Jahre entdeckt wurden.
      Diese Region ist zweifellos eine, die viele frühe Prospektoren, obwohl es mit viel zu Tage tretenden Goldangespielt hat, ist dies möglicherweise die Abgeschiedenheit und Mangel an Oberflächenwasser zurückzuführen. Es wird zweifellos andere wichtige Bereiche, die mit Hilfe der hoch entwickelte Technologie, die entwickelt wird und an Exploration in diesem Jahrhundert angewendet entdeckt wird (insbesondere des verdeckten Kategorie) sein.
      Das Unternehmen konzentriert sich auf Oberflächenprüfung auf Unter Zuschneiden Tiefen von bis zu 5m Tiefe. mit sehr wenig Bohren. Selbst die Bohrung, die getan wurde; das sich auf der Bestätigung der Kontinuität der Adern mit Tiefe, die positive Geschäftsergebnisse gab, einschließlich Schnittpunkte der Vene, verbreitet und Nuggetty Gold-Mineralisierung in Tiefen von bis zu 150 m oder so. Einige Löcher bestätigte auch, dass die Adern eingeklemmt und quellen (verdicken und dünn) mit der Tiefe. Aber, ich glaube nicht daran erinnern, dass detaillierte lithologische oder Profilen in einer der Berichte.
      Aufgrund der Nuggetty Art der Mineralisierung, war der Bohrlochabstand nicht ausreichend konzentriert, um eine JORC Beurteilung über die angezeigte oder abgeleiteten Kategorien und in den bewährten Kategorie ermöglichen. Die Nuggetty Natur und Verteilung der Goldmineralisierung in allen Goldvorkommen machen es sehr schwierig, wenn nicht unmöglich, und die Nachfrage sehr teuer Übungen in Erkundungsbohrungen zu versuchen, für bewährte Goldressourcen abzielen.
      Dennoch sind die Durchschnittsnoten in den ABU Aussichten außerordentlich hoch mit Vergleich zu anderen Bereichen. Dies veranlasste das Unternehmen, um die extrem detailliert Händen und Knien Typzuordnung und Prüfung der oberflächliche Exploration und Groß Prüfung mit Zuversicht weiter. Darüber hinaus sind die Zonen der zu Tage tretenden Adern reichen recht umfangreich in Streichlänge und in der Anzahl, die beweisen, groß genug, um auf eigenständiger Basis abgebaut werden. Und, wie BOBMINER in seinem neuen Artikel erwähnt, diese Oberflächenprüfung mehr Sporen und Venen, die in größeren Bergbauzonen gipfeln wird, wenn auch mit einigen Verdünnung im Notendurchschnitt zu offenbaren.
      Also, um eine selbstbewusste Einschätzung der Modelle der Mineralisierung in der Spielanteile in der ABU Lager und in der Region zu definieren, wird ein wesentlicher Teil der regionalen Geophysik, gefolgt von umfangreichen Kernbohrungen gefolgt von sorgfältiger Protokollierung, chemische und strukturelle Analyse müssen durchgeführt werden. Und ich vermute, was enthüllt werden ist, dass die Region kann porphyrischen Intrusionen, die deutlich größer ist als Buccaneer sind Gastgeber, Quarzaderablagerungen wie der Alte Piraten und andere und möglicherweise periphere feinkörnigen verbreitet Goldvorkommen in den eingedrungenen Sedimenten.
      Ich denke, die nächsten 50 Jahre der Erforschung und Ausbeutung in diesem Bereich werden viele sehr interessante Ablagerungen ergeben."
      Avatar
      schrieb am 23.04.15 17:57:32
      Beitrag Nr. 17 ()
      Bei Old Pirate ist da Gold in schmalen Venen/Quarzadern. In Folge dessen ist der Abbau speziell und eine klassische Ressourcenschätzung nur begrenzt möglich. Für Old Pirate ist für erste ein Tagebau geplant.
      Was an Erz in der Tiefe wartet und wenn ja in welcher Form, dass ist für mich der spannende Teil.
      So hohe Werte an der Oberfläche und in dieser Ausdehnung, lassen einiges in der Tiefe hoffen.

      *
      Avatar
      schrieb am 24.04.15 09:45:41
      Beitrag Nr. 18 ()
      Heute erschien der neue Report für das letzte Quartal,für die 3 Monate zum 31. März 2015
      Zu ersehen hier:
      http://www.asx.com.au/asxpdf/20150424/pdf/42y2qkzy65lp74.pdf
      oder kurz die wichtigsten Punkte(Übersetzungsprogramm):
      Old Pirate hochgradige Goldprojekt (Old Pirate) Fortschritte zu Bergbau
      Im Laufe des Quartals der Gesellschaft benannten Bergbauunternehmen, abgeschlossene Mobilisierung Ausrüstungen und Infrastruktur in die Old Pirate Mine vor Ort, und begann Bergbau.
      Arbeiten in diesem Quartal durchgeführt waren die Abstufung der Zugriffsspur (für Kraftverkehr)
      Mutterboden Clearing von den Bergbaugebieten und taubes Gestein Muldenbereiche, Aufnahme der Abfall Gesteinsbergbau (Vorband) und Abbau von Gold Lagerwerkstoff ("Erz").
      Das Lager und Büro Infrastruktur im Old Pirate wurde ebenfalls aktualisiert.
      Der Bergbau im Old Pirate schrittweise Freilegung der goldhaltigen Quarzadern einschließlich in Bereiche, die nicht bereits in der Testbergbau aus. Bis heute sind die neu freigelegten Quarzadern sind in der Regel in einer Linie mit geologischen Interpretation des Unternehmens für das Projekt. Klasse Kontrollprobenentnahme und Kartierung ist im Gange und Grob sichtbares Gold beobachtet.
      Lizenz-drängen von Erz vor Ort bei Old Pirate fortgesetzt. Das Ziel ist, 10.000 Tonnen an Material zu lagern und bereit für den Kraftverkehr im Mai.
      Highlights:
       Beginn Bergbau & Lagerung im Old Pirate hochgradige Goldprojekt
       Exposed hochgradige Gold-Quarzadern rund um Haupt Erzzonen
       Begann Sanierung des Coyote Gold-Anlagen
       Priorisierte extensional Gold-Ziele für das Bohren in das kommende Quartal
       Erweiterte Lizenz halten um Nickel-Kobalt und Mangan-Ziele
      am Warumpi Margin Project (ABM-IGO alliance)
       Abgeschlossene Kapitalbeschaffung
       Starke Cash-Position mit $ 22,7 Mio. und schuldenfrei
      Avatar
      schrieb am 30.04.15 17:37:10
      Beitrag Nr. 19 ()
      Wenn es ans produzieren geht, kommt zwangsläufig die Frage nach dem durchschnittlichen Produktionsvolumen, Grade je Tonne, Höhe der Goldmenge aus dem Material und so weiter.
      Genaues Zahlenwerk ist dazu kaum zu liefern.
      Die Goldkonzentration innerhalb der Venen schwankt enorm, 5 g/t oder 15 g/t machen einen erheblichen Unterschied auf alle nachfolgenden Parameter.
      Die Form der Venen, gestaltet den Abbau schwierig und schwer kalkulierbar.
      Nachfolgend einige Bilder dazu.



      Über die Lebensdauer der Mine mache ich mir aktuell keine Gedanken.
      Old Pirate ist in alle Richtungen offen, das reicht mir als Info aus.
      Zum Glück haben sich die Zeiten ja auch technisch geändert und der Abbau der Venen ist inzwischen leichter.

      *
      ABM hatte mal einen Testbetrieb auf Old Pirate laufen lassen.
      Die Zahlen auf dem nächsten Bild vermitteln einen ganz guten Eindruck von dem, was man bei der Produktion erwarten kann.

      Was ABM mit der einsatzbereiten Pilotanlage für Planungen hat, kann ich leider nicht sagen.
      Avatar
      schrieb am 02.05.15 12:29:06
      Beitrag Nr. 20 ()
      Chance - Risiko
      Das ist dann mal der schwerste Teil des Ganzen.
      Das Potenzial hat ABM und die Produktion sollte mit den üblichen Anlaufverzögerungen aufgenommen werden.
      Die ersten Barren sollten so Ende Mai gegossen sein.
      Durch die hohen Gradzahl, hat ABM einen ausreichenden Puffer, falls der Goldpreis in AUD/$ stärker nachgeben sollte.
      Beim Preis in US/$ rechne ich bis Spetember/Oktober damit, dass wir die
      1000,- oder drunter sehen werden. Wo dann der Aussi$/CAD oder der Euro steht
      keine Ahnung.
      Wovon ich langfristig ausgehe ist, dass Gold in zwei drei Jahren neu wahrgenommen werden wird.
      Warum? z.B. China, die Auswahl der Farben ist zu beachten

      * Chinas Umgang mit physischem Gold / Chinas Planungen mit der eigenen Währung / Chinas Vorstellungen über eine Weltwährung (als Verrechnungsgröße für den weltweiten Handel)
      * die Preisgestaltung beim Gold wird sich verstärkt nach dem physischen Markt
      richten
      Für alle, die an eine ausgewogene Preisgestaltung beim Goldpreis glauben, nachfolgendes ist als Anregung für eigene Gedankenspiele gedacht:
      In einer 24-seitigen Broschüre der BIZ aus dem Juni 2008 präsentierte “die Zentralbank der Zentralbanken“ des Weiteren auf Seite 17 als Dienstleistung unter anderem folgenden Punkt: “Gold & Forex Services – Interventions”

      Dass die BIZ im Goldmarkt interveniert, ließ BIZ-Ökonom William R. White im Juni 2005 durchblicken, als er zu den “unmittelbaren Zielen der Zusammenarbeit von Zentralbanken“ zählte, dass man mit “vereinten Anstrengungen“ die Preise für Vermögenswerte beeinflussen könne, “wo dies als nützlich erachtet wird“ – und das gälte insbesondere für Gold und Devisen.
      Wobei natürlich in beide Richtungen gearbeitet werden kann.
      * Als neue Weltwährung kommen immer deutlicher die SDR der BIZ in den Fokus.
      Eine Kostprobe: Lord Meghnad Desai, Vorsitzender des Official Monetary and Financial Institutions Forum, sagte übrigens gegenüber Bloomberg, dass die Special Drawing Rights (SDR) des Internationalen Währungsfonds “ein wenig Gold“ beinhalten sollten, und das werde “ziemlich wahrscheinlich geschehen“.
      Im Ganzen nachzulesen hier http://etfdailynews.com/2015/04/14/lses-lord-desai-warns-gol…" target="_blank" rel="nofollow ugc noopener">http://etfdailynews.com/2015/04/14/lses-lord-desai-warns-gol…

      Beim Liborskandal wurden die sogenannten Verschwörungstheoretiker 4 Jahre
      massiv verunglimpft, bis es dann plötzlich in aller Munde wahr.
      Das Thema SDR entwickelt sich seit 2 Jahren, mal schauen was daraus wird.
      Sollte Gold einen Teil des Bewertungskorbes der SDR werden, dann werden die Karten neu gemischt.
      .
      Aufgrund der aktuellen Entwicklungen ist es möglich, dass sich die Goldförderer noch über jede Unze freuen werden, die nicht zu aktuellen Preisen verkauft werden mußte.
      Avatar
      schrieb am 15.05.15 09:42:54
      Beitrag Nr. 21 ()
      Auf ASX heute gemeldet:15 May 2015
      Update on the Development of the Old Pirate High-Grade Gold Deposit
      http://www.asx.com.au/asxpdf/20150515/pdf/42ylbqw3dhr058.pdf
      Avatar
      schrieb am 15.05.15 23:59:47
      Beitrag Nr. 22 ()
      Hoffe, in drei Wochen ein Bild vom ersten Goldbarren einstellen zu können.
      Bin sehr gespannt, wie viel Sie über 10 g/t schaffen werden.
      Avatar
      schrieb am 22.05.15 10:34:03
      Beitrag Nr. 23 ()
      Heute wurde auf hotcopper eine gute Zusammenfassung des aktuellen Standes bei ABM gepostet.
      Von markh1960 Date:22/05/15 Time:15:17:32 Post #: 15333555
      "ABU based on 1st year production forecast
      Approx. 40,000,000 profit per year,
      mine life 7- 10 years based on ore qty at old Pirate (mine commissioning processing due to start today).

      Old Pirate ore body open in lots of directions, proven (from trial mining) 5 times higher than average open pit in Australia.

      Only 350,000,000 shares on issue.

      2 year plant lease land and infestructure secured for $2,000,000 + care fee P.A
      Out right purchase of the above for $3,000,000 secured
      Highest Grade open pit ore there is in Australia
      Low cost producer all in cost 750-850 ish
      Ore from surface
      No hedging.
      No debt
      Approx. $22,000,000 operating cash in the bank
      $11,000,000 rainy day debt facility secured
      Lots of tax free production, for a good while, due to costs so far
      Plant secured and should start rolling "today", re commissioning
      Commissioning complete within two weeks, by end of month.

      Initial commissioning ore, mixed low and high grad for commissioning test run.

      Trial run processed under 10,000 tonnes of ore from surface, and produced over 3,000 oz gold at 87% efficiency.

      2nd Proven ore body (low grade - high volume porphyry deposit), different location, with extensional ground secured, right near the NST owned Central Tanami mine subject of NST take over from Tanami Gold.

      Largest junior land holder in Australia, approx. 30,000 square kms of virgin exploration land in WA and NT Tanami desert, that is part of the same geological event as other two biggest gold procuring regions on earth, many targets already identified.

      Two JV deals in the pipeline, with
      Vango / were Ord River Resources changed name (RE: extensional land to Hyperion Gold reserve) exploration spend is planned for here, by end of next year.
      and
      Independence Group (Lake McKay - encouraging grades Copper Zink Gold identified)

      Next stage, Old Pirate increase production at old pirate.
      Medium Term bring 2nd ore body on line.
      Concurrently explore.

      Cash flow to pay for each next stage expansion.

      approx. 12c-15c cash flow per share generated per year, if production guide is met at current Australian gold price.

      Severe El Nino weather event declared this year, may just extend the mining season, by mitigating the wet season in inland Australia.

      How to work out expected share price (you can choose to be conservative or go with forecast)
      Gold price per oz in AU$
      minus cost
      times oz produced to forecast = about $40,000,000 (profit)
      times average gold sector P/E ratio (look it up) = company market cap after revaluation due to gold production profit made.

      $40,000,000 (profit) x P/E ratio, divided by shares on issue 350,000,000 = share price (based on profit made)

      Use this formula on any producer and you will see it equates.

      Market cap will be effected for the better or worse, depending on cash burn rate, cash in the bank, debt, hedging, unexpected events good or bad, if guidance is met on time.

      I tend to think a wise management has kept ABU off the radar to avoid a
      predatory takeover creaming the profit long term share holder should get.

      Management have a long term expansion growth vision, but growing from profit. this is ultimately for the betterment of long term holders and company security.

      Two 1/4s gold pours post commissioning, should establish true value, within 6 months.

      I have stuck with and believe in this company because of the stated aim, of cash flow to pay for expansion and the highly prospective land holding, plus production starts today.

      Regards MarkH"

      P.S.: Ab heute soll der zweiwöchige Probelauf der Mühle beginnen.
      Avatar
      schrieb am 26.05.15 11:28:10
      Beitrag Nr. 24 ()
      In dem letzten Update vom 150515 wurde darauf hingewiesen, dass beim freilegen der goldhaltigen Adern unbekannte Verzweigungen entdeckt wurden.
      Diese schmalen Adern beim bohren zu treffen ist wohl auch ein Stück weit Glückssache.
      Golden Hint - Old Glory - OP South - OP Central - Western Limb
      Mal rein hypothetisch: diese Lagerstätten erstrecken sich auf ca. 2km.
      Bisher wurde nur in geringer Tiefe gebohrt.
      Es mußten Sterilisationsbohrungen gemacht werden, um sicher zu stellen,
      dass das Camp nicht auf goldhaltigen Boden errichtet wird.
      Beim freilegen der Adern wird nun festgestellt, dass die Ausdehnungen der Vererzungen weiter sind als erwartet.
      So weit sind die einzelnen Lagerstätten nicht von einander entfernt.
      Sollte es sich erweisen, dass es in tieferen Schichten eine Verbindung zwischen den Erzkörper gibt, ist eine neue Super-Pit möglich.
      Nur so ein Gedanke wo die Reise hingehen könnte.


