    VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 14, 2014) - Trevali Mining Corporation ("Trevali" or the "Company") (TSX:TV)(OTCQX:TREVF)(LMA:TV)(FRANKFURT:4TI) reports preliminary production results for its first quarter 2014, ended March 31, 2014, of approximately 14.6 million payable pounds of zinc, 5.4 million payable pounds of lead and 268,600 payable ounces of silver from the Santander Mine in Peru.

    Average recoveries for the inaugural commercial production quarter were 87% for zinc, 86% for lead and 74% for silver reflecting ongoing optimization and improvements over Q4-2013 mill performance. Q1-2014 throughput at the 2,000-tonne-per-day-rated Santander processing complex was 173,820 tonnes, delivering a mill utilization factor of 99.8%. Average head grades of 4.76% Zn, 1.9% Pb and 1.97 oz/ton Ag were realized to produce approximately 15,640 tonnes of zinc concentrate and 4,510 tonnes of lead-silver concentrate.

    Table 1: Santander Mine production statistics

    Q1-2014 Q4-2013
    Tonnes mined 156,030 n/a1
    Tonnes milled 173,820 178,300
    Average head grades:
    Zinc
    Lead
    Silver

    4.76%
    1.90%
    1.97 oz/ton

    4.61%
    1.83%
    1.76 oz/ton
    Average recoveries:
    Zinc
    Lead
    Silver

    87%
    86%
    74%

    83%
    84%
    71%
    Concentrate produced DMT (dry metric tonnes):
    Zinc
    Lead-Silver

    15,640
    4,510

    13,800
    4,900
    Payable metal production:
    Zinc (pounds)
    Lead (pounds)
    Silver (troy ounces)
    Seite 1 von 4




    Verfasst von Marketwired
    Trevali Reports Q1-2014 Santander Mine Production VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 14, 2014) - Trevali Mining Corporation ("Trevali" or the "Company") (TSX:TV)(OTCQX:TREVF)(LMA:TV)(FRANKFURT:4TI) reports preliminary production results for its first quarter 2014, ended March 31, …