    TORONTO, ONTARIO--(Marketwired - July 30, 2014) - Barrick Gold Corporation (NYSE:ABX)(TSX:ABX) (Barrick or the company) today reported a second quarter net loss of $269 million ($0.23 per share). Adjusted net earnings of $159 million ($0.14 per share) include an impairment charge of $514 million related to the Jabal Sayid copper project. Operating cash flow and adjusted operating cash flow was $488 million.

    OPERATING HIGHLIGHTS AND GUIDANCE
    Second Quarter Revised Previous
    Gold 2014 2014 Guidance 2014 Guidance
    Production (000s of ounces) 1,485 6,000-6,500
    All-in sustaining costs ($ per ounce) 865 900-940 920-980
    Adjusted operating costs ($ per ounce) 594 580-630 590-640
    Copper
    Production (millions of pounds) 67 410-440
    C1 cash costs ($ per pound) 2.04 1.90-2.10
    TOTAL CAPITAL EXPENDITURES ($ millions) 502 2,200-2,500 2,400-2,700

    "Second quarter all-in sustaining costs of $865 per ounce in a lower production quarter clearly demonstrate our ongoing and relentless focus on company-wide cost management," said outgoing President and CEO, Jamie Sokalsky. "The commitment by our mine managers to cost reduction and capital efficiency has allowed us to lower our mid-year operating and capital cost guidance for the second year in a row."

    Anzeige 
    Handeln Sie Ihre Einschätzung zu Barrick Gold Corporation!
    Long
    14,56€
    Basispreis
    2,09
    Ask
    × 6,32
    Hebel
    Short
    18,97€
    Basispreis
    2,28
    Ask
    × 6,15
    Hebel
    Präsentiert von

    Den Basisprospekt sowie die Endgültigen Bedingungen und die Basisinformationsblätter erhalten Sie bei Klick auf das Disclaimer Dokument. Beachten Sie auch die weiteren Hinweise zu dieser Werbung.

    "Going forward, we will build on the momentum we have today," said Co-President Kelvin Dushnisky. "Barrick will continue to focus on maximizing free cash flow and risk-adjusted returns, with a more nimble and entrepreneurial structure focused on developing internal and external partnerships that reflect the original DNA of the company."

    "Barrick has some of the best assets in the gold industry and our operations are delivering strong results," added Co-President Jim Gowans. "We still see a lot of opportunities to surface additional value and improve efficiency across our portfolio as we pursue true operational excellence."

    Operational Excellence is a Top Priority

    • Reduced 2014 all-in sustaining cost (AISC) guidance to $900-$940 per ounce1 and adjusted operating cost guidance to $580-$630 per ounce1
    • Reduced 2014 capital expenditure guidance range by $200 million to $2.2-$2.5 billion from $2.4-$2.7 billion
    • Maintaining 2014 gold production guidance of 6.0-6.5 million ounces
    • Copper guidance unchanged at 410-440 million pounds and C1 cash costs of $1.90-$2.10 per pound1
    • Five cornerstone mines produced 0.896 million ounces of gold at average AISC of $730 per ounce in the second quarter; these mines are anticipated to contribute about 60 percent of total production in 2014 at average AISC of $750-$800 per ounce

    Progress on Portfolio Optimization

    • Since 2012, reduced the number of mines from 27 to 19 and divested non-core assets for proceeds in excess of $1.3 billion, the majority of which has been used to reduce debt
    • Ongoing process to further optimize the portfolio and reduce costs will focus on the delta between current and optimal performance and determine the quickest way to close this gap
    • In July 2014, reached an agreement to form a 50/50 joint venture with a local partner, Saudi Arabian Mining Company (Ma'aden), to operate the Jabal Sayid copper project and advance production from this first quartile cost operation

    Improving Financial Flexibility

    • Increasing cash flow generation through capital and operating cost reductions
    • Cash and cash equivalents of $2.5 billion at June 30, 2014
    • Operating cash flow of $488 million in the second quarter of 2014
    • $4.0 billion available under undrawn credit facility
    • $0.3 billion of debt maturing through 2015 and approximately $1 billion due through 2017

    New Executive Management Structure to Accelerate Initiatives and Foster Partnership Culture