      "New High-Grade Veins Exposed

      At the Old Pirate South pit, extraction of waste on the western side of the pit encountered several high-grade gold bearing quartz veins that were not previously modelled or identified in drilling. These veins contain visible gold and are likely extensions to the known high-grade veins in the Old Pirate South area. This material has been stockpiled as high-grade ore. The veins will be mapped on the next bench to establish overall continuity and geometry.

      Some new gold bearing quartz veins have also been exposed in the north eastern extensions to the Old Pirate Central pit."
      Avatar
      schrieb am 26.05.15 11:41:07
      Beitrag Nr. 25 ()
      ein paar Bilder dazu
      [img]

      Avatar
      schrieb am 18.06.15 09:15:30
      Beitrag Nr. 26 ()
      und los geht es, Meldung heute auf ASX:
      Avatar
      schrieb am 18.06.15 09:32:52
      Beitrag Nr. 27 ()
      der dazugehörige Link
      http://www.asx.com.au/asxpdf/20150618/pdf/42z86tsd09529l.pdf
      Die Abstimmung der Mühle wird noch etwas an Zeit benötigen.
      Bin aber gespannt, auf welche durchschnittliche g/t Sie letztendlich kommen werden.
      Avatar
      schrieb am 22.06.15 22:34:02
      Beitrag Nr. 28 ()
      Mitte/Ende Juli erscheint der nächste Quartalsbericht.
      So Sie bis dahin die Mühle für das Material von Old Pirate einstellen konnten,
      ist mit verlässliche Kennzahlen zu rechnen, dann können auch endlich die Erträge bestimmt werden.
      Laut den alten Daten von TAM ist eine Goldgewinnung bis zu 97% mit der Coyote Mühle möglich.
      Bin auf die Statements gespannt, wie der Cashflow verwendet werden soll.
      Exploration, eine zweite dann eigene Mühle, die Weiterentwicklung einzelner Projekte mit Ressourcendefinition(z.B. Vampire),...
      Bei den Aussis hoffen einige der Anleger auf eine Dividendenzahlung.
      Mit Blick auf die vielen noch zu entwickelnden Projekte von ABM wäre das für mich eine Enttäuschung.
      Avatar
      schrieb am 25.06.15 09:31:33
      Beitrag Nr. 29 ()
      Explorations Update heute auf ASX erschienen
      Der Link dazu
      http://www.asx.com.au/asxpdf/20150625/pdf/42zdkqlg5h78w3.pdf





      Drilling of planned 36 holes for a total of 2,700 metres at Vampire will commence shortly, targeting a variety of veins and vein orientations.
      Avatar
      schrieb am 29.06.15 09:54:33
      Beitrag Nr. 30 ()
      ABM sichert sich Explorations Lizenz von Altura Mining
      der Link dazu
      http://www.asx.com.au/asxpdf/20150629/pdf/42zgtm225h7z5n.pdf

      ABM scheint die Gunst der Stunde zu nutzen.
      Sollte sich mal die Stimmung im Goldsektor wieder erholen,
      werden die Preise andere sein.
      Avatar
      schrieb am 08.07.15 11:41:38
      Beitrag Nr. 31 ()
      wer nicht bis zum nächsten Quartalsbericht warten kann, ein paar Zahlenspiele zur möglichen Produktion
      Heute hat auf hotcopper "bm3121" Date:07/07/15 Time: 18:23:51
      mal eine Kalkulation erstellt.
      "I will try and work out how much gold will be produced from our fully operational plant over the coming year as it ramps up to the 150,000 ton per year as announced on 16/6/15, when first ingot was produced. In this and subsequent announcements, Management have indicated that plant will operate on a 2 weeks (14 days) on and 1 week (7 days) off basis (i.e., 17 x 3 week operating periods per year) and resource to be processed will be mixed to achieve around 4 gms per ton, during initial commissioning period. Taking that the first ingot was produced and also sold before 16/6/15, I would expect more gold has been processed and possibly poured in interim....21 days have again passed.

      Taking that annual target of 150,000 tons (remember 250,000 ton/year plant capacity) is processed over 52 week year period @ means roughly 3000 tons per week. On a 2 weeks on and 1 week off basis, some 4500 tons will need to be put through plant weekly when plant is operational. 4500 tons @ 4 gms/p/ton will mean 18,000gms (30 gms per oz equates to roughly 600oz) produced. Therefore, $1500 x 600oz = $900,000 p/w and $1,800,000 per 2 - 3 week operational period. This equates to roughly $32.3 million per annum turnover. If cost of producing is roughly $800 per oz, then company will have a profit of 600 oz x $700 p/week equates to $420,000; and x 2 = $840,000 per operating period (2 weeks on/1 week off). Therefore, 17 x 3 week periods per year = $14,280,000 profit per year. Total oz of gold produced is roughly 20,400 per year.

      If the resource grade goes up to 10 gms per ton.....obviously, the sums will increase by 250 percent for 1500 ozs produced per week to 3000 ozs per 3 week period. Worth sale price of approx. $4.5million (x 17 periods), making roughly $35,700,000 profit per year. The is some expectation that company will produce 50,000 oz per year so 50k oz x $700 profit/oz = $35,000,000.

      So start up commissioning stage we can expect a profit of $14,280,000 profit, when resource averages 4 gm/t AND $35,000,000 profit when resource averages 10gm/t. Management has indicated we have very rich resource levels well above 10gm/t levels which would feed the plant for many years.
      Avatar
      schrieb am 10.07.15 10:48:18
      Beitrag Nr. 32 ()
      erste Bohrergebnisse mit 19 metres averaging 5.82g/t gold
      Heute update zum laufenden Bohrprogramm erschienen.
      Weitere Ergebnisse sollen in kürze folgen.
      Der Link zur Meldung:
      http://www.asx.com.au/asxpdf/20150710/pdf/42zr2cqf57b0h0.pdf



      Avatar
      schrieb am 16.07.15 11:02:37
      Beitrag Nr. 33 ()
      Update zur Vereinbarung mit Tanami Gold
      Heute auf ASX gemeldet:
      UPDATE ON COYOTE PLANT AGREEMENT WITH ABM RESOURCES NL
      On 7 July 2014 Tanami Gold NL (ASX:TAM) (Tanami) announced that it had reached agreement with ABM Resources NL (ASX:ABU) (ABM), subject to conditions precedent being met, to lease the Coyote Gold Plant (Coyote) and associated infrastructure.
      The agreement includes an option for ABM to purchase Coyote, infrastructure and the underlying mineral leases. The agreement also includes pre-emptive rights on the Company’s surrounding exploration licences. The proposed leasing arrangements and
      associated options were approved by shareholders at an Extraordinary General Meeting held on 25 August 2014.
      It was reported the lease term would commence once the conditio
      ns precedent had been met or waived. The conditions precedent have now been fully met.
      Consequently ABM have now paid $2 millionrent for the Initial Term of the Lease which is a period of 1 year from 14 July 2015.
      Gerard McMahon
      Chairman Tanami Gold
      Avatar
      schrieb am 16.07.15 11:29:23
      Beitrag Nr. 34 ()
      ABM - rolling stone
      update zur Old Pirate Mine
      http://www.asx.com.au/asxpdf/20150716/pdf/42zvf5mrgcsxpb.pdf

      Avatar
      schrieb am 30.07.15 13:26:42
      Beitrag Nr. 35 ()
      Gestern wurde der neue Quartalsbericht veröffentlicht.
      Ab August wird die Mühle mit hochgradigem Material arbeiten.
      Entsprechend werden erst im Bericht für das Septemberquartal verlässliche Produktionszahlen vorliegen.
      Der Link:
      http://www.asx.com.au/asxpdf/20150729/pdf/4303lgt3lmvbcz.pdf
      Avatar
      schrieb am 04.08.15 10:09:05
      Beitrag Nr. 36 ()
      Hoffe auf eine geballte Informationsladung:
      Avatar
      schrieb am 04.08.15 13:39:15
      Beitrag Nr. 37 ()
      Avatar
      schrieb am 17.08.15 10:39:03
      Beitrag Nr. 38 ()
      Heute erschien eine Mitteilung zu : Buccaneer Metallurgical Test-Work
      Details sind hier zu finden:http://clients3.weblink.com.au/wcnewstemp/01650995.pdf
      Avatar
      schrieb am 17.08.15 10:51:45
      Beitrag Nr. 39 ()
      Auf hotcopper finden sich diese beiden Einträge von "Narabu01".
      Ich schätze besonders seine technischen Kenntnisse.
      des weiteren zur Buccaneer Meldung
      Avatar
      schrieb am 17.08.15 22:24:55
      Beitrag Nr. 40 ()
      Buccaneer ?
      Eine Belebung bei Buccaneer hatte ich erst bei einem höheren Goldpreis erwartet. Möglicherweise lag ich da falsch.
      Anfang Juli wurde neue Bohrergebnisse gemeldet, 19m mit 5,82g/t und 2m mit 33g/t bei ca. 50m Tiefe,
      weitere Bohrergebnisse stehen aus.
      Bei früheren Bohrungen gab es auch schon beachtliche Werte, z.B.
      BCR100101 / RC / Tiefe 187m / Länge 7m mit 17,58g/t.
      Sollten die hochgradigen Abschnitte eine längere Ausdehnung haben,
      dann darf bei Buccaneer neu gerechnet werden.
      15 Mio/t mit 2,2g/t für 1,247Moz sollten dann Geschichte sein.
      Ein wirtschaftlicher Abbau wäre ebenfalls machbar.
      Auswirkungen auf die Wahrnehmung/kurs von ABM am Markt ???
      Ich weiß nur, dass GOR eine MC von ca. 253Mio/A$ hat,
      die Gruyere Resource 138Mt mit 1,24g/t Au ca. 5,5Moz entspricht und die
      in ferner Zukunft erhoffte AIC bei 1000,-A$ liegt.
      Avatar
      schrieb am 26.08.15 10:31:32
      Beitrag Nr. 41 ()
      Heute neue Ergebnisse von Hyperion auf ASX gemeldet
      http://clients3.weblink.com.au/wcnewstemp/01654723.pdf
      Avatar
      schrieb am 26.08.15 10:33:43
      Beitrag Nr. 42 ()
      Wenn sich die Ausdehnung der Lagerstätte mit diesen Werten(Länge+g/t) weiter bestätigen sollte, dann ist die alte Ressoucenkalkulation bald Geschichte.
      Avatar
      schrieb am 26.08.15 16:34:37
      Beitrag Nr. 43 ()
      Einige Anmerkungen:
      - die Treffer auf Hyperion erstrecken sich inzwischen auf einer Länge von über 1000m
      - die Funde sind alle in einer relativ geringen Tiefe (Open Pit, Abbaukosten)
      - das Potenzial für Anschlußbohrungen ist vielversprechend, einige Bohrlöcher endeten in der mineralisierten Zone
      - aus einem Text von 2012 „The Hyperion Project is a regional discovery that is located 18 kilometres from Tanami Gold NL's (ASX: TAM) Central Tanami gold deposit, which hosts a JORC Resource of 1.75 million ounces of gold.“
      „Importantly, mineralisation at Hyperion shows geological similarities to Central Tanami.
      - durch die Nähe zu Tanami/NST hat ABU die Möglichkeit, evtl. die Mühle dort zu nutzen
      Avatar
      schrieb am 28.08.15 16:44:47
      Beitrag Nr. 44 ()
      Annual Report Year Ended 30June 2015
      Dem geneigten Leser wurden heute Abend 102 Seiten zur Verfügung gestellt.
      http://clients3.weblink.com.au/wcnewstemp/01656468.pdf
      Wie bei Jahresberichten üblich, wenig neues.
      Auf die Produktionsdaten der Mühle muß wohl bis zum nächsten Quartalsbericht gewartet werden, leider. Sehr wahrscheinlich, dass ein längerer Produktionszeitraum genutzt werden soll um so verläßliche Daten bieten zu können.
      Zu mindest wurde am anvisierten Zahlenwerk nichts geändert.
      (The guidance is for mining and processing of about 150,000
      tonnes of ore in a grade range of 11g/t to 13g/t gold, for an estimated production of between 50,000 and 60,000 ounces at an all - in sustaining cost of between A$750 and A$870 per ounce.)
      Das IGO wieder auf Lake Mackay aktiv ist, freut mich besonders.
      (Independence Group Ltd has continued to actively explore the Lake Mackay region under its option agreement with the Company, and there has been some initial encouragement from a number of prospects there.)
      Von Seiten IGO war kaum noch etwas zu vernehmen, sind wohl mit der SIR Übernahme gut ausgelastet.
      Bin gespannt, wie es mit 38,5% Mangan Fund weiter geht.

      Avatar
      schrieb am 09.09.15 12:42:56
      Beitrag Nr. 45 ()
      Bohrergebnisse
      Neues Zahlenwerk aus dem laufenden Programm wurden heute gemeldet.
      http://www.asx.com.au/asxpdf/20150909/pdf/43168t02z0516f.pdf
      Avatar
      schrieb am 10.09.15 15:58:29
      Beitrag Nr. 46 ()
      Beim Buccaneer Porphyry Gold Deposit lassen die Werte auf eine neue JORC Berechnung hoffen, leider findet sich (noch) kein Hinweis dazu.
      Die Zahlen von Vampire sind weit hinter meinen Erwartungen.
      (Bin aber durch Old Pirate verwöhnt.)
      Was in größeren Tiefen wartet ist schwer abzuschätzen, speziell bei Old Pirate. Bisher wird nur an der Oberfläche gekratzt.
      Es gab mal vom Northern Territory Government ein Report (von 2009)über die Geologie der Gold Deposit.
      Diesem Report entstammen die beiden nachfolgenden Abbildungen:

      Calli ist zwar ein Stück weit weg, jedoch sieht die Groundrush underground von Metals X ähnlich aus.

      Wer sich in die Materie begeben möchte, der folge dem Link:
      http://www.nt.gov.au/d/Minerals_Energy/Geoscience/Content/Fi…
      Neben dem aktuellen Geplänkel um die Produktion, ist und bleibt für mich die spannendste Frage
      „Was ist in der Tiefe?“.
      Avatar
      schrieb am 27.09.15 20:17:54
      Beitrag Nr. 47 ()
      Am 21.09. wurde auf ASX ein update gebracht.
      Hatte mir ein paar Tage offline gegönnt, nun hier der Link:
      http://www.asx.com.au/asxpdf/20150921/pdf/431g71rj0x91wn.pdf
      .
      Avatar
      schrieb am 30.09.15 16:28:45
      Beitrag Nr. 48 ()
      © The Financial Times Ltd 2015
      Die FT bietet einen Report über ABM an, muss allerdings bezahlt werden.
      12 Seiten, Stand vom 26.09.15

      So ein kostenpflichtiger Report wird ja nicht mit aus der Luft gegriffenen Daten gefüllt (hofft man).
      So kann sich jeder seine Gedanken über das Kursziel sowie die geplante Dividende machen.
      Der Link dazu:
      http://markets.ft.com/research/Markets/Tearsheets/Forecasts?…
      Avatar
      schrieb am 06.10.15 09:45:21
      Beitrag Nr. 49 ()
      Announcing the Bumblebee Gold – Copper – Silver – Lead – Zinc – Cobalt Discovery
      Heute auf ASX gemeldet:


      der Link dazu:
      http://www.asx.com.au/asxpdf/20151006/pdf/431vvycn9x1rwz.pdf
      Avatar
      schrieb am 06.10.15 12:50:59
      Beitrag Nr. 50 ()
      kurze Wortmeldung von Darren Holden vom letzten Freitag
      http://www.abc.net.au/news/2015-10-02/central-australian-gol…
      Avatar
      schrieb am 07.10.15 12:08:36
      Beitrag Nr. 51 ()
      Bumblebee - Lake Mackay
      Das JV mit IGO für das Lake Mackay Projekt könnte sich als Glücksfall erweisen.
      IGO hat die Erfahrung, die nötigen Geologen, die Technik und positiven Cash-Flow in der Bilanz.
      Bumblebee wird im geologischen Aufbau mit Cloncurry verglichen.
      Die Mineralisierung auf Bumblebee wurde in einer geringen gefunden.
      Das Potenzial für die Entdeckung von hochgradigen Anschlussadern in der Tiefe besteht allemal.
      Ausdehnung, Beschaffenheit sowie der Aufbau der Mineralisierung, es bleibt viel zu klären.
      IGO kann aber alles notwendige direkt umsetzen.
      Das Sie direkt mit Metals X eine Vereinbarung für das angrenzende Gelände geschlossen haben, spricht für sich.
      "ABM and IGO have also entered into an earn-in and joint venture agreement with Metals X Ltd for the adjoining tenement application immediately north of EL24915. This tenement application (EL29748) is held by Castile Resources Pty Ltd - a wholly owned subsidiary of Metals X Ltd (ASX:MLX.
      Avatar
      schrieb am 08.10.15 10:35:13
      Beitrag Nr. 52 ()
      Bumblebee
      In der Meldung zu Bumblebee wurde erwähnt, das die Werte parallelen mit einer IOCG Lagerstätte aufweisen.
      Kleiner Auszug aus Wikipedia:"IOCG (Iron-Oxide-Copper-Gold)-Typ

      Diese Lagerstätten kommen in felsischen Magmatiten wie Graniten und Rhyoliten vor. Es handelt sich dabei um große hydrothermale Brekzienkörper mit hohen Gehalten an Eisen in Form von Hämatit und/oder Magnetit. Diese Lagerstätten entstanden vermutlich unter einem Vulkankomplex. Bei einem Ausbruch führten hydrothermale Fluide zur Bildung von Brekzien aus Magmatiten und setzten Eisenoxide, Kupfersulfide, gediegenes Gold sowie weitere Minerale ab. Die bedeutendsten Lagerstätten dieses Typs befinden sich in mesoproterozoischen Gesteinen Australiens wie zum Beispiel Earnest Henry (Queensland), Prominent Hill und Olympic Dam (beide im Bundesstaat South Australia)."
      .
      Bumblebee und Du Far (Rock Sample 1,6%Ni - 1,6%Co - 38,5%Mn) liegen zwar auf dem gleichen Prospekt aber immerhin ca. 27km von einander entfernt.
      Die Minen um Cloncurry verteilen sich auf eine Fläche mit ähnlicher Ausdehnung eng wie Streusel auf einem Kuchen.
      Avatar
      schrieb am 09.10.15 09:39:10
      Beitrag Nr. 53 ()
      Darren Holden in der Herold Sun
      Schön das sich DH inzwischen etwas Zeit für die Medien nimmt.
      Ein neuer Artikel ist unter dem Link zu finden:
      http://www.heraldsun.com.au/news/central-australia-most-unex…
      Meine Lieblingsstelle “If the deposit is commercial, and if it’s on the smaller side, we’re probably looking at production being four years away, if it’s bigger, then it’ll be more like ten years away,” he said.
      If they’re(IGO) impressed with the results, then we’re impressed with the results,” he said."

      Die Frage, ob es eine abbaubarer Erzkörper ist, scheint sich nicht mehr zu stellen.
      Im allgemeinen wird gesagt "dass ein Treffer noch keine Lagerstätte macht, welche den Abbau rechtfertigt".
      Avatar
      schrieb am 10.10.15 10:22:43
      Beitrag Nr. 54 ()
      Lake Mackay JV mit IGO
      Ein paar Zahlen und Fakten zu IGO.
      So wird es leichter verständlich, warum ich IGO als Glücksfall für ABU halte.
      Erfahrungen aus Exlporation und Produktion verschiedener Metalle.

      Das ganze Spektrum, welches für erfolgreichen Bergbau in Australien nötig ist,hat ABU für verschiedene Metalle durch.
      (Regionale geologische Besonderheite, Behörden, Klima, isolierte Position, Infrastruktur, indige Bevölkerung, ...)
      Sie sind den ganzen Weg schon mehrmals(erfolgreich) gegangen, für mich ein unschätzbarer Wert.

      Dieses Bild sowie das Nachfolgende hoffe ich in nicht all zu weiter Zukunft
      auch für ABU selbst einstellen zu können.

      Die Bilder sind der September Präsentation von IGO entnommen.
      http://www.igo.com.au/IRM/Company/ShowPage.aspx/PDFs/4171-10…
      Avatar
      schrieb am 14.10.15 12:06:36
      Beitrag Nr. 55 ()
      Exploration im NT
      Vom NT Government gab es mal einen Bericht über die Explorationstätikeit im Jahr 2014.
      http://www.core.nt.gov.au/Content/File/InvestmentAlert/Miner…


      Es konzentriert es sich um Tennant Creek und nördlich von Katherine.
      Das Central Desert hat eine vergleichbarer geologischen Struktur wie die bisherigen Hotspots im NT.
      Ich hoffe sehr, dass ABU einen Großteil seines künftigen Cashflow in die Exploration investiert.
      North Arunta, Lake Mackay, Warumpi Margin, alles großflächige Liegenschaften
      auf vielversprechendem unerforschtem Boden.
      Avatar
      schrieb am 19.10.15 17:29:09
      Beitrag Nr. 56 ()
      ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU
      19.the October, 2015
      Key Management and Board Changes
      ABM Resources NL (“ABM” or “the Company”) is pleased to announce a strengthening of its executive
      management team to reflect the Company’s transition to a gold producer, whilst ensuring it maintains
      a critical focus on further Mineral Resource discoveries and other growth opportunities.
      In light of this, Mr Brett Lambert has been appointed as interim Chief Executive Officer of ABM whilst the Company undertakes a formal recruitment process for the position of Managing Director.
      Meanwhile, Mr Darren Holden has stepped down as Managing Director of the Company, but will continue to be a key member of the executive management team in the position of General Manager Geology and Business Development.
      The management changes became effective at the close of business on 16th of October, 2015.
      Mike Etheridge, Chairman of ABM, said “In consultation and with the full support and agreement of our colleague, Darren Holden, the board of directors has now materially strengthened the executive management team at ABM. Brett Lambert is a highly experienced and regarded mining executive and we welcome him to fulfil the interim role at ABM.
      I also take this opportunity to sincerely thank Darren for what has been a stellar 6 years at the helm of
      ABM, and I look forward to continuing to work with him in a new capacity where his expertise in leading
      discoveries and identifying new ventures can be fully utilised.”
      Brett Lambert is a professional mining engineer and highly experienced company executive and corporate leader with over 30 years involvement in both the Australian and international mining industries. Brett’s previous experience encompasses mining operations, project development, exploration and corporate management. Mr Lambert has been engaged by ABM on a contract basis for a term of four months.
      Avatar
      schrieb am 19.10.15 19:01:09
      Beitrag Nr. 57 ()
      Die Mitteilung heute zeigt wieder recht deutlich, warum die MC von ABU nicht höher ist.
      Das Management hat den eigenen Umwandlungsprozess wohl etwas unterschätzt.
      ABU ist eben nicht der kleine Explorer, der nur seine Mühle aufbauen muss.
      Exploration und Produktion sind zwei paar Schuhe.
      Strategische Planung und Umsetzung ist bei Masse an potenzielle Projekten von ABU nochmal ein extra Betätigungsfeld.
      Etwas das Darren mit Bedacht umgesetzt hat, der Ausbau der Landpositionen sowie das JV mit IGO sowie die Vereinbarung mit der Coyote Mühle z.B.
      Er ist ein sehr guter Explorer und sollte eher beim operativen Geschäft bleiben.
      ABU´s Basisentdeckungen gehen auf seine Arbeit zurück.
      *
      Die Managementstruktur muss den Gegebenheiten(dem eigenen Wachstum) angepasst werden.
      Diese Erkenntnis hätte etwas früher nicht geschadet, aber besser spät als nie.
      Mr. Lambert hat nur für 4 Monate einen Vertrag.
      Sie scheinen sich der Anforderungen für diesen Posten nun bewusst zu sein und nehmen sich die Zeit um die geeignete Person zu finden.
      Das dieser notwendige Wechsel so schlecht vermittelt wird, ist eine Schwäche von ABU(welche hoffentlich vorübergehender Natur ist).
      *
      Für mich ist aktuell ABU weit hinter seinen Möglichkeiten zurück.
      Die schiere Masse an Arbeit die bei ABU ansteht, erfordert einen klaren getrennten
      Aufbau der einzelnen Segmente.
      Die Explorationsprojekte können auf Jahre mehrere Geologenteams beschäftigen.
      Der Abbau einer Venenlagerstätte wie OP und die Verarbeitung dieses Materials ist halt sehr speziell.
      Die Testanlage könnten Sie bei Buccaneer oder bei Hyperion einsetzen.
      Bei Tanami haben Sie die Option Ländereien um Coyote zu erwerben.
      Damit hätten Sie reichlich Material für den vollen Mühlenbetrieb und eine Option für die Regenzeit.
      Es ist zu viel um mit dem bisherigen Stückwerk weiter zu machen.
      Das nicht alles ohne Reibung glatt läuft war zu erwarten.
      Nur ein Takeover wäre ein echter Rückschlag für mich.
      Avatar
      schrieb am 20.10.15 17:53:15
      Beitrag Nr. 58 ()
      Der Bericht für das September Quartal sollte in den kommenden Tagen erscheinen.
      Das Zahlenwerk der Goldproduktion wird nur begrenzt für eine langsfristige Einschätzung taugen, damit muss wohl auf das Dezember Quartal gewartet werden.
      - Für die Abstimmung der Mühle wurde Material mit unterschiedlicher Qualität verarbeitet
      - der Nuggeteffekt (dieser wird als variable Position bestehen bleiben)
      - beim Anlauf der Mühle bleibt viel Gold hängen (bis diese gefüttert ist)
      Tanami hatte für die Coyote Mühle 1500 bis 2000 Oz angegeben.
      Vergleichbare Mühlen haben wohl schon bis 4000 Oz zwischen gelagert.
      Hoffe nur, das der Cashflow es ABU endlich erlaubt in die Vollen zu gehen.
      *
      Eine von vielen Optionen: das North Arunta Projekt

      Davon mal nur Kroda in Angriff genommen.
      Es erstreckt sich über ca. 14km.

      Hole KRRC100013 returned:
      57 metres averaging 3.83g/t gold (0.2g/t cut-off) from 10 metres including:
      29 metres averaging 6.38gt gold (0.5g/t cut-off) or
      12 metres averaging 15.69g/t gold (1.0g/t cut-off).
      - Hole KRRC100014 returned:
      10 metres averaging 4.97g/t gold (0.2g/t cut-off) from 5 metres including:
      6 metres averaging 8.09g/t gold (0.5g/t cut-off).
      91 metres averaging 1.44g/t gold (0.2g/t cut-off) including:
      33 metres averaging 3.22g/t gold (0.5g/t cut-off) or
      24 metres averaging 4.28g/t gold (1.0g/t cut-off).
      - Hole KRRC100015 ended in mineralisation with:
      28 metres averaging 2.34g/t gold (0.5g/t cut-off) from 19 metres including:
      12 metres averaging 4.76g/t gold (1.0g/t cut-off).
      - Hole KRRC100004 returned:
      20 metres averaging 2.2g/t gold (0.5g/t cut-off) from 35 metres including:
      3 metres averaging 11.83g/t gold (1.0g/t cut-off).
      Das an einem Projekt mit diesen Werten seit Jahren nichts passiert schmerzt.

      Durch die Versorgungssicherheit ein relativ idealer Standort für die Nutzung der Pilot Anlage. Der Aufbau der nötigen Infrastruktur ist allemal machbar und für diese Region geradezu optimal.
      (The Kroda Gold Project is located 18 kilometres west of the Stuart Highway, 30 kilometres north from the town of Barrow Creek and 200 kilometres south of Tennant Creek. The Project is well serviced with infrastructure and is located on pastoral land close to the Stuart Highway, the Ghan Rail Line and the Northern Territory Gas Pipeline.)
      Avatar
      schrieb am 21.10.15 09:33:48
      Beitrag Nr. 59 ()
      Heute erschienen, der Quartalsreport bis zum 30.09.15.
      http://clients3.weblink.com.au/wcnewstemp/01674353.pdf
      Avatar
      schrieb am 21.10.15 12:21:35
      Beitrag Nr. 60 ()
      Der Bericht hat das alte Bild, das im Aufbau und Inhalt ABU noch viel Spielraum hat, sich auch in diesem Bereich zu steigern. Der Wechsel beim Management zeigt, dass Ihnen das auch aufgefallen ist oder die Großaktionäre deutlich darauf hingewiesen haben.
      *
      Im Laufe der Jahre habe ich mehrmals den Übergang vom Explorer zum Produzenten mit verfolgen können. Meist haben Verzögerungen im Genehmigungsverfahren und beim in Gang setzen(oder Neuaufbau) der Mühle jegliche Zeit- und Kostenplanung über den Haufen geworfen.
      Da Coyote recht lange still lag und das zu verarbeitende Material doch deutlich vom üblichen abweicht, habe ich mit Anlaufschwierigkeiten gerechnet.
      Der für mich ausschlaggebende Unterschied zwischen ABU und anderen Unternehmen sind die hohen Goldgehalte bei Old Pirate.
      Wo Unternehmen mit 2-4 g/t bei Problemen in existenzielle Schwierigkeiten geraten, hat ABU noch reichlich Puffer und kann immer noch positiven Cashflow generieren.
      *
      Überraschungen birgt der Bericht nicht.
      Ab 01.10.15 läuft die kommerzielle Produktion.
      Sie können den Golddurchlauf immer noch nicht sicher einschätzen.
      Realistisch betrachtet, wird erst das laufende Quartal belastbare Zahlen bringen.
      (Warum – wieso, Inbetriebnahmekosten , Leasinggebühr, keine Verdünnung, gesättigte Mühle, …sorry, hatten wir schon alles.)
      Bei konstant hochgradigem Material sollten 11 g/t möglich sein.
      Während jeder andere Produzent über 7,6 g/t bei seinen Aktionären eine gewisse Begeisterung erzeugen würde, bleibt bei ABU alles wie gehabt.
      *
      Wie in der Vergangenheit bleibt ABU die Vision schuldig.
      Jeder muss sich aus den Aktivitäten (Produktion, Exploration, JV, Ausweitung der Explorationslizenzen, …) sein Bild von ABU´s Zukunft bauen.
      *
      North Arunta Project ABM continues to discuss the divestment of the North Arunta project with several parties.
      (NST oder MLX, nur eine Vermutung)
      Avatar
      schrieb am 21.10.15 17:17:33
      Beitrag Nr. 61 ()
      Nur ein Gedankenspiel über das North Arunta Projekt und ja, ich weiss wir sind hier nicht bei wünsch dir was.
      -1. weitere Bohrungen bei Kroda 3 um im Idealfall eine JORC konforme Resource
      zu haben
      -2. ein Tochterunternehmen gründen und das North Arunta Projekt ausgliedern
      -3. Startkapital und die Pilot Anlage als Mitgift und die JORC als Orientierungspunkt für den Markt
      Im derzeitigen Umfeld in 12 - 18 Monaten eine umsetzbare Option.
      Natürlich unterstellend, das OP ab jetzt positiven Cashflow generiert.
      Ein weiteres JV mit 30% benötigt ja in der ersten Stufe meist 24 oder 36 Monate für die Exploration bis zählbares herauskommt.
      Ganz habe ich die Hoffnung noch nicht aufgegeben.
      Möglich das die zukünftige neue Speerspitze bei ABU positiv überrascht.
      Avatar
      schrieb am 22.10.15 11:09:27
      Beitrag Nr. 62 ()
      Gestern Abend wurde noch die Bekanntmachung zur jährlichen Hauptversammlung auf ASX gemeldet.
      http://www.asx.com.au/asxpdf/20151021/pdf/4328bkhfvyjbjt.pdf
      *
      Bei den Aussis herrscht einige Verwirrung über die gemeldeten Zahlen.
      Für den Fall das es hier einigen ähnlich geht, stelle ich mal einen Beitrag rein welcher auf hotcopper gepostet wurde. Der Beitrag ist von „SALTIGA62“ erstellt worden, seiner Aussage nach langjährig im australischen Bergbau tätigt und mit seinem wiederholt gezeigtem Fachwissen für mich auch glaubhaft. Sorry - etwas lang.
      „The 1,730 oz your referring to was in the carbon-in-pulp CIP circuit, since recovered, it has nothing @ all to do with the gold locked up in the coyote process plant usually referred to as gold locked up in the process plants circuit.
      51,000 t mined from commencement of commissioning until 30th September.
      @ average of 10.8gp/t head grade-diluted with low grade commissioning ore.
      Gold being extracted from gravity circuit-usually gets > 80% of gold out.
      & carbon-in-pulp C.I.P- circuit usually-gets >99% of gold out.
      The total combine gold recovery from both gold recovery circuits in the coyote processing plant is confirmed @ 99%.
      Up until the end of September 41,000t of material was processed through the Coyote Processing Plant- A total of 8,281 oz of gold recovered & poured thus far from both circuits.
      (1,730 oz was awaiting stripping,recovery & pouring from carbon-in-pulp C.I.P-circuit' after end of quarter); ref to bottom of page two in report.
      The stated 1,730 oz of gold from the carbon-n-pulp strip circuit was recovered just after the end of the quarter & most of it appears in financials, it still came from the 41,000t processed up until the end of the quarter thus being relevant & mentioned in report.
      41,000t of material & 10,011 oz- combined gravity & C.I.P gold,
      recovered totals =311,342grams =7.6 grams p/t total gold recovered from both gravity & Carbon-in-pulp circuits.
      The differential from the 41,000t head grade /plants feed grade of 10.8g p/t, & the recovered gold 7.6g p/t-(recovered from both the gravity& C.I.P circuits) is 3.2grams of gold per t, this gold is retained inside of plant saturating residual gold in gravity traps.
      3.2g p/t x the 41,000t processed is 131,000grams divided by 31.1=4,218oz of gold that is defined as the gold locked in circuit- right through out plant primarily in gravity recovery side mill liners ,sumps etc. GOLD locked up in coyote process plant is approx. 4,218 oz.
      Hope I have been able to explain this well enough as many seem to be confused by what i have read in there response's to the quarterly report in these threads.
      Now understanding the potential increase in gold recovery upside once coyote's process plants saturation cycles are completed, i believe it now would be.
      For consideration
      tails grades <0.05g/t gold,
      The processing plant metallurgical recoveries have been excellent with gravity recoveries >80% and excellent leach kinetics in the CIP circuit for an overall processing plant recovery of >99%.
      As outlined in the Operational Update released on 21 September 2015, mine estimated head grade has exceeded the mill head grade mine-call grade of 10.9g/t gold (including low-grade material used for commissioning).
      So seriously, As every thing has been independent verified, & we know the numbers achieved in the trial mining process, the saturation of coyote's internal gravity gold traps is normal , & as it has soaked up approx. 4,200 oz,of gold it would be now done with, unless there is a design fault, but as plant was only refurbished & has been independently assessed & verified we will rule this out.
      Therefore I have done some more calculations, on what we know & based them on the coyote plant being saturated, as the only lost gold is tailings feed that is less than <0.05gram per t of gold.
      This quarter OCT-31Day's/Nov- 30 Day's/Dec- 31 Day's 2wks on & 1wk
      (off basis only ) = 92 day's x 66.6%=60 day's production average x 650t per day .
      =39,ooot x recovered head grade 10.895g p/t after tailing's loss & is ultra conservative.
      Noted; average head grade was considerably diluted with commissioning ore, & obtained without being able to access all high grade zones during two thirds of commissioning process, & still achieved 10.9 g p/t.
      Therefore I will use only an extra 1.1g p/t for max analysis-conservative!
      & use 10,11 & 12 g p/t recovered.
      39,ooot of production for forthcoming quarter, times recovered grade p/t in tables below.
      10 g p/t-39o,000gr=12,540 oz x pog@ $1,600.00 =$20,064,000.00 au
      11 g p/t=429,000gr =13,794oz x pog @ $1,600.00=$22,070,00o.oo au
      12 g p/t =468,000gr=15,048oz x pog @$1,600.00=$24,076,800.00au
      Spec; subtract costs, I'll let you complete, obviously there is also further upside when you factor in increasing production. Quite bewildering @ the moment looking @ the s/p.
      imo-salt"
      Avatar
      schrieb am 06.11.15 17:13:05
      Beitrag Nr. 63 ()
      Anmerkungen zur Bumblebee Entdeckung
      IGO hat eine neue Präsentation, jedoch leider keine neuen Hinweise über Bumblebee.
      Sie haben für Ihre verschiedenen Explorationsprojekte 10-12 Mio.A$ bereitgestellt.
      Damit sind die Arbeiten auf Du Faur abgesichert.
      In der JV Vereinbarung zwischen ABU und IGO wurde der November 2015 für die Phase 2 (Earn-In-Phase) angegeben.
      Näheres dazu sollte in kürze veröffentlich werden(laut letzter Meldung über Bumblebee).