    • Unveiled an executive management structure to respond to the distinct demands and challenges of the mining industry in today's environment
    • Structure places a greater emphasis on operational excellence, and acceleration of portfolio optimization and cost reduction initiatives, while fostering a partnership culture
    • Two Co-Presidents appointed to execute on operating plans and strategic priorities: Kelvin Dushnisky, formerly Senior Executive Vice President responsible for Corporate and Government Affairs and Chairman of African Barrick Gold plc, and Jim Gowans, formerly Executive Vice President and Chief Operating Officer
    • Emphasizes the critical importance of joint responsibility and accountability for the management of operations and Barrick's key relationships with host governments and local communities that afford the company its license to operate; the Co-Presidents are responsible for the seamless execution of both functions at all times
    • Ammar Al-Joundi, formerly Executive Vice President and Chief Financial Officer, has been promoted to Senior Executive Vice President and Chief Financial Officer, and will work with the Chairman on the development and execution of strategy
    • Darian Rich, formerly Senior Vice President, Human Resources, has been promoted to Executive Vice President, Talent Management, reflecting the critical requirement that any company seeking to be the leader in its field must attract, retain and develop exceptional people
    • Current President and Chief Executive Officer Jamie Sokalsky to step down effective September 15, 2014

    Two New Independent Directors Appointed

    • The Board of Directors has appointed Mr. J. Michael Evans, former Vice Chairman of Goldman Sachs and Mr. Brian Greenspun, former Chairman and CEO of Greenspun Media Group and a prominent Nevada business leader, to serve as independent directors on Barrick's Board. See the Appendix on page 8 for additional biographical details.

    FINANCIAL DISCUSSION

    Second quarter 2014 adjusted net earnings were $159 million ($0.14 per share)2 compared to $663 million ($0.66 per share) in the prior year period. The decrease was primarily due to lower realized gold and copper prices and lower gold and copper sales volumes. The net loss for the second quarter was $269 million ($0.23 per share) compared to a net loss of $8.56 billion ($8.55 per share) in the prior year quarter.

    Significant adjusting items for the quarter include:

    • $514 million impairment charge relating to the Jabal Sayid project, consisting of goodwill and asset impairment charges of $316 million and $198 million, respectively
    • $34 million in unrealized gains on non-hedge derivative instruments
    • $24 million in gains on sale of assets
    • $31 million in unrealized foreign currency translation losses

    Second quarter operating cash flow of $488 million compares to $907 million in the prior year period. The decrease primarily reflects lower gross margin. Adjusted operating cash flow of $488 million2 compares to $815 million in the prior year period.

    GOLDRUSH AND OTHER OPPORTUNITIES IN NEVADA

    Barrick continues to focus its exploration and growth efforts on Nevada. It is one of the most stable jurisdictions in the world and the company has a strong track record of proving up reserves in the region. Approximately 50 percent of Barrick's 2014 exploration budget3 is allocated to Nevada with a large majority to be used to advance Goldrush, the only significant green-field discovery by a major gold producer in the past five years. Beyond Goldrush, Barrick has several other growth opportunities and projects in Nevada near its top tier mines, including Cortez and Goldstrike, with the potential to exceed company risk-adjusted return hurdles.

    The Goldrush project is located about six kilometers from the Cortez mine. It is currently in the pre-feasibility stage and the study remains on schedule for completion in mid-2015. The company is evaluating a number of development options, including underground mining or a combination of underground and open pit mining. Infill drilling is confirming continuity of high grade mineralization and supporting an underground mining scenario. During the second quarter, Barrick submitted a permit application for an exploration decline, which will help to better define the existing resource and allow the company to test for additional mineralization beyond the northern end of the deposit.

    At Cortez, drilling in the Lower Zone is in the final stages of a program to upgrade and expand the resources. The Lower Zone is characterized by strong and continuous ore zones. A pre-feasibility study to evaluate deeper mining below the currently permitted level is expected to be completed by late 2015. Below this level, the Lower Zone is mostly oxide and higher grade than the zones above. Drilling has yet to determine the limits of the Lower Zone and recent drilling results have met or exceeded expectations. Based on these results, the Lower Zone exploration drift will be extended another 500 feet to the south in early 2015 to enable further step-out drilling.

    During the second quarter, an Environmental Impact Assessment and Plan of Operations were approved for the 60-percent owned South Arturo project, another near-mine discovery which is located approximately eight kilometers northwest of Goldstrike. South Arturo has 1.7 million ounces4 in reserves, 2.4 million ounces4 of measured and indicated resources and 0.4 million ounces4 of inferred resources (100 percent basis). Barrick plans to start development in late 2015 and mine the high grade, high return portion of the resource (approximately 0.44 million ounces on a 100 percent basis) in 2016 and 2017. The bulk of the ore will be processed through Goldstrike's refractory facilities. Due to its high grade, near surface nature, the project is expected to have lower capital development and operating costs than Goldstrike.