      3D Seismic aus der IGO Präsentation
      Nach bisherigem Kenntnisstand zeigt Bumblebee Strukturen einer IOCG Lagerstätte.
      Supergene Anreicherungen bilden sich oberhalb des Grundwasserspiegels. Die oberflächennahen Erzlagerstätten entstehen durch absteigende Oberflächenwässer. Wirtschaftlich bedeutende Metalle, wie Cu, Ag etc., werden freigesetzt, umgelagert, mobilisiert (Laugung und Transport) und in der Tiefe an primärem Erz unter Erhöhung des Metallgehaltes abgeschieden.
      Durch einsickerndes sauerstoffhaltiges Regenwasser bilden sich durch die chemische Verwitterung oberflächennahe Oxidationszonen. Enthalten sie Eisenoxide, so werden sie bergmännisch als „Eiserner Hut“ ( engl.: gossa ) bezeichnet.

      Anreicherungslagerstätte im Vergleich mit Bumblebee

      Der wichtigste Aspekt supergener Lagerstätten ist, dass deren Primärerze angereichert sind und einen höheren Metallgehalt als ebendiese ursprünglichen Primärerze haben. Supergene Mineralisation stellt eine Anreicherung von oben nach unten dar. Die hypogenen Erzmineralien (z.B. Chalcopyrit mit 30% Cu) werden an der Oberfläche (Oxidationszone) gelaugt und in größerer Tiefe bei reduzierendem Milieu in Form von Erzmineralien mit höherem Cu-gehalt abgeschieden (z.B. Chalkosin mit 80% Cu). Der supergene Anreicherungsprozess kann im Laufe größerer Zeiträume zu reichen Erzkörpern führen.
      Der Abbau erfolgt in der Regel im Tagebau, der weit wirtschaftlicher als der Untertagebau ist.
      *
      Die Lagerstätten um Cloncurry haben meist Eisenoxid-Cu-Au, andere in Queensland nur Cu-Au.
      (Bumblebee: Au-Ag-Cu-Pb-Zn-Co)
      Diese beginnen auch erst in Tiefen ab 300m, sind also nur begrenzt als Orientierung geeignet. Ich habe bisher im NT wie in QLD keine IOCG Lagerstätte gefunden, die zum direkten Vergleich nützlich wäre.
      *
      Spätestens bei der Hauptversammlung sollte über die nächsten Schritte des Projektes neues zu erfahren sein.
      Avatar
      schrieb am 18.11.15 10:28:50
      Beitrag Nr. 64 ()
      Trading Halt
      ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 18 November 2015 Australian Stock Exchange Limited Company Announcements Exchange Plaza Level 8 2 The Esplanade PERTH WA 6000 Dear Sir/Madam TRADING HALT ABM Resources NL (ASX: ABU) requests that the ASX apply a trading halt to its shares effective immediately, pending an announcement from the company regarding an update to the market on the Old Pirate operations. The trading halt should be lifted at the time the announcement is made, which will be most likely the commencement of normal trading on Friday 20 November 2015. The Company is not aware of any reason as to why the ASX should not grant the trading halt. Yours sincerely Jutta Zimmermann Company Secretary
      Avatar
      schrieb am 20.11.15 14:49:27
      Beitrag Nr. 65 ()
      ASX ANNOUNCEMENT vom 20.11.15
      http://www.asx.com.au/asxpdf/20151120/pdf/4334p2t72rq4p3.pdf
      Die Reaktion :

      Bei diesem hohen prozentualen Abschlag ist das Volumen erstaunlich gering!
      Avatar
      schrieb am 20.11.15 16:23:14
      Beitrag Nr. 66 ()
      Die heutige Mitteilung von ABM bestätigt, das der Abbau von Venenlagerstätten
      fast immer holprig ist. Habe mit größeren Schwierigkeiten gerechnet.
      Die Mühle bringt 7 g/t und nicht wie zuletzt erwartet 10 g/t.
      Sie schreiben, dass sich die Grade im November kontinuierlich verbessern.
      7 g/t sind ja nicht das Ende der Welt aber doch eine erhebliche Abweichung.
      Ob das fehlende Gold nicht gewonnen werden konnte oder einfach nicht existiert muss sich jetzt zeigen.
      Bei der Mühle lassen Sie den Crusher checken „The secondary crusher has now been returned to service.“.
      Sollten die Ursache das Erz sein, so ist es genau der Grund warum man für diese Venen Lagerstätten keine JORC erstellen kann. Die produzierten Werte können sehr schwanken und bringen entsprechende Reaktionen am Aktienkurs up/down. Zum Beispiel hat die NICOLSONS Goldmine von Bulletin beim Abbau der Venen unerwartete Schwankungen in der Nordzone von 12,1 g/t bis 239 g/t.
      Hätte ABU direkt vor Ort mit der kleineren Schwerkraft-Mühle produziert, wären die aktuellen Probleme bereits seit Monaten geklärt.
      *
      Mit der aktuellen Gradzahl bleibt ein positiver Cashflow.
      Der prognostizierte Grad muss nur mit dem produzierten in Einklang gebracht werden.
      Allerdings ist eine Anpassung beim Minenplan nötig um klare Verhältnisse zu schaffen.
      Die Exploration aussetzen bis Sie einen kontinuierlichen Barbestand haben um zukünftige
      CR ausschließen zu können. Das dem Markt vermittelt, könnte der Kurs auch Halt finden.
      *
      Sollte z.B NST mit dem Gedanken spielen ABU zu übernehmen, haben Sie die Schwierigkeit es Ihren Aktionären zu vermitteln, da ABU nur eine geringe JORC hat.
      Mit der sinkenden MC von ABU erhöht sich Schritt für Schritt das Risiko.
      *
      Bei allem was noch so schief gehen kann, konnte ich beim heutigen Kurs nicht wiederstehen.
      Sie müssen ja das Rad nicht neu erfinden um in die Spur zu kommen.
      Der wilde Teil bei diesem Ritt ist hoffentlich bald vorbei. Time will tell.
      Mal abwarten was die Hauptversammlung bringt.
      Avatar
      schrieb am 25.11.15 21:03:52
      Beitrag Nr. 67 ()
      Die nachfolgenden Punkte, sind eine Auslese sachlicher Beiträge zur Hauptversammlung, die auf hotcopper gepostet wurden.
      * lt. Mike Ethridge wird mit Gewinn produziert, die genaue Marge kann oder will er nicht sagen.
      * Schwankungen bei den Graden wie beim Goldpreis lassen für kurze Intervalle keine genaue Aussage zu.
      * Durch den 2 Wo produzieren - 1 Wo Ruhe Rhythmus der Mühle sind die Produktionstage einzelner Monate verzerrt, daher wollen Sie lieber Quartalsweise berichten.
      * Mining läuft 12h pro Tag / Verarbeitung 24h pro Tag für 2 Wochen / die Mühle ist zu 60% ausgelastet.
      * Für die Diskrepanz zwischen Produktionsgrad 7-8 g/t und den 13g/t aus den Proben (wurden extern geprüft,getestet und bestätigt)sowie dem Testbetrieb mit 13g/t haben Sie immer noch keine Antwort.
      * der alte Plan OP auf Jahr für Jahr Basis der Geologie folgend zu betreiben soll beibehalten werden.
      * auf OP wurde mehr gebohrt als für eine JORC notwendig ist. Die Ergebnisse werden aber nicht JORC genannt da die Grade zu variabel sind.
      * um eine CR zu umgehen soll nur das hochwertigste Material aus den 4 Gruben entnommen werden.
      * das unrentable Material an den schmalen Adern soll besser identifiziert werden um die unnötige Verdünnung zu reduzieren.
      * der neue CEO Brett läst wohl einen Hauch frischer Luft erkennen, die Skepsis Ihm gegenüber ist nach persönlichen Gesprächen mit Ihm gewichen. Kein beschönigen der Situation und viele neue Ansätze. Welchen Spielraum die Hauptaktionäre Ihm zugestehen wird sich zeigen.
      * um zeitnahen Mehrwert zu schaffen ist das Thema JV auf der Liste ganz oben dabei. Einen der angrenzenden großen Produzenten in der Zentral Tanami Region zu gewinnen ist eine Option, Exploration/Produktion bei Buccaneer oder Hyperion.
      ****
      Auf HC schießen nun alle möglichen Varianten durch den Raum, eine kleine Auswahl:
      * mit dem besten Material von OP die Mühle zwei Jahre betreiben. Kostet nur eine weitere Leasingrate von 2 Mio. und die Produktion ist für 20 Monate gesichert. Dann als JV (mit TAM) die Mühle weiter betreiben und mit Erz aus dem direkten Umfeld von Coyote und OP füttern.
      * die Mühle Richtung Buccaneer verlagern und dort mit gemischtem Erz von Buccaneer und OP produzieren, ca. 4g/t
      * Umbau der Trail Plant bei OP zur Haufenlaugung
      * NST beginnt in ca. 1 Jahr seinen Bergbau in der Zentral Tanami, mehrere Optionen möglich
      ****
      Bei der MC von ABU derzeit, können sich einige Produzenten ABU aus dem Cashbestand leisten.
      Wie wird Pacific Road Capital Mgt. auf die aktuelle Situation reagieren?
      Sie nennen sich selbst einen aktiven Anteilseigner. Da Ihre Position inzwischen Land unter ist, kann aus dieser Richtung auch noch das ein oder andere erwartet werden.
      *
      Avatar
      schrieb am 07.12.15 09:54:59
      Beitrag Nr. 68 ()
      Auf ASX Mitteilung über die neuen Rahmenbedingungen über das JV mit IGO.
      Fokus für 2016 auf die Entdeckung bei Bumblebee mit weiteren 6 Mio. A$ für Exploration.
      [urlhttp://www.asx.com.au/asxpdf/20151207/pdf/433m0jjv338lh2.pdf][/url]
      Avatar
      schrieb am 21.12.15 09:22:46
      Beitrag Nr. 69 ()
      Heute wurde die neue Planung für Old Pirate gemeldet.
      http://www.abnnewswire.net/press/en/81887/ABM_Resources_NL_%…
      Avatar
      schrieb am 21.12.15 20:47:54
      Beitrag Nr. 70 ()
      Explorer - Produzent und zurück zum Explorer.
      Auf Old Pirate bezogen, lässt sich das was vom Management in den letzten Jahren zum Thema Produktion abgeliefert wurde mit arglistiger Täuschung gut umschreiben.
      Als Kleinanleger hat man nicht die Möglichkeit eine Firma in allen Details zu durchleuchten.
      Einem Großaktionär der 20 Mio/$ investiert, unterstelle ich mal, prüft doch mit kundigem Personal vor Ort sein Zielobjekt (Zahlenwerk, Führungsetage, Strategie, einfach alles was greifbar ist).
      Die heutige Meldung scheint mal nichts zu beschönigen.
      Das stoppen der Produktion ist nur konsequent wenn es keinen positiven Cash-Flow gibt.
      Bei Buccaneer eine Mühle (Haufenlaugung) zu errichten ist die Option, um langfristig eine Perspektive zu haben.
      Mischen Sie das Material von OP dazu, erhalten Sie auch das Gold was drinsteckt, ohne das wieder bei der Mühle hinten mehr Gold rausfällt als gewonnen wird.
      Das Übel ist, ca. zwei Jahre bis eine Mühle steht und die Papiere durch sind.
      Bedeutet, Geld muss beschafft werden, CR oder einer der potenten Hauptaktionäre.
      (Wüste nur zu gern, was die Großaktionäre und Brett planen.)
      Das Ergebnis ist das Gleiche, die Anzahl der Aktien wird enorm steigen.
      Es heißt, Sie suchen nach Partnern um weitere JV für die Exploration der Liegenschaften zu finden.
      Warum sollte z.B. NST ein paar Mio. in eine JV Vereinbarung einbringen, wenn Sie für wenig mehr die ganze Firma bekommen können?
      Eine kalkulierbare Basis wird bei ABU auf absehbare Zeit leider wunschdenken bleiben.
      Bei der Exploration ist das JV mit IGO der einzige Lichtblick im Moment.
      Avatar
      schrieb am 18.01.16 11:51:06
      Beitrag Nr. 71 ()
      Heute wurden die Zahlen für den Dezember auf ASX gemeldet:
      http://www.asx.com.au/asxpdf/20160118/pdf/434fdfjfwh8bcw.pdf
      Avatar
      schrieb am 28.01.16 09:59:47
      Beitrag Nr. 72 ()
      Heute wurde von IGO der Dezember Quartalsbericht gebracht, darin eine Info zum JV:
      "During the quarter, the Company undertook detailed follow-up surface sampling across seven prospect areas including Bumblebee to provide better anomaly definition. This work has extended the anomalous footprint at Bumblebee, both to the west and east.
      Tenement wide geological mapping of EL24915 and a petrographic and lithogeochemical study of
      rocks from outcrop and drilling were also completed during the quarter. This work will assist in
      characterising mineralisation style and the development of follow-up drill targets at Bumblebee.
      Drill follow-up is scheduled to commence in the June 2016 quarter. "
      http://www.asx.com.au/asxpdf/20160128/pdf/434m737fs2rdx5.pdf
      Avatar
      schrieb am 29.01.16 10:40:03
      Beitrag Nr. 73 ()
      Heute folgt nun ABU mit dem Bericht für das Dezember Quartal.
      http://www.asx.com.au/asxpdf/20160129/pdf/434qctypmscqqd.pdf
      Avatar
      schrieb am 12.02.16 20:21:03
      Beitrag Nr. 74 ()
      Hallo Grenzwall,

      damit du nicht allein Unterhalter bist ---- habe ich mir heute sämtlich 42.493 angebotene Aktien gekauft.:laugh::laugh::laugh::laugh:

      Außerdem bin ich sehr Risiko freudig.

      Übrigens bin ich bei APAC auch allein Unterhalter.
      APAC besitzt 14,8% Aktienanteil an ABM.

      Schau ma mal;);):rolleyes:
      1 Antwort
      Avatar
      schrieb am 17.02.16 09:56:03
      Beitrag Nr. 75 ()
      Antwort auf Beitrag Nr.: 51.735.271 von hundadoption am 12.02.16 20:21:03
      Willkommen hundadoption
      Das mit dem Risiko ist hier auch nötig, leider nicht immer jedem bewusst.
      Macht für mich den Reiz aus, no risk no fun.
      *
      Heute kam auf ASX wieder eine Meldung, nichts über die langfristige Ausrichtung dabei.
      http://www.asx.com.au/asxpdf/20160217/pdf/43539pv027t5d8.pdf
      *
      Avatar
      schrieb am 18.02.16 10:15:33
      Beitrag Nr. 76 ()
      Heute auf ASX gemeldet:
      http://www.asx.com.au/asxpdf/20160218/pdf/4354jgfn64zrn7.pdf
      Dazu wurde eine Grafik auf hotcopper gepostet:
      7 Antworten
      Avatar
      schrieb am 18.02.16 11:31:42
      Beitrag Nr. 77 ()
      Antwort auf Beitrag Nr.: 51.775.078 von grenzwall am 18.02.16 10:15:33Hier gibt es natürlich ein sehr hohes Risiko.

      Dafür gibt es auch enorme Gewinnchancen.:D

      Ich bin in vielen Ms Chong Investitionen und bin damit bislang sehr gut gefahren.
      Es braucht oftmals sehr viel Geduld.:rolleyes:

      Mit COL habe ich 1999 angefangen. X- mal rein und raus und das meistens mit mehreren 100%.
      Zur Zeit bin ich bei COL draußen und warte bis COL wieder unten ist.

      Wichtig war bislang, unten rein und möglichst weit oben wieder raus. Auf Dauerhaftigkeit in oberen Regionen sollte man nicht hoffen.

      Obwohl sich COL zur Zeit recht lange im oberen Bereich hält.:)
      6 Antworten
      Avatar
      schrieb am 19.02.16 16:49:42
      Beitrag Nr. 78 ()
      Antwort auf Beitrag Nr.: 51.775.885 von hundadoption am 18.02.16 11:31:42Wie nimmt Ms Chong (ggf. über COL oder APAC) Einfluss?
      Hast Du diesbezüglich bestimmte Erwartungen in Bezug auf die Neuausrichtung von ABU.
      5 Antworten
      Avatar
      schrieb am 21.02.16 15:27:15
      Beitrag Nr. 79 ()
      Antwort auf Beitrag Nr.: 51.788.794 von grenzwall am 19.02.16 16:49:42Ms. Chong Sok Un is Executive Chairman of the Board of APAC Resources Ltd. Ms. Chong was appointed as an Executive Director of the Company on 6 July 2007 and has been re-designated as the Chairman of the Company since 20 October 2009. Ms. Chong holds various directorships in subsidiaries of the Company. Ms. Chong is currently an executive director and the chairman of COL Capital Limited (Stock Code: 383), a substantial shareholder of the Company and a company listed on the Main Board of the Hong Kong Stock Exchange. She has been the chairman of Long Island Golf & Country Club, Dongguan, the PRC since September 1998. Ms. Chong was awarded the Medal of Honour (MH) by the Government of the Hong Kong Special Administrative Region on 1 July 2011. She is a member of Dongguan Committee of the Chinese People’s Political Consultative Conference, the Honorary Director of the Chinese Red Cross Foundation, Permanent Honorary Chairman of the Hong Kong Federation of Fujian Associations and Vice Chairman of the Hong Kong Federation of Fujian Associations Ladies Committee. She is now the namer and director of YOT Chong Sok Un Medical Fund (cancer aid) and a member of Yan Oi Tong Advisory Board. Ms. Chong was the chairman of the 31st Term of the Board of Directors of Yan Oi Tong 2010-2011. From 25 June 2007 to 23 April 2009, she was a non-executive director of ChinaVision Media Group Limited (Stock Code : 1060), a company listed on the Main Board of the Hong Kong Stock Exchange.
      Avatar
      schrieb am 21.02.16 15:29:10
      Beitrag Nr. 80 ()
      Antwort auf Beitrag Nr.: 51.788.794 von grenzwall am 19.02.16 16:49:42Ms. Sok Un Chong

      Age : 61
      Public asset : 576,506,000 USD
      Avatar
      schrieb am 21.02.16 16:34:30
      Beitrag Nr. 81 ()
      Antwort auf Beitrag Nr.: 51.788.794 von grenzwall am 19.02.16 16:49:42Ich will damit sagen:

      Ms. Sok Un Chong ist zur Zeit das Familienoberhaupt einer der reichsten und einflussreichsten Familien Hongkongs.

      Da ist richtig Kohle dahinter.

      Die Frau ist nicht dumm.

      APAC besitzt wohl 14,8% von ABM.

      Das wird nicht einfach so in den Sand gesetzt.
      2 Antworten
      Avatar
      schrieb am 21.02.16 18:13:15
      Beitrag Nr. 82 ()
      Übrigens, morgen gibt es bei APAC ein Meeting.
      Vielleicht gibt es auch etwas neues zu ABM?
      Avatar
      schrieb am 21.02.16 20:06:00
      Beitrag Nr. 83 ()
      Antwort auf Beitrag Nr.: 51.799.408 von hundadoption am 21.02.16 16:34:30Das wird nicht einfach so in den Sand gesetzt.
      *
      Werden Sie eigene Leute im Board platzieren und Ihre Linie durchziehen?
      Nur Geld nachschießen wird wohl keiner mehr, nach der bisherigen Leistung von ABM.
      Ob die Kandidaten für ein TO warten bis ABM über die Wupper gegangen ist und Sie die Reste
      nur noch einsammeln müssen bezweifle ich - zumindest so diese Glauben ABM wird es alleine richten können.
      JV auf welcher Ebene auch immer ist halt meist nur die zweitbeste Lösung.
      Welchen Weg Sie auch wählen, für die Altaktionäre wird das Stück vom Kuchen erheblich kleiner.
      Nach einer Kapitalerhöhung eine eigene Mühle bei Buccaneer errichten und das Erz mit OP gemischt verarbeiten - dauert mindestens 2 Jahre aber für die realste Option.
      1 Antwort
      Avatar
      schrieb am 22.02.16 05:15:49
      Beitrag Nr. 84 ()
      Antwort auf Beitrag Nr.: 51.800.431 von grenzwall am 21.02.16 20:06:00Mich interessiert eher nur der Kurs.

      In AX am Freitag 14,xx %

      Und Aktuell 17,xx %

      Läuft an.

      APAC erhebt sich heute wohl auch.
      NEWS zum Meeting gibt es noch nicht.
      Avatar
      schrieb am 22.02.16 15:06:12
      Beitrag Nr. 85 ()
      3 Antworten
      Avatar
      schrieb am 22.02.16 15:16:21
      Beitrag Nr. 86 ()
      Antwort auf Beitrag Nr.: 51.805.732 von hundadoption am 22.02.16 15:06:12Dieser Auszug ist doch interessant!
      Cash und keine Schulden.

      ABM
      ABM Resources NL (‘‘ABM’’) is an Australian listed gold company with assets located in the Northern
      Territory. It has a large acreage footprint in the Tanami-Arunta region, and is currently producing from
      the Old Pirate project.
      In the December quarter, ABM held an operational review at the Old Pirate mine. The mine suffered
      from a discrepancy in grade between the mining inventory model and the areas mined to date, and
      higher mining dilution. The review resulted in a reduction in final pit depths, and mining at Old Pirate
      – 4 –
      is now scheduled to be complete by early April 2016, generating significantly less cash than originally
      forecast. Once mining is complete ABM is expected to return its focus on exploration in the Tanami
      Region.
      At the end of 31 December 2015, ABM had A$7.5 million cash and no debt.
      2 Antworten
      Avatar
      schrieb am 22.02.16 18:06:57
      Beitrag Nr. 87 ()
      Antwort auf Beitrag Nr.: 51.805.840 von hundadoption am 22.02.16 15:16:21
      return its focus on exploration
      Danke für die Info
      Habe es bei GOR durch, als der Abgesang am größten war (+- 5 Cent) schalteten Sie stur auf auf Exploration und nach dem Treffer konnten Sie bei bedeutend höheren Kursen eine CR durchführen.
      Avatar
      schrieb am 22.02.16 18:11:27
      Beitrag Nr. 88 ()
      Antwort auf Beitrag Nr.: 51.805.840 von hundadoption am 22.02.16 15:16:21
      return its focus on exploration
      Danke für die Info, habe es bei GOR durch, als der Abgesang am lautesten war (+-5 A/Cent) schalteten Sie stur auf Exploration. Nach dem Treffer konnten Sie bei deutlich höheren Kurse Geld aufnehmen.
      Avatar
      schrieb am 01.03.16 11:00:06
      Beitrag Nr. 89 ()
      Avatar
      schrieb am 01.03.16 11:12:19
      Beitrag Nr. 90 ()
      Die gleiche Bewegung wurde auch bei MLX gemeldet.

      MLX hat sein Interesse an der Tanami Region ja schon bekundet. Time will tell
      1 Antwort
      Avatar
      schrieb am 01.03.16 16:53:30
      Beitrag Nr. 91 ()
      Antwort auf Beitrag Nr.: 51.870.309 von grenzwall am 01.03.16 11:12:19Ms. Chong Sok Un ist als APAC Chairman zurück getreten.
      Mister Dew ist der Neue.
      Sehe ich als Vorteil, da Dew langjährige Erfahrung im Minensektor vorweisen kann.:)
      Avatar
      schrieb am 04.03.16 10:25:12
      Beitrag Nr. 92 ()
      die Finanzen für das letzte Halbjahr, heute auf ASX
      http://www.asx.com.au/asxpdf/20160304/pdf/435ls5qh1j9s4x.pdf
      Avatar
      schrieb am 09.03.16 12:34:51
      Beitrag Nr. 93 ()
      auf ASX warten heute gesammelte Werke
      Avatar
      schrieb am 10.03.16 12:11:38
      Beitrag Nr. 94 ()
      und weitere Lektüre gibt es heute auf ASX:

      *
      Die Anteilhalter aus Hong Kong scheinen das Zepter übernehmen zu wollen.
      Die Ausrichtung auf die Exploration ist gemachte Sache, finanziert über neue Shares.
      Der Idealfall sind weitere Entdeckungen um eine größere Resourcenbasis zu haben, ein neues JV oder der Treffer beim JV mit IGO bringt eine Lagerstätte hervor.
      So könnte die unausweichliche nächste CR bei einem höheren Kurs erfolgen.
      GOR hat gezeigt, dass es möglich ist.
      Avatar
      schrieb am 12.03.16 11:52:05
      Beitrag Nr. 95 ()
      Gestern ging es munter weiter:

      Das Schlacht so schnell eröffnet wird - immerhin will man die Asset´s von ABU doch nicht so einfach hergeben wie es scheint.
      Avatar
      schrieb am 17.03.16 10:01:18
      Beitrag Nr. 96 ()
      Avatar
      schrieb am 23.03.16 10:59:45
      Beitrag Nr. 97 ()
      IGO/ABM haben heute zum JV die EM für Bumblebee gemeldet.
      Es gibt noch Lichtblicke, leider beginnt der spannende Teil erst im Juni.
      http://www.asx.com.au/asxpdf/20160323/pdf/436171zjb1d2zc.pdf
      Avatar
      schrieb am 04.04.16 20:57:54
      Beitrag Nr. 98 ()
      Am 310316 wurde das GM vom 18.04.16 abgesagt und der zeitliche Ablauf der CR geändert.
      http://www.asx.com.au/asxpdf/20160331/pdf/43666jz6bxmjrc.pdf
      Am 010416 kam noch wie folgt:
      Avatar
      schrieb am 12.04.16 14:07:35
      Beitrag Nr. 99 ()
      Avatar
      schrieb am 29.04.16 11:38:28
      Beitrag Nr. 100 ()
      Avatar
      schrieb am 02.05.16 09:02:55
      Beitrag Nr. 101 ()
      Avatar
      schrieb am 05.05.16 19:46:29
      Beitrag Nr. 102 ()
      Heute kam ein Trading Halt bezüglich Lake Mackay raus.

      http://www.asx.com.au/asxpdf/20160505/pdf/43715g6qgh6ddr.pdf
      Avatar
      schrieb am 06.05.16 11:24:28
      Beitrag Nr. 103 ()
      Die Meldung zum TH kam nun recht schnell:
      http://www.asx.com.au/asxpdf/20160506/pdf/43723676j6jfg7.pdf

      Seit langem ist in der aktuell konfusen Situation um ABU mal ein Lichtblick auszumachen.
      Der Einstieg von Craton Capital kann auch ein Zock gewesen sein, wer weiss.
      Das sich IGO jetzt für die Shares von ABU entschieden hat und nicht für eine Cash-Zahlung,
      ist hoffentlich ein gutes Zeichen.
      IGO ist näher an ABU´s Vorstand dran und dessen weitere Planung als wir.
      Die von einigen Aussie´s befürchtete endlos Verdünnung mit Shares wird es wohl so nicht geben.
      Sonst hätte IGO cash bezahlt und die Shares gemieden.
      An einer Kapitalerhöhung gibt es keinen Weg vorbei, jedoch zu anderen Kursen.
      Das IGO an gute Bohrergebnisse im Juni glaubt, sollte eine gewisse Stütze für den Kurs sein.
      Das die zukünftige Entwicklung bei ABU noch viele Fragezeichen offen läst ist klar,
      dieser Schritt von IGO könnte eine wichtige Weichenstellung für ABU sein.
      So IGO sich als Anteilseigner in den operativen Teil bei ABU mit einbringt, sehe ich viel Licht.
      Avatar
      schrieb am 09.05.16 09:12:51
      Beitrag Nr. 104 ()
      http://www.asx.com.au/asxpdf/20160509/pdf/4373t7tp4dmcdc.pdf
      Die Gesprächspunkte für das GM heute wurden zurückgezogen.
      Beide Hauptaktionäre haben sich über das weitere Vorgehen geeinigt.
      Details siehe Link.
      Dem Umsatz und der Kursrichtung an der ASX folgend, wird die Vereinbarung positiv gewertet.
      Avatar
      schrieb am 10.05.16 10:59:57
      Beitrag Nr. 105 ()
      Es folgte die Bestätigung zur gestrigen Meldung:
      10 May 2016
      Board and Management Changes
      Further to ABM Resources NL
      ’s (“ABM” or “the Company”) announcement on 9 May 2016, ABM advises that the Board and management changes have now occurred. Effective 9 May 2016 Mr Brett Smith was appointed to the role of non-executive director, Mr Andrew Ferguson stepped down as non-executive director and Mr Brett Lambert’s stepped down as executive director and has returned to
      the role of Chief Executive Officer of the Company.
      Mr Smith has participated in the development and delivery of a number of mining and mineral
      processing projects including coal, iron ore, base and precious metals.
      He has also managed engineering and construction companies in Australia and internationally.
      Mr Smith has served on boards of both private and public mining and exploration companies.
      Overall, Mr Smith has over 30 year’s international experience in the engineering, project development and organisational change management. Attached are the relevant Appendices 3Z and Appendix 3X lodged on behalf of the directors.
      Avatar
      schrieb am 24.05.16 10:57:48
      Beitrag Nr. 106 ()
      IGO hat eine neue Präsentation mit einer kurzen Info zum JV:

      http://www.asx.com.au/asxpdf/20160524/pdf/437g5mr6s86rpp.pdf
      1 Antwort
      Avatar
      schrieb am 24.05.16 11:42:55
      Beitrag Nr. 107 ()
      Antwort auf Beitrag Nr.: 52.465.553 von grenzwall am 24.05.16 10:57:48Die bisherigen Ergebnisse von Bumblebee sind gut genug um andere Unternehmen aktiv werden zu lassen.
      JERVOIS MINING und AUSTRALIAN MINES haben ein JV vereinbart um in der angrenzenden Region aktiv zu werden.
      Als Motiv wird auf die Entdeckung von IGO/ABU Bumblebee hingewiesen.
      Avatar
      schrieb am 02.06.16 10:56:40
      Beitrag Nr. 108 ()
      Heutige Meldung aus ASX / Unternehmensupdate
      http://www.asx.com.au/asxpdf/20160602/pdf/437n7m7cbq448x.pdf
      1 Antwort
      Avatar
      schrieb am 02.06.16 11:20:53
      Beitrag Nr. 109 ()
      Antwort auf Beitrag Nr.: 52.524.401 von grenzwall am 02.06.16 10:56:40Ein Durchatmen ist wohl erstmals erlaubt:
      The board has therefore elected to defer plans for raising additional capital.​
      Das Damoklesschwert der anstehenden Kapitalerhöhung zu diesen Kursen ist damit vom Tisch.
      Die Bohrprogramme von ABU werden jetzt umgesetzt, so dass Ende Juli erste Ergebnissen erwartet werden können. Bei den Bohrungen von IGO ist ein ähnlicher Zeitrahmen zu erwarten, es sei denn, es käme eine Formulierung wie "Multiple Visible ... Intersections".
      Avatar
      schrieb am 04.07.16 11:43:50
      Beitrag Nr. 110 ()
      Nach der Überwindung des Widerstandes von 0,07 müsste jetzt Luft nach 0,25 sein:D:cool:
      Avatar
      schrieb am 18.07.16 14:35:59
      Beitrag Nr. 111 ()
      Erste Ergebnisse der Explorationsarbeiten heute auf ASX gemeldet:
      http://clients3.weblink.com.au/pdf/ABU/01757990.pdf
      Avatar
      schrieb am 27.07.16 10:24:21
      Beitrag Nr. 112 ()
      Heutige Meldung auf ASX
      Highlights