    Turquoise Ridge contains over 6.7 million ounces (100 percent basis) in reserves at an average grade of 0.51 ounces per ton, and is the highest reserve grade deposit in the company's operating portfolio. The operation is currently restricted by haulage and ventilation constraints. One option being considered is an additional shaft to reduce haulage distances. This could increase production by 75 percent for five to eight years. A pre-feasibility study on this scenario is expected to be completed in late 2014.

    PASCUA-LAMA RAMP-DOWN COMPLETE

    During the fourth quarter of 2013, Barrick announced the temporary suspension of construction at Pascua-Lama, except for activities required for environmental and regulatory compliance. The ramp-down process has been completed on schedule and budget and the mine is now on care and maintenance. The company expects to incur costs of approximately $300 million5 this year, in-line with original guidance, related to the ramp-down, care and maintenance activities and social and environmental obligations.

    A decision to restart development will depend on improved economics and reduced uncertainty related to legal and regulatory requirements. To improve execution and cost control, remaining development will take place in distinct stages with specific work programs and budgets. Barrick continues to explore opportunities to improve the project's risk-adjusted returns, including strategic partnerships or royalty and other income streaming agreements.

    During the second quarter, Barrick signed a Memorandum of Understanding (MoU) with a group of 15 Diaguita indigenous communities and associations in Chile's Huasco province. The MoU marks a first step in establishing dialogue and working to build trust with members of this important stakeholder group. As part of the MoU, Barrick will make technical and environmental information about the Pascua-Lama project available to the communities and provide financial resources and materials required to support analysis of this information.

    OPERATING RESULTS DISCUSSION

    Cortez

    The Cortez mine produced 0.22 million ounces at AISC of $754 per ounce in the second quarter. Production was impacted by negative grade reconciliations from mining in the GAP area; however, this shortfall is expected to be partially recovered in the second half of the year with a contribution of higher grade ounces from the Cortez Hills open pit. As a result, 2014 production is expected to be at the low end of the guidance range of 0.925-0.975 million ounces and AISC are expected to be at the high end of the range of $750-$780 per ounce.

    Goldstrike

    Goldstrike produced 0.21 million ounces in the second quarter at AISC of $886 per ounce. Costs benefited from higher than expected production on higher grades and recoveries from the open pit operation, and lower capital stripping related to ongoing optimization of the mine plan. The autoclave facility is undergoing modifications that will enable Goldstrike to accelerate the cash flow from about 4.0 million stockpiled ounces through the addition of a patented thiosulfate process. The modified autoclaves are forecast to contribute an average of 0.350-0.450 million ounces of annual production at a similar AISC to the overall operation in the first full five years following implementation of this process. First production is on track for the fourth quarter of 2014. Production at Goldstrike for 2014 is expected to be at the high end of the guidance range of 0.865-0.915 million ounces and AISC at the low end of the range of $920-$950 per ounce. In 2015, production is expected to exceed 1.0 million ounces6 with contributions from the modified autoclaves.

    Pueblo Viejo

    Barrick's 60 percent share of production from Pueblo Viejo in the second quarter was 0.16 million ounces at AISC of $587 per ounce. The autoclaves have achieved targeted and sustainable run rates but will undergo some planned downtime related to scheduled maintenance in the second half of the year. Production for 2014 is expected to be in the range of 0.600-0.700 million ounces and AISC to be at the high end of the range of $510-$610 per ounce as a result of higher sustaining capital expenditures, primarily due to an increase in capitalized stripping costs.

    Lagunas Norte

    Lagunas Norte produced 0.12 million ounces at AISC of $593 per ounce in the second quarter. Production was impacted by a construction delay on the new Phase 5 area of the leach pad, which resulted in ore being placed at higher levels of the existing leach pad. Higher grades are anticipated in the second half of the year, as well as faster recoveries from the new leach pad area which is expected to be in operation in the third quarter. Production for 2014 is expected to be at high end of the guidance range of 0.570-0.610 million ounces and AISC at the low end of the range of $640-$680 per ounce.