      Anomalous gold values in all eight Suplejack prospects drilled

      Significant gold intercepts at two new prospects, including

      Pandora, hole PARC100003 – 9 metres at 6.32 g/t gold

      Brokenwood, hole BWRC100006 – 3 metres at 9.34 g/t gold

      1,000 metre, eight hole follow-up RC program completed at Tethys, assays awaited

      Results encourage ABM to step up activities at Suplejack, diamond drilling planned

      Low tenor copper, zinc and lead mineralisation logged in all Bumblebee holes

      Bumblebee interpreted to be a VMS system

      Drilling at Bumblebee has supported the prospectivity of Lake Mackay Project, IGO plan to
      undertake further exploration including ground and airborne geophysics and soil sampling

      http://www.asx.com.au/asxpdf/20160727/pdf/438tx6jx22vrrj.pdf
      Avatar
      schrieb am 29.07.16 10:40:09
      Beitrag Nr. 113 ()
      Avatar
      schrieb am 03.08.16 14:47:53
      Beitrag Nr. 114 ()
      Der aktuellen Ausrichtung der Firma folgend wurde Brett Lambert verabschiedet.
      Seine Dienste als Bergbauingenieur werden derzeit nicht benötigt.



      Management Changes
      As part of the transition of ABM Resources NL (“ABM” or the “Company”) to a focused
      exploration company, the Chief Executive Officer Mr. Brett Lambert has resigned. Mr Lambert
      will assist with an orderly handover of duties over the coming months.
      Brett, a highly experienced mining engineer, joined the company in October 2015 initially as
      interim Chief Executive Officer and has since steered the company through a difficult period
      of mining and corporate action. Mining and processing concluded in the June 2016 Quarter
      and the Coyote Gold Plant was returned to Tanami Gold NL in mid-July 2016. The Company
      would like to thank Brett for his dedication and leadership over this period and wish him all
      the best in his future endeavours.
      The company has initiated a search for an experienced exploration executive to focus and
      unlock the discovery potential of ABM’s large and strategic tenure. The Chairman, Mr.
      Tommy McKeith, will assist until a suitable candidate is appointed.
      Avatar
      schrieb am 19.08.16 10:24:49
      Beitrag Nr. 115 ()
      Die angekündigte Neuberechnung der Resource von Old Pirate wurde heute gemeldet.
      http://www.asx.com.au/asxpdf/20160819/pdf/439g4cd0rgst7j.pdf
      Scheinbar wurden einige von den neuen Zahlen überrascht.
      Für jeden, der sich mit den Produktionsergebnissen beschäftigt hat, sollte klar gewesen sein,
      dass das Erz von OP nicht andeutungsweise an die Werte herankam, wie sie ursprünglich propagiert wurden.
      Die einzige belastbare Resource stellt derzeit Buccaneer dar.
      15 Mio/Tonnen mit top-cut 2,23 g/t AU = 1,1 Mio/Oz Au top-cut
      Einige der letzten Bohrergebnisse von Buccaneer brachten ja mehrere höhergradige Abschnitte.
      Sollten sich diese bestätigen, könnte eine Neubewertung Sinn machen.
      Bis dahin sind einzig die ausstehenden Bohrergebnisse oder mögliche neue JV auf der Tagesordnung.
      Avatar
      schrieb am 23.08.16 10:04:44
      Beitrag Nr. 116 ()
      Mit dem neuen MD ist nun der Austausch der alten Führungsriege abgeschlossen.
      Hoffentlich wird ab jetzt im Sinne der Firma gearbeitet.
      Avatar
      schrieb am 25.08.16 09:17:49
      Beitrag Nr. 117 ()
      Avatar
      schrieb am 25.08.16 22:36:09
      Beitrag Nr. 118 ()
      http://www.asx.com.au/asxpdf/20160825/pdf/439mctn3nkc1rl.pdf
      hoffe dieser Link führt auf die gewünschte Seite
      Avatar
      schrieb am 15.09.16 15:04:36
      Beitrag Nr. 119 ()
      http://www.asx.com.au/asxpdf/20160915/pdf/43b659zn50x70k.pdf
      Neue Präsentation zur Lage der Dinge bei ABM.
      Avatar
      schrieb am 11.10.16 10:24:49
      Beitrag Nr. 120 ()
      Update auf ASX vom 11.10.16
      http://www.asx.com.au/asxpdf/20161011/pdf/43bwd6bmr5wz80.pdf
      Über den möglichen Verkauf/JV von Old Pirate and Buccaneer und den finanziellen Konsequenzen
      läst sich trefflich spekulieren. An potenten Kandidaten fehlt es ja nicht in der Region.
      NST kauft ja lieber Projekte als Firmen und ist in unmittelbarer Nachbarschaft sehr aktiv, der Cashbestand ist üppig.
      Avatar
      schrieb am 28.10.16 09:17:37
      Beitrag Nr. 121 ()
      Der neue Quartalsbericht ist heute aus ASX erschienen:
      http://www.asx.com.au/asxpdf/20161028/pdf/43cdy5n6tckhdl.pdf
      Avatar
      schrieb am 03.11.16 09:30:02
      Beitrag Nr. 122 ()
      Der letzte Quartalsbericht hatte ja nur bekanntes im Angebot.
      Vom gestrigen AGM gibt es auf hotcopper einen interessanten Beitrag.
      Der neue Vorstand Matt Briggs war vorher bei Gold Fields " headed Group Strategic Planning for Gold Fields Limited.
      Bemerkenswert ist seine folgende Aussage zu den Liegenschaften von ABM:" Mind you, he said he had been studying them for the last three years. That tells you something. As he put it "why do you think I took the job?"

      Avatar
      schrieb am 14.11.16 09:40:57
      Beitrag Nr. 123 ()
      Neues vom JV mit IGO
      http://www.asx.com.au/asxpdf/20161114/pdf/43cw035ml36n23.pdf

      Mal schauen was die weiteren Löcher bringen.
      Wenn das Volumen an der ASX noch anspringt, könnten wir den Boden hinter uns haben.
      Avatar
      schrieb am 06.12.16 12:08:48
      Beitrag Nr. 124 ()
      Rauschen

      Über die treibende Kraft hinter der Kursentwicklung der letzten Wochen wird bei den Aussis
      lebhaft diskutiert.
      Diverse ausstehende Bohrergebnisse (Schwerpunkt auf Lake Mackay), neue JV oder strukturelle Änderungen bei den Top 40.
      Bei der Aktionärsstruktur lohnt sich ein Blick auf ein Post welches auf hotcopper erschien:

      Was es auch sein wird, fundamental muss weiter geliefert werden, dann sollte der Kurs seine
      Richtung beibehalten und das Land der Schmerzen hinter uns liegen.
      Avatar
      schrieb am 07.12.16 09:28:01
      Beitrag Nr. 125 ()
      Exploration Update Suplejack Drilling Results vom 071216 auf ASX
      http://www.asx.com.au/asxpdf/20161207/pdf/43djv0s3wnvl52.pdf
      Avatar
      schrieb am 20.12.16 09:42:40
      Beitrag Nr. 126 ()
      Avatar
      schrieb am 31.01.17 12:30:33
      Beitrag Nr. 127 ()

      http://clients3.weblink.com.au/pdf/ABU/01824190.pdf

      So es die Wetterbedingungen zulassen, sollen weitere Bohrungen die Ausdehnung der gefundenen Mineralisierung testen. Mit der ausstehenden Neukalkulation für Hyperion - Tethys im ersten Quartal
      hat dieses Projekt alles um eine Erweiterung der Resource zu liefern.
      Die neue Chefetage hat wohl den Gürtel enger geschnallt, die laufenden Kosten wurden stark runter gefahren.
      Avatar
      schrieb am 20.02.17 09:09:25
      Beitrag Nr. 128 ()
      Suplejack Mineral Resource increases to 309,900 ounces, representing a 53% increase
      Das erwartete update der Resource wurde heute gemeldet:

      http://clients3.weblink.com.au/pdf/ABU/01829772.pdf


      Hoffentlich ändern sich die Wetterbedingungen, das die Bohrungen fortgesetzt werden können.
      Die Ausdehnungen der Mineralisierungen sind ja teilweise in Länge und Tiefe noch offen.
      Avatar
      schrieb am 24.02.17 11:16:18
      Beitrag Nr. 129 ()
      Cobalt - Lake Mackay
      Anmerkung zu den Cobalt Werten bei Grappel ( JV mit IGO)

      Bei einer Multi Element Lagerstätte, kann Cobalt als Beimischung erheblichen Einfluss
      auf den Break Even Point der Gewinnschwelle haben.
      *
      IGO scheint das wohl auf seinem Radar zu haben. In der gestrigen Präsentation
      sprechen Sie von Lake Mackay von „long-life, high-margin“.

      *
      Bei den Angaben zu Grappel gibt es zwar noch nicht die wahre Breite der Mineralisierung,
      aber Werte mit 0,25 / 0,26 / 0,15 / 0,20 / 1,71 / 0,19 Co(%) über 1m bis 9m sind alle mal
      eine Position die es zu beachten gilt.
      Avatar
      schrieb am 02.03.17 11:09:00
      Beitrag Nr. 130 ()
      Heute gab es auf ASX mal eine Meldung, welche es in dieser Form für ABU noch nicht geben hat.
      Ein Direktor hat am freien Markt Aktien der eigenen Firma gekauft.
      02/03/2017 9:34 AM Change of Director's Interest Notice
      Thomas McKeith 250.000 Shares / 27.02.17 / 0,115 A$
      Ein weiterer wichtiger kleiner Schritt in die richtige Richtung - Vertrauen aufbauen.
      Avatar
      schrieb am 20.03.17 12:56:50
      Beitrag Nr. 131 ()
      Gold Fields !!
      Heute wurde Mr Jones als neuer Exploration Manager bekannt gegeben.
      Wie andere Direktoren von ABM hat er auch mal für Gold Fields gearbeitet.
      Keine Ahnung ob es da eine Verbindung gibt, für mich aber schon erstaunlich.
      Gold Fields muss sich ja auch für die Zukunft ausrichten.
      Bei Gold Road haben Sie sich ja schon mit 50% eingekauft, Cash 350,- A$ Mio.
      ABM hat riesige unerforschte Ländereien mit einzelnen Funden die erkundet werden müssten.
      Evtl. ist ja Gold Fields einer der Verhandlungspartner für anstehende JV.

      *
      "ABM Resources NL (ASX: ABU) is pleased to announce the appointment of Mr Neil Jones as Exploration Manager. Mr Jones has been a geologist for 18 years with roles in greenfields and brownfields exploration and on mining operations. He has worked as a geologist in the minerals industry for Normandy Mining, Gold Fields, PMI Gold and Troy Resources exploring primarily for gold. "

      "Matt Briggs most recently headed Group Strategic Planning for Gold Fields Limited."

      "Tommy McKeith, Previous Gold Fields, Troy Resources, Gencor"
      *
      "Ms Susie Corlett - RGC Limited and Goldfields Limited."
      *
      Avatar
      schrieb am 21.03.17 08:52:59
      Beitrag Nr. 132 ()
      Die gestrige Meldung enthielt auch einen Hinweis, auf das aktuell beginnende Bohrprogramm.
      Die Regenzeit ist, da können die Rigs wieder drehen.
      Avatar
      schrieb am 28.03.17 11:11:12
      Beitrag Nr. 133 ()
      Die Ziele für die 2017 Bohrkampange wurde heute in einer "AGES Presentation" gemeldet.

      http://www.asx.com.au/asxpdf/20170328/pdf/43h2yyb435bbzz.pdf
      Avatar
      schrieb am 13.04.17 09:47:44
      Beitrag Nr. 134 ()
      Heute wurde nun endlich der Start der Bohrungen gemeldet, durch den starken Regen in der Region ist leider viel Zeit verloren gegangen.
      http://www.asx.com.au/asxpdf/20170413/pdf/43hhs8mqsp7tvp.pdf


      Avatar
      schrieb am 26.04.17 13:12:08
      Beitrag Nr. 135 ()
      Der Quartalsbericht ist heut erschienen:
      http://www.asx.com.au/asxpdf/20170426/pdf/43hqyd164qqysy.pdf
      Der spannende Teil mit den laufenden Bohrungen erfordert noch etwas Zeit.

      Die Segnungen der Bürokratie scheinen auch in Down Under in voller Blüte zu stehen:
      IGO have outlined a large scale reconnaissance program to advance exploration on the
      application areas at Lake Mackay and continue earning into this new mineral province.
      Currently IGO and ABM are continuing negotiations on the exploration agreement
      with the Central Land Council to progress the tenements to be granted and allow this
      exploration to proceed. The work program for 2017 will need to be modified, potentially
      restricted to the granted tenement if an agreement cannot be reached with
      the Central Land Council in the short term.
      Avatar
      schrieb am 16.05.17 10:51:42
      Beitrag Nr. 136 ()
      Drilling has commenced at the Homestead Prospect
      http://www.asx.com.au/asxpdf/20170516/pdf/43j91r5w39837c.pdf
      Nun gehts endlich los und wie immer das quälende Warten auf die Ergebnisse.
      Avatar
      schrieb am 08.06.17 08:47:21
      Beitrag Nr. 137 ()
      Progress Results for Seuss RC and Homestead Diamond Drilling

      http://www.asx.com.au/asxpdf/20170608/pdf/43jtb7l329jvx5.pdf
      Managing Director Matt Briggs said “These Seuss results demonstrate the potential for continuing
      exploration to yield additional mineralised shoots. The high grade intersections seen are a welcome bonus and highlight the potential for underground targets at Suplejack to be added to the company’s portfolio.”
      Results for 19 out of 23 holes have been finalised from Seuss.
      Two mineralised shoots are observed. One plunging shallowly south and a second representing
      the intersection of the Tethys and Seuss structures. Both shoots remain open at depth.
      The tenor of the intersections opens up the possibility of underground mining to be
      considered if adequate volumes are defined.



      Sehr gute Zahlen und die Ausdehnung der Strucktur hat noch reichlich Potential in der Länge und Tiefe. Die endgültigen Ergebnisse für das volle Programm werden in den nächsten zwei Wochen erwartet.
      Weitere RAB-Bohrungen sollen Mitte Juni beginnen.
      Avatar
      schrieb am 15.06.17 07:54:00
      Beitrag Nr. 138 ()
      Director Thomes McKeith hat 1.476.869 Aktien im offenen Markt gekauft, AUD$ 143.256,-.
      Ein wichtiger Vertrauensbeweis.
      So die kommenden Bohrergebnisse ähnlich gut ausfallen, bekommt ABU die substanzielle Basis
      die es braucht.
      Avatar
      schrieb am 23.06.17 14:19:22
      Beitrag Nr. 139 ()
      Heute wurde der Abschlussbericht über die RC Bohrungen bei Suplejack und die Diamand Drilling auf Homestead veröffentlicht.
      http://www.asx.com.au/asxpdf/20170623/pdf/43k49pgrb6nt7k.pdf
      Die weitere Erforschung wird sich nun auf die beiden entdeckten Mineralisierungen konzentrieren.
      Der Schnittpunkt der Tethys- und Seussstrukturen bleibt in der Tiefe offen und die Seuss Strucktur ist nach Süden hin offen.
      Das Programm hat Nord-Süd-mineralisierte Strukturen mit Streik-Kontinuität bestätigt.
      Die unmittelbare Priorität für die zukünftige Arbeit ist es, zusätzliche flach mineralisierte Zonen zu identifizieren und die Kontrolle der mineralisierten Abschnitte zu verbessern, um das Bohren zu optimieren.
      Die Ergebnisse bei Seuss

      Das Ergebnis vom Bohrloch HYRC100031 -13mts bei 1,9 g p / t deutet an, das der Tethy-Trend auch noch mehr zu bieten hat.
      Aktuell wurde mit den Vorbereitung begonnen, um die ersten 80 Aircorelöcher des Suplejack-Programms zu bohren, Sie warten derzeit auf die Ankunft der Rig´s.

      Bei den Testbohrungen auf Homestead gab es keine Treffer. "The XRF data suggest the sediments intersected in the hole are reworked Mt Charles Formation, and a possible source of the anomaly.
      Collaborative funding has been granted by the Northern Territory Department of Primary Industry and Resources under the CORE initiative." Es sind keine direkt anschließenden Aktivitäten geplant.

      Statt neue Ziele zu testen sollte die Priorität eher auf die Erkundung bekannter Erzkörper liegen, von denen mehrere ja vorhanden sind.
      Z. B.
      Mit dem North Arunta Project hat ABM so ein vielversprechendes Gebiet.
      Vorliegende Bohrergebnisse :
      Kroda – 14km of anomalism with 4 main target areas including drillhole intercepts
      of 57m@3.83g/t Gold and 29m @ 6.48g/t Gold.
      Tulsa – 10km of anomalism.
      Stafford – 20km of anomalism with 10 main target areas. Drillhole intercepts
      include 35m @2.02g/t Gold, and 2m @18.15g/t Gold. Rock chip results include
      >20% Copper and >200g/t Silver.
      Avatar
      schrieb am 28.06.17 09:47:24
      Beitrag Nr. 140 ()
      Commencement of Suplejack Reconnaissance Aircore Drilling
      Es geht mit dem angekündigten Bohrungen auf Suplejack los.
      HIGHLIGHTS
      o Commencement of reconnaissance drilling in the southern Suplejack area
      o 6 target areas being tested with aircore/RAB drilling
      o 164 holes are planned
      http://www.asx.com.au/asxpdf/20170628/pdf/43k7jfvvgwmpll.pdf
      ABM Resources (ABM) is pleased to advise that aircore drilling has commenced on the company’s
      100% owned Suplejack Project in the Tanami Region of the Northern Territory.
      ABM is focussed on exploration in the Tanami. This is a prospective terrain that has had limited
      previous work completed. The company is systematically working through its tenement holding
      pursuing the highest quality opportunities. RC drilling by ABM over the last twelve months has
      successfully intersected mineralisation under existing RAB anomalies. This targeted drilling has seen a 53% increase in Resources on the Suplejack Project (ASX 20 February 2017).
      Exploration activities are now shifting towards the large areas that have no prior bedrock testing. The company is prioritising areas that contain large-scale anomalies or highly ranked conceptual targets and will be testing these with RAB or aircore drilling. Existing bedrock anomalies will be
      opportunistically tested where they have scale potential.
      Aircore drilling has commenced at Suplejack testing 6 target areas. Once final EPA approvals are
      received for Capstan within the Bluebush Project, the rig will be moved to that area. The drilling of
      both programs is expected to be completed during the third quarter of 2017.
      Suplejack
      ABM’s management and geologists have been working through the company’s tenement portfolio and prioritising work programs. This has included capturing and validating large volumes of data previously missing from the company’s datasets. The limited work previously completed in the area has already lead to the discovery of the Crusade, Tregony, and Groundrush deposits. ABM has more recently been successfully growing its Resources at Suplejack including Hyperion, Tethys and Seuss.
      The goal of current and future exploration in the Suplejack area is to demonstrate that there are
      multiple structures within a mineralised system that can individually, or collectively, support a
      standalone mining operation.


      Seuss North (37 holes)
      Seuss South (43 holes)
      Suplejack EW (19 holes)
      Pandora (6 holes)
      Initial RC drilling of Pandora intersected 9 metres at 6.3g/t gold from 57 metres
      (ASX 27 July 2016).

      Brokenwood (16 holes)
      Initial RC drilling of Brokenwood intersected 3 metres at 9.3g/t gold from 69 metres
      (ASX 27 July2016).
      Dry River (43 holes)
      Avatar
      schrieb am 03.07.17 10:32:24
      Beitrag Nr. 141 ()
      IGO meldet : Lake Mackay JV Field Activities to Recommence
      Ab Mitte Juli wird wieder gebohrt.
      Der Link zur heutigen Meldung:
      http://www.asx.com.au/asxpdf/20170703/pdf/43kcgqs2zztyr4.pdf

      Für eine wirtschaftliche Lagerstätte fehlt zwar noch der Nachweis, jedoch haben diese 4 das Potenzial diesen zu erbringen.
      Managing Director Matt Briggs said “The diamond drilling program planned at Grapple will increase
      the understanding of the style of mineralisation while also potentially growing the deposit.
      The encouraging results so far are evidence that Lake Mackay has the potential to be a new
      metallogenic province.”
      Avatar
      schrieb am 31.07.17 10:06:43
      Beitrag Nr. 142 ()
      Avatar
      schrieb am 31.07.17 12:26:12
      Beitrag Nr. 143 ()
      Die Unzen pro Meter lesen sich klasse, jetzt muss nur noch die Länge der Abschnitte stimmen,
      dann darf kalkuliert werden.


      Hoffe, Sie können bald den Aufbau der Strucktur bei Seuss interpretieren.
      Es ist schön zu sehen, dass endlich an dem Update der Buccaneer Resource weiter gearbeitet wird.
      Wurde ja noch von dem alten Management begonnen (mit guten Bohrergebnissen) und leider nicht
      zu ende gebracht.
      Avatar
      schrieb am 09.08.17 09:56:46
      Beitrag Nr. 144 ()
      kurze Meldung von IGO zu den laufenden Arbeiten bei Lake Mackay:

      http://www.asx.com.au/asxpdf/20170809/pdf/43l8hdv6pnvplq.pdf
      Bis zu den Ergebnissen wird es noch etwas dauern.
      Avatar
      schrieb am 22.08.17 18:17:19
      Beitrag Nr. 145 ()
      Der Kursbewegung folgte die übliche Anfrage von Seiten der ASX und die Antwort darauf.
      Hier die Antwort:
      http://www.asx.com.au/asxpdf/20170822/pdf/43lm7smvymfnh2.pdf

      Wie so oft, keiner Weiß etwas, alles bekannte Infos.
      Warum hatte man es auf der Käuferseite so eilig?
      Positionen aufbauen wäre auch unauffälliger möglich.
      Die Kursbewegung ist bei dem recht geringem Volumen beachtenswert.
      Wer jetzt noch Aktien im Bestand hat, schmeißt diese nicht gleich beim ersten Pluszeichen, gefällt mir.
      ABU ist derzeit an mehreren Fronten aktiv, da sind bedeutende News überall möglich.
      Das JV mit IGO (keine Kursreaktion) und eine CR schließe ich mal aus.
      Avatar
      schrieb am 01.09.17 10:33:22
      Beitrag Nr. 146 ()
      Heute wurde die überfällige Neubewertung der Buccaneer Resource veröffentlicht.
      Sehr umfangreich der Bericht, aber eine Bewertung der auch ein gewisses Vertrauen geschenkt werden kann.
      Wünschte das alte Management hätte ansatzweise so gearbeitet.
      Der Link zur Meldung:
      http://www.asx.com.au/asxpdf/20170901/pdf/43lzmxzm3whftb.pdf

      Nach den Ereignissen von vor fast 2 Jahren, hatte ich für Buccaneer noch 1/3 der ursprünglichen
      Kalkulation als real erwartet, da bleibt sogar etwas mehr stehen.
      Das diese Meldung den Kurs so in Bewegung bringt überrascht mich dann aber doch etwas.
      Nach all dem was in den letzten Jahren so um ABM Resources passiert ist, hatte ich gedacht, dass die verbliebenen Aktionäre wissen womit Sie es zu tun haben.
      Möglich ist aber auch, dass einige Momentum-Trader an der ASX abgeschüttelt wurden.
      Avatar
      schrieb am 07.09.17 08:37:05
      Beitrag Nr. 147 ()
      Hat lange genug gedauert, könnte der Grund für die plötzlichen Käufe gewesen sein.

      http://www.asx.com.au/asxpdf/20170907/pdf/43m4gchrkp4wnd.pdf
      Avatar
      schrieb am 13.09.17 12:47:06
      Beitrag Nr. 148 ()
      Der abschließende Bericht über das Bohrprogramm bei Suplejack wurde heute veröffentlicht.
      Die Aircore Bohrungen dienten der Erkundung der Geologie.
      Derzeit wird an der Fertigstellung eines 3D-Modells (Struktur / Geochemie ) gearbeitet.
      Dieses soll dann ABM erlauben, optimiert die nächste Bohrphase zu planen.
      Bin gespannt, was das Assay zu den Multielementen bringen wird:
      "560 historic RAB holes submitted for multi-element geochemistry".

      http://www.asx.com.au/asxpdf/20170913/pdf/43m905pdxs11cd.pdf
      Avatar
      schrieb am 18.09.17 09:06:15
      Beitrag Nr. 149 ()
      Die Ergebnisse vom ersten Bohrloch bei Grapple wurden gemeldet.

      Der Link zur Meldung:
      http://www.asx.com.au/asxpdf/20170918/pdf/43mdpqx27hjzrw.pdf

      In jeder Beziehungen sehr ermutigend. Die Länge der Mineralisierung ist mit derzeit 600m
      nun bestätigt, Erweiterung möglich. Zwischen den bestehenden Bohrungen ist noch sehr viel Platz
      zum detaillierten Erforschen der Struktur und am besten gefällt mir daran, IGO hat das Wissen, das Geld und nun auch die Genehmigungen die notwendigen Arbeiten voran zu bringen.
      Avatar
      schrieb am 16.10.17 10:21:51
      Beitrag Nr. 150 ()
      ABM and Thunderbird Metals sign North-Arunta Exploration Agreement

      http://www.asx.com.au/asxpdf/20171016/pdf/43n7yby3x05jwp.pdf

      Ein riesiges Gebiet aber die Ausgangspunkte sollten ja anhand der vorliegenden
      Daten leicht sein.

      Avatar
      schrieb am 16.10.17 14:45:46
      Beitrag Nr. 151 ()
      Konnte über unseren JV Partner bisher nicht viel finden.
      Die Homepage ist recht überschaubar:
      https://www.thunderbirdmetals.com/
      Da Sie im Northern Territory andere Projekte haben, wissen Sie warauf Sie sich einlassen
      (Infrastrucktur, Wetter).

      Der Hinweis " A proven, award-winning targeting technology and approach." klingt gut.
      Wenn Sie uns den Beweis liefern und uns vor allem regelmäßig mit News versorgen wird es mir recht sein. Hätte es lieber gesehen, dass ABU diese Liegenschaft selbst erkundet.
      Es kommt aber endlich Schwung in die Sache und kostet uns kein Geld - also gute Nachricht.
      Avatar
      schrieb am 18.10.17 08:24:02
      Beitrag Nr. 152 ()
      IGO scheint die gleiche Taktik wie bei Fraser Range zu verfolgen.
      Kontrolle über so viel Land wie möglich zu bekommen.
      Konsequentes handeln von IGO; Vulkanogene Massive Sulfidlagerstätten treten selten als
      Satellit auf, meist in Gruppen, was Sie nun nachweisen können.
      Die Bohrergebnisse vom JV wären mir zwar lieber gewesen, jedoch beweist die heutige Meldung
      das Vertrauen von IGO in das Projekt.


      der Link :
      http://www.asx.com.au/asxpdf/20171018/pdf/43nb8j85wvq6h1.pdf
      Positiv ist das die ABU / IGO Gebiete nun vollständig bewilligt sind.
      Avatar
      schrieb am 31.10.17 09:16:53
      Beitrag Nr. 153 ()
      Quarterly
      http://www.asx.com.au/asxpdf/20171031/pdf/43ns85931myqzf.pdf
      Die Lake Mackay Ergebnisse von Grapple lassen weiter auf sich warten.
      Avatar
      schrieb am 08.11.17 08:55:16
      Beitrag Nr. 154 ()
      Investor Presentation November 2017
      Übersichtliche Darstellung, mit neuem Zahlenwerk garniert wäre es noch schöner, also weiter warten.

      und der Fahrplan für die kommenden Quartale:

      Wenn das JV mit Thunderbird im Dezember steht, gibt es hoffentlich von der Seite bald Newsflow.
      North Arunta

      Das ein Projekt mit diesen Bohrergebnissen so lange brach gelegen hat,...
      Avatar
      schrieb am 08.11.17 09:01:42
      Beitrag Nr. 155 ()
      Avatar
      schrieb am 15.11.17 12:16:17
      Beitrag Nr. 156 ()
      Lake Mackay JV: Final Grapple Diamond Drilling Results vom 15.11.17
      http://www.asx.com.au/asxpdf/20171115/pdf/43p7x7985p46dm.pdf

      Da die Arbeiten von IGO durchgeführt werden, wäre ein Komentar von IGO zur Interpretation
      der Ergebnisse sehr willkommen.
      Das Bohrloch 17GRDD006 hat nun die Mineralisierung nicht getroffen und alle die allein auf Grapple
      spekuliert haben sind wohl abgesprungen.
      Das Sirius seinerzeit über 200 Löcher bohrte bis Sie einen Treffer hatten und noch viele mehr um dann der Mineralisierung (Nova) zu folgen und in der Folge Bollinger zu finden scheint völlig in Vergessenheit geraten zu sein.
      Es bleibt wie es bisher war, ein harter Ritt.
      Avatar
      schrieb am 21.11.17 09:50:34
      Beitrag Nr. 157 ()
      RC Drilling has commenced at the Suplejack Project
      http://www.asx.com.au/asxpdf/20171120/pdf/43pcr73lmhnl6b.pdf
      Avatar
      schrieb am 21.11.17 09:56:41
      Beitrag Nr. 158 ()


      P.S.:
      Die Ankündigung zeigt, dass Aufklärung in der ersten systematischen Grundprüfung
      der Bereich für neue großflächige Anomalien durch RAB-Bohrungen erreichte genau das, was sie erreichen wollten.

      RTA-Bohrkernbohrungen haben eine 8 km lange flache Goldanomalie unter Arsenanomalien bestätigt, die zuvor bei der Bodenprobenentnahme identifiziert wurde es ist wahrscheinlich, dass dieser Anomalismus mit mehreren goldhaltigen Strukturen zusammenhängt.

      Wichtig es richtig einzuardnen, oberhalb von 100 ppb Arsen oder über 50 ppb definiert Gold typischerweise die Systemausdehnung.
      Über 200ppb Gold deutet es oft darauf hin, dass eine mineralisierte Struktur in der Nähe durchschnitten wurde.