    Veladero

    The Veladero mine had a strong quarter, producing 0.19 million ounces at AISC of $740 per ounce. Costs benefited from higher silver credits in the first half of the year. AISC are expected to be higher in the second half of the year primarily due to the timing of sustaining capital expenditures and also from lower silver credits as ore will be sourced mainly from a different pit. Production in 2014 is anticipated to be at the high end of the guidance range of 0.650-0.700 million ounces and AISC at the low end of the range of $940-$990 per ounce.

    North America Portfolio

    Barrick's other North American mines consist of Bald Mountain, Round Mountain, Turquoise Ridge, Golden Sunlight, Ruby Hill and Hemlo. This segment produced 0.21 million ounces in the second quarter at AISC of $973 per ounce and is anticipated to produce 0.795-0.845 million ounces in 2014 at the low end of the AISC guidance range of $1,075-$1,100 per ounce.

    Australia Pacific

    Australia Pacific produced 0.27 million ounces at AISC of $856 per ounce in the second quarter. The Porgera mine contributed 0.12 million ounces at AISC of $959 per ounce. The KCGM and Cowal operations contributed strong results on higher grades and recoveries, and higher throughput, respectively. Production for Australia Pacific in 2014 is forecast at the high end of the guidance range of 1.000-1.080 million ounces and AISC at the low end of the range of $1,050-$1,100 per ounce.

    African Barrick Gold (ABG)

    Second quarter attributable production from ABG was 0.11 million ounces at AISC of $1,105 per ounce, demonstrating continued operational improvements. Barrick's share of 2014 production from ABG is anticipated to be above the high end of the guidance range of 0.430-0.460 million ounces and AISC at the low end of the range of $1,100-$1,175 per ounce.

    Global Copper

    Copper production in the second quarter was 67 million pounds at C1 cash costs of $2.04 per pound. Lumwana contributed 12 million pounds at C1 cash costs of $2.49 per pound, reflecting a partial collapse of the main conveyor in mid-April which suspended processing activities. The conveyor was repaired and normal plant operations resumed in July, ahead of schedule. The Zaldívar mine produced 55 million pounds in the second quarter at C1 cash costs of $1.83 per pound.

    Copper guidance for 2014 continues to be expected at 410-440 million pounds and C1 cash costs of $1.90-$2.10 per pound.

    In July, Barrick reached an agreement to form a joint venture with Saudi Arabian Mining Company (Ma'aden) to operate the Jabal Sayid copper project. The transaction is expected to close in the fourth quarter of 2014. First production is expected in late 2015 with average annual output of 100-130 million pounds of copper in concentrate at first quartile C1 cash costs during its first full five years of operation.

    APPENDIX - Board Appointment Details

    Mr. J. Michael Evans, New York, New York

    J. Michael Evans served as Vice Chairman of Goldman Sachs from February 2008 until his retirement in December 2013. Mr. Evans was chairman of the firm's Asia operations from 2004 to 2013 and was the global head of Growth Markets from January 2011 to December 2013. He joined Goldman Sachs in 1993 and held various leadership positions within the firm's securities business, including global head of equity capital markets. Mr. Evans is also a nominee to the Board of Directors of Alibaba Group Holding Ltd., the board of which will be established in conjunction with the company's initial public offering. He was born in Toronto, Canada and received a bachelor's degree in politics from Princeton University in 1981. Mr. Evans won a gold medal for Canada at the 1984 summer Olympics in men's eight rowing.

    Mr. Brian Greenspun, Las Vegas, Nevada

    Brian Greenspun is a prominent Nevada businessman with strong relationships across the state's business and political community. As Chairman and CEO of the Greenspun Media Group from 1989 to 2010, he built a small family newspaper business into a diversified group of companies spanning publishing, cable television, internet and real estate. He is also Publisher and Editor of the Las Vegas Sun and an active supporter of youth programs and public education in Nevada. Mr. Greenspun was appointed by President Bill Clinton to the White House Commission on Small Business in the early 1990s. He was also a member of the Board of Directors of the Tribune Company from 2009 to 2012. Mr. Greenspun holds both a B.A. and a Law degree from Georgetown University.

    1 All-in sustaining costs per ounce, adjusted operating costs per ounce, and C1 cash costs per pound are non-GAAP financial performance measures with no standardized definition under IFRS. See pages 46-51 of Barrick's Second Quarter 2014 Report.

    2 Adjusted net earnings, adjusted net earnings per share and adjusted operating cash flow are non-GAAP financial performance measures with no standardized definition under IFRS. See pages 46-51 of Barrick's Second Quarter 2014 Report.