      Die Bohrungen im Nordosten des Projektgebiets wurden ebenfalls abgeschlossen, anomale Ergebnisse auf drei Linien mit breiteren Zonen geschnitten auf den östlichen zwei Bohrlinien schneiden, sind die besten Ergebnisse: 6m @ 249ppb Au von 39m (BL0003) &
      3m bei 92ppb Au von 42mts (BL0019)


      http://www.asx.com.au/asxpdf/20171121/pdf/43pdwvjy2pgbdw.pdf
      Avatar
      schrieb am 19.12.17 15:47:35
      Beitrag Nr. 159 ()

      Der Link zur Meldunghttp://www.asx.com.au/asxpdf/20171219/pdf/43q91j8k7vlhzr.pdf
      Weiter Ergebnisse werden in den kommenden 2 Wochen erwartet.
      Avatar
      schrieb am 15.01.18 20:22:33
      Beitrag Nr. 160 ()

      http://www.asx.com.au/asxpdf/20180115/pdf/43qtf8yp9tn94q.pdf
      Die ausstehenden Ergebnisse liegen nun vor, mal schauen was die kommende RS Berechnung bringen wird, 500+ T Oz?
      Avatar
      schrieb am 31.01.18 09:24:12
      Beitrag Nr. 161 ()
      Der Quartalsbericht bringt wenig neues, der Verkauf von Buccaneer und Old Pirat schreite wohl voran.
      Sollte dem Unternehmen finanziell mehr Spielraum geben, sobald es durch ist.
      Noch mehr Bedeutung wird aber haben, wer der Käufer sein wird.
      Der CEO von Northern Star/NST hat in der Vergangenheit immer die gute Cashposition von NST hervorgehoben und wie viele Kaufgelegenheiten sich Ihnen bieten werden.

      Suplejack ist ja in direkter Nachbarschaft von NST/Groundrush.
      NST will Groundrush wieder in Produktion bringen.
      Wenn ABU die Unzen bei Suplejack weiter erhöhen kann, ( was die Bohrergebnisse ja erwarten lassen ) würde es mich doch sehr wundern, so Sie sich diesen Happen nicht holten.
      Avatar
      schrieb am 15.02.18 16:09:54
      Beitrag Nr. 162 ()
      IGO ist weiter fleißig am Lake Mackay.

      https://www.asx.com.au/asxpdf/20180213/pdf/43rjmvsp4ryq9p.pd…
      Avatar
      schrieb am 15.02.18 16:24:48
      Beitrag Nr. 163 ()

      https://www.asx.com.au/asxpdf/20180215/pdf/43rlrsqg5zxzvn.pd…
      Matt Briggs, managing director of ABM said, “This joint venture will accelerate the potential
      for a major discovery at North Arunta.
      Schön das Herr Briggs das Potential auch sieht.
      Dabei sucht doch ABU selbst nach "major discovery".
      Significant drill intercepts from Kroda 3 include 57m@3.8g/t gold and 29m@6.4g/t gold.
      Dieses Gebiet nicht selbst zu erkunden schmerzt noch immer, aber ich wiederhole mich.
      Avatar
      schrieb am 21.02.18 10:34:15
      Beitrag Nr. 164 ()
      RIU Presentation
      https://www.asx.com.au/asxpdf/20180221/pdf/43rs3z42xc258k.pd…

      Mal schauen, ob Sie einen konstanten Newsflow halten können.
      Viel Aktivität für 2018 geplant.
      Evtl. bringen die beiden JV etwas Phantasie ins Spiel.
      Avatar
      schrieb am 09.03.18 19:50:19
      Beitrag Nr. 165 ()
      Über das North Arunta JV wurde eine Präsentation erstellt mit einem Zeitplan für die anstehenden
      Arbeiten:

      und der Link dazu
      https://www.asx.com.au/asxpdf/20180308/pdf/43s8hv5mqrq506.pd…
      Avatar
      schrieb am 13.03.18 13:33:42
      Beitrag Nr. 166 ()
      Gestern wurde im TH eine neue Kapitalaufnahme angekündigt.
      Mit der üblichen Reaktion auch bei mir.
      Kapitalaufnahme ist zwar ein notwendiges Übel bei Explorern, aber nie gern gesehen.
      Die heutige Meldung dazu hat mich dann doch überrascht:

      Der Link:
      https://www.asx.com.au/asxpdf/20180313/pdf/43sdjwq09fn829.pd…
      Kann mich nicht entsinnen, wann ich das letzte Mal einen Aufschlag gesehen habe.
      Schön zu sehen, wie andere Unternehmen aus der Branche die Lage von ABU einschätzen.
      ABM sollte gestärkt aus dieser Aktion hervorgehen - natürlich nur eine(meine) Vermutung.
      Avatar
      schrieb am 13.03.18 13:49:47
      Beitrag Nr. 167 ()
      Nach IGO der nächste Big Boy auf unserem Register:
      Avatar
      schrieb am 15.03.18 20:38:26
      Beitrag Nr. 168 ()
      Der Deal mit SBM scheint so manche Hoffnung bei den Aussis zu wecken.
      Der Chef von SBM hat ja eine beeindruckende Bilanz und nun erwarten einige,
      dass er mit dem Investment bei ABU da weiter machen wird.
      Würde mich sehr freuen, sollte es zu einer intensiveren Zusammenarbeit kommen
      und nicht nur Stiller Teilhaber.
      Buccaner/OP oder Suplejack, beides könnten lohnende Operationen für SBM werden.
      Kurs und Volumen an der ASX sollte im Auge behalten werden.
      Avatar
      schrieb am 26.03.18 09:22:14
      Beitrag Nr. 169 ()
      Bei Capstan geht es nun endlich los.


      Der Link zur Meldung:
      https://www.asx.com.au/asxpdf/20180326/pdf/43sqcqy3ppzbh2.pd…
      Avatar
      schrieb am 17.04.18 10:13:44
      Beitrag Nr. 170 ()
      Für Old Pirate ist nun endlich eine Vereinbarung getroffen worden.

      der Link :
      https://www.asx.com.au/asxpdf/20180417/pdf/43t8b31knsg64w.pd…
      Avatar
      schrieb am 18.04.18 09:06:07
      Beitrag Nr. 171 ()
      Beim North Arunta JV geht es nun auch los.


      https://www.asx.com.au/asxpdf/20180418/pdf/43t99n7k8ns98s.pd…

      Viel Aktivität in den kommenden Monaten auf den Liegenschaften,
      könnte den kleinen Aufschwung an der ASX erklären.
      Avatar
      schrieb am 30.04.18 18:49:54
      Beitrag Nr. 172 ()
      Avatar
      schrieb am 08.05.18 12:10:17
      Beitrag Nr. 173 ()
      Newcrest Mining Ltd will 12 Mio auf unserem Land für Exploration investieren, bin angenehm überrascht. So Sie es umsetzen, bekommt der Newsflow weiter Nahrung.
      Um nur mal das Potential eines Projektes zu checken, ist der Betrag recht hoch.
      Also dürften die Erwartungen von Newcrest recht hoch sein.
      Würde mich nur freuen, wenn man wüsste auf welcher Datenbasis Ihre Entscheidung beruht.
      Der Link:
      https://www.asx.com.au/asxpdf/20180508/pdf/43tvv3v8c4lqwm.pd…

      Bei der Liste unserer Projektpartner vermute ich mal, dass die Zeiten vorbei sind wo sich
      NST unser Suplejack als Schnäppchen krallen kann.
      ( Groundrush ist ja nur 20 km von Hyperion entfernt. )
      Avatar
      schrieb am 18.05.18 18:47:00
      Beitrag Nr. 174 ()
      ABM Resources ändert seinen Namen in Prodigy Gold NL.
      Ab Montag wird das Listing an der ASX unter PRX laufen.
      Die Chefetage will einen Schnitt zur Vergangenheit.
      Substantielle (gute) News aus der operativen Tätigkeit würden wohl eher dem Erscheinungsbild
      auf die Sprünge helfen, aber gut, die Weichen wurden ja neu gestellt, also hoffe ich mal, dass Sie Ihre Chance auch nutzen.
      Mit dem neuen Namen lehnen Sie sich ja recht weit aus dem Fenster.
      Avatar
      schrieb am 12.06.18 11:29:10
      Beitrag Nr. 175 ()
      Zum laufenden Bohrprogramm auf Capstan gab es eine Meldung:

      Der Link dazu:
      https://www.asx.com.au/asxpdf/20180612/pdf/43vpx75sxr66sz.pd…

      Braucht eben seine Zeit, so ein großes Gebiet einzugrenzen, frühe Tage.
      Avatar
      schrieb am 18.06.18 09:51:34
      Beitrag Nr. 176 ()
      Von unserem North-Arunta JV meldet Gladiator Resources zum aktuellen Stand der Dinge:
      Link: https://www.asx.com.au/asxpdf/20180618/pdf/43vv4qhtrwshlh.pd…
      Was schon mal hinhören lässt:

      "Das Projekt zeichnet sich durch eine relativ gedämpfte radiometrische Signatur von Kalium (K) aus,
      vergleichbar mit dem Gebiet der Tanami-Gold-Systeme 200 km nach Westen.
      Im Lennon-Projekt gibt es eine große geochemische Anomalie von 7 x 3 km Au (Cu-Mo).
      Lennon wird jetzt als wichtiges Explorationsziel eingestuft."

      "Das North Arunta-Projekt könnte nicht nur für Goldsysteme ähnlich denen in der Nähe von Granite-Tanami Orogen sondern auch für Entdeckung von bisher unbekannten Einlagen, einschließlich:
      o Mesozones bis hochstufiges epizonales Intrusion-bezogenes Goldsystem, insbesondere am
      Kroda Ziel.
      o Porphyr Cu (± Au, Mo), insbesondere bei Lennon und im weiteren Tulsa-Gebiet.
      o Hochsulfidierte epithermale Au-Ag-Cu, insbesondere bei Walddronen.
      • Eine historische Exploration, die im North Arunta-Projekt durchgeführt wurden, scheinen wenig
      oder keine Aufmerksamkeit auf die Metallogenese des Projektgebietes oder die Explorationsimplikationen von alternativen Mineralablagerungen gelegt zu haben."

      Auch wenn Gladiator wohl der ideale Partner für dieses Gebiet ist,
      hätte es mir besser gefallen, wir würden es selbst erkunden.
      Avatar
      schrieb am 04.07.18 13:17:22
      Beitrag Nr. 177 ()
      Farm - in Agreement with Newcrest Mining signed
      Somit haben wir den nächsten potenten JV Partner an Bord.
      Die anvisierten 12 Mio. von Newcrest ist mal eine Ansage.

      https://www.asx.com.au/asxpdf/20180704/pdf/43w8sd8hlpxd0n.pd…

      Avatar
      schrieb am 09.07.18 11:05:59
      Beitrag Nr. 178 ()
      PRX hat ein update zu Capstan gebracht.
      Das reduzieren der Abstände zwischen den Bohrungen von 1200m x 160m auf
      320m x 80m wird zeigen, was der Boden wert ist.
      Dieser Schritt war angekündigt und erwartet.
      https://www.asx.com.au/asxpdf/20180709/pdf/43wcymjjjgstql.pd…
      Avatar
      schrieb am 17.07.18 09:16:00
      Beitrag Nr. 179 ()
      Gladiator meldet die ersten Ergebnisse vom JV.

      Hoffentlich brauchen die Genehmigungen nicht zu lange, dass Sie die Bohrer in Position bringen können.
      https://www.asx.com.au/asxpdf/20180717/pdf/43wkqwwndpngv0.pd…
      Avatar
      schrieb am 26.07.18 14:08:11
      Beitrag Nr. 180 ()
      IGO hat eine Info zu den laufenden Arbeiten am Lake Mackay gebracht.

      Bei der Größe dieser Liegenschaft Field work typisch, alles dauert gefühlt ewig und die ausstehenden Genehmigungen erinnern einen unwillkürlich an good old Germany.
      https://www.asx.com.au/asxpdf/20180726/pdf/43wsd0kd3zywq4.pd…
      Avatar
      schrieb am 31.07.18 17:57:25
      Beitrag Nr. 181 ()
      Avatar
      schrieb am 02.08.18 09:30:37
      Beitrag Nr. 182 ()
      Capstan Infill soll im Laufe des August durch sein und DD folgen.
      Auf dem 4,5 km langen Trend die richtigen Punkte für die Rigs zu finden ist die Aufgabe der Stunde.
      Das Infill Programm war ja dazu aufgelegt, die richtigen Stellen ausfindig zu machen.

      der Link
      https://www.asx.com.au/asxpdf/20180802/pdf/43x0wjrp6598bg.pd…
      Avatar
      schrieb am 06.08.18 10:29:24
      Beitrag Nr. 183 ()
      Die neue Präsentation zeigt sehr gut die Veränderung der Firma, die vielen Projekte werden endlich bearbeitet (JV):


      Was in diesem Jahr noch zu erwarten ist:


      der Link
      https://www.asx.com.au/asxpdf/20180806/pdf/43x39xm5fb1dq3.pd…
      Avatar
      schrieb am 20.08.18 16:01:28
      Beitrag Nr. 184 ()
      Meldung über den Beginn der DD Bohrungen, mögen die DD Löcher den richtigen Weg für die RC Bohrungen weisen und keine unnötigen Rätsel aufwerfen.

      der Link
      https://www.asx.com.au/asxpdf/20180820/pdf/43xgqthy9syhwd.pd…
      Avatar
      schrieb am 25.10.18 14:58:33
      Beitrag Nr. 185 ()
      IGO macht am Lake Mackay im großflächig weiter, die Aufklärungsarbeiten von 2018, vor allem die mit den Flugzeugen hat sich gelohnt und einige neue Ziele geliefert. 2019 könnte es dort wieder interessant werden.


      https://www.asx.com.au/asxpdf/20181025/pdf/43zlktwj7kv7d5.pd…
      Avatar
      schrieb am 25.01.19 17:01:33
      Beitrag Nr. 186 ()
      https://wcsecure.weblink.com.au/pdf/PRX/02068192.pdf

      nette Zahlen für die ersten Bohrlöcher, gerne weiter so
      Avatar
      schrieb am 21.02.19 17:12:49
      Beitrag Nr. 187 ()
      Antwort auf Beitrag Nr.: 59.712.765 von grenzwall am 25.01.19 17:01:33Hey, klingt eigentlich alles super interessant, aber warum ist die Company seit 2015 im Sinkflug, trotz der aussichtsreichen Projekte und Partner?
      1 Antwort
      Avatar
      schrieb am 27.02.19 17:54:36
      Beitrag Nr. 188 ()
      Antwort auf Beitrag Nr.: 59.934.389 von Wolf1966 am 21.02.19 17:12:49Mit ABM haben viele lernen müssen, dass im Aussiland auch genügend Hallodri´s unterwegs sind.
      Die alten Großaktionäre versuchten die Firma an die Wand zu fahren und über eine Kapitalaufnahme zum Minipreis mit maximaler Verdünnung die Mehrheit zu übernehmen.
      Mit 1 Mio/A$ hätten Sie 90% der Aktien kontrolliert, nur die Aussi-Kleinaktionäre haben das verhindert.
      Selbst mit der reduzierten Oz Resource von OP hätten Sie Geld machen können, mit passablem Aufwand. Geschichte
      Mit den neuen JV Partnern/Anteilseignern hat sich die Situation geändert.
      Es wird viel Geld in diverse Projekte gesteckt.
      Nur braucht es wie immer viel Zeit und Glück bis substantielle Lagerstätten gefunden und nachgewiesen sind.
      Das hohe Risiko (mal von der Firmenleitung abgesehen) hast Du ja hier an mehreren Fronten.
      * gefunden kann nur werden, wenn auch was da ist, es winkt ja nicht überall ein Eisenhut
      * Genehmigungen sind auch in Down Under für jede Kleinigkeit notwendig wie zeitaufwendig
      * bist Du deine Proben im Labor hast und vor allem von dort zurück, ein langer Weg
      Die Labore sollen derzeit bis zu 2000 Proben vor sich her schieben, Fachkräftemangel mal real.
      Die großen Jung´s mit denen PRX im JV ist könnten hier zum game changer werden.

      IGO meldete gerade:
      https://www.asx.com.au/asxpdf/20190220/pdf/442s495sfk34fj.pd…



      Schnelle Rendite ist wohl eher nicht angesagt.
      Aber ganz abschreiben würde ich Sie nicht, wem das zu heiß ist - erst mal Watchlist.
      Nur mal so zur Aufmunterung:
      Nach meinem Einstieg bei GOR ging es wie meist steil bergab.
      Auf hotcopper hieß es nur noch "egal wieviel Sie auch finden, da draußen kein Strom keine Straße
      NIE, NIE, NIE wird das was".
      Ein Bohrloch mit der richtigen Länge reichte aus und aus tiefster Nacht war strahlender Sonnenschein geworden.


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.
      ABM Resources - bereitet sich auf Produktionsstart vor