    3 Barrick's exploration programs are designed and conducted under the supervision of Robert Krcmarov, Senior Vice President, Global Exploration of Barrick.

    4 For a breakdown of reserves and resources by category and additional information relating to reserves and resources, see pages 27-37 of Barrick's 2013 Form 40-F.

    5 About 25 percent is expected to be capitalized. Actual expenditures will be dependent on a number of factors, including environmental and regulatory requirements.

    6 Actual results may vary depending on how the ramp-up of the thiosulfate project progresses.

    Key Statistics
    Barrick Gold Corporation Three months ended Six months ended
    (in United States dollars) June 30, June 30,
    2014 2013 2014 2013
    Operating Results
    Gold production (thousands of ounces)1 1,485 1,811 3,073 3,608
    Gold sold (thousands of ounces)1 1,516 1,815 3,134 3,562
    Per ounce data
    Average spot gold price $ 1,288 $ 1,415 $ 1,291 $ 1,523
    Average realized gold price2 1,289 1,411 1,287 1,518
    Adjusted operating costs2 594 552 588 558
    All-in sustaining costs2 865 910 849 922
    All-in costs2 945 1,267 940 1,314
    Adjusted operating costs (on a co-product basis)2 615 579 610 586
    All-in sustaining costs (on a co-product basis)2 886 937 871 950
    All-in costs (on a co-product basis)2 966 1,294 962 1,342
    Copper production (millions of pounds) 67 134 171 261
    Copper sold (millions of pounds) 73 135 184 250
    Per pound data
    Average spot copper price $ 3.08 $ 3.24 $ 3.14 $ 3.42
    Average realized copper price2 3.17 3.28 3.08 3.41
    C1 cash costs2 2.04 1.75 2.08 2.08
    Depreciation3 0.37 0.42 0.37 0.38
    Other4 0.11 0.10 0.14 0.15
    C3 fully allocated costs2 2.52 2.27 2.59 2.61
    Financial Results (millions)
    Revenues $ 2,432 $ 3,201 $ 5,064 $ 6,600
    Net loss5 (269 ) (8,555 ) (181 ) (7,708 )
    Adjusted net earnings2 159 663 397 1,586
    Operating cash flow 488 907 1,073 1,992
    Adjusted operating cash flow2 488 815 1,073 1,974
    Per Share Data (dollars)
    Net loss (basic) (0.23 ) (8.55 ) (0.16 ) (7.70 )
    Adjusted net earnings (basic)2 0.14 0.66 0.34 1.58
    Net loss (diluted) (0.23 ) (8.55 ) (0.16 ) (7.70 )
    Weighted average basic common shares (millions) 1,165 1,001 1,165 1,001
    Weighted average diluted common shares (millions)6 1,165 1,001 1,165 1,001
    As at As at
    June 30, December 31,
    2014 2013
    Financial Position (millions)
    Cash and equivalents $ 2,549 $ 2,404
    Non-cash working capital 3,492 3,060
    1 Production includes African Barrick Gold ("ABG") on a 73.9% basis until February 28, 2014 and a 63.9% basis thereafter and Pueblo Viejo on a 60% basis, both of which reflect our equity share of production. Also includes production from Yilgarn South up to September 30, 2013, Plutonic up to January 31, 2014, Kanowna up to March 1, 2014 and Marigold up to April 4, 2014, the effective dates of sale of these assets. Sales include our equity share of gold sales from ABG and Pueblo Viejo.
    2 Realized price, adjusted operating costs, all-in sustaining costs, all-in costs, adjusted operating costs (on a co-product basis), all-in sustaining costs (on a co-product basis), all-in costs (on a co-product basis), C1 cash costs, C3 fully allocated costs, adjusted net earnings and adjusted operating cash flow are non-gaap financial performance measures with no standard definition under IFRS. Refer to the Non-GAAP Financial Performance Measures section of the Company's MD&A.
    3 Represents equity depreciation expense divided by equity pounds of copper sold.
    4 For a breakdown, see reconciliation of cost of sales to C1 cash costs and C3 fully allocated costs per pound in the Non-GAAP Financial Performance Measures section of the Company's MD&A.
    5 Net loss represents net loss attributable to the equity holders of the Company.
    6 Fully diluted includes dilutive effect of stock options.
    Production and Cost Summary
    Gold Production (attributable ounces) (000's) All-in sustaining costs5 ($/oz)
    Three months ended Six months ended Three months ended Six months ended
    June 30, June 30, June 30, June 30,
    2014 2013 2014 2013 2014 2013 2014 2013
    Gold
    Goldstrike 214 187 476 417 $ 886 $ 1,226 $ 808 $ 994
    Cortez 217 417 444 760 754 376 706 392
    Pueblo Viejo 161 122 320 218 587 635 587 725
    Lagunas Norte 115 131 249 276 593 663 552 604
    Veladero 189 140 347 345 740 768 768 724
    North America Portfolio1 205 202 428 405 973 1,258 963 1,253
    Australia Pacific2 268 465 573 912 856 1,016 850 1,046
    African Barrick Gold3 114 122 232 230 1,105 1,404 1,118 1,483
    Other4 2 25 4 45 2,794 1,383 2,266 1,383
    Total 1,485 1,811 3,073 3,608 $ 865 $ 910 $ 849 $ 922
    Copper Production (attributable pounds) (millions) C1 Cash Costs5 ($/lb)
    Three months ended Six months ended Three months ended Six months ended
    June 30, June 30, June 30, June 30,
    2014 2013 2014 2013 2014 2013 2014 2013
    Total 67 134 171 261 $ 2.04 $ 1.75 $ 2.08 $ 2.08
    Total Gold Production Costs ($/oz)
    Three months ended Six months ended
    June 30, June 30,
    2014 2013 2014 2013
    Direct mining costs before impact of hedges at market foreign exchange rates $ 600 $ 602 $ 595 $ 608
    Gains realized on currency hedge and commodity hedge/economic hedge contracts (23 ) (42 ) (21 ) (46 )
    Other6 - (14 ) - (14 )
    By-product credits (21 ) (27 ) (22 ) (28 )
    Royalties 38 33 36 38
    Adjusted operating costs5 594 552 588 558
    Depreciation 202 210 199 203
    Other6 - 14 - 14
    Total production costs $ 796 $ 776 $ 787 $ 775
    Adjusted operating costs5 $ 594 $ 552 $ 588 $ 558
    General & administrative costs 43 35 49 41
    Rehabilitation - accretion and amortization (operating sites) 21 19 21 22
    Mine on-site exploration and evaluation costs 4 9 3 8
    Mine development expenditures 117 173 117 164
    Sustaining capital expenditures 86 122 71 129
    All-in sustaining costs5 $ 865 $ 910 $ 849 $ 922
    All-in costs5 $ 945 $ 1,267 $ 940 $ 1,314
    Total Copper Production Costs ($/lb)
    Three months ended Six months ended
    June 30, June 30,
    2014 2013 2014 2013
    C1 cash costs5 $ 2.04 $ 1.75 $ 2.08 $ 2.08
    Depreciation7 0.37 0.42 0.37 0.38
    Other8 0.11 0.10 0.14 0.15
    C3 fully allocated costs5 $ 2.52 $ 2.27 $ 2.59 $ 2.61
    1 Includes production from Marigold up to April 4, 2014, the effective date of sale of this asset.
    2 Includes production from Yilgarn South up to September 30, 2013, Plutonic up to January 31, 2014 and Kanowna up to March 1, 2014, the effective dates of sale of these assets.
    3 Figures relating to African Barrick Gold are presented on a 73.9% basis until February 28, 2014 and a 63.9% basis thereafter, which reflects our equity share of production.
    4 Production and all-in sustaining costs include Pierina.
    5 Adjusted operating costs, all-in sustaining costs, all-in costs, C1 cash costs and C3 fully allocated costs are non-GAAP financial performance measures with no standard meaning under IFRS. Refer to the Non-GAAP Financial Performance Measures section of the Company's MD&A.
    6 Represents the Barrick Energy gross margin divided by equity ounces of gold sold. Barrick Energy was divested in the third quarter of 2013.
    7 Represents equity depreciation expense divided by equity pounds of copper sold.
    8 For a breakdown, see reconciliation of cost of sales to C1 cash costs and C3 fully allocated costs per pound in the Non-GAAP Financial Performance Measures section of the Company's MD&A.
    Consolidated Statements of Income
    Barrick Gold Corporation Three months ended Six months ended
    (in millions of United States dollars, except per share data) (Unaudited) June 30, June 30,
    2014 2013 2014 2013
    Revenue (notes 5 and 6) $ 2,432 $ 3,201 $ 5,064 $ 6,600
    Costs and expenses (income)
    Cost of sales (notes 5 and 7) 1,590 1,832 3,282 3,642
    General and administrative expenses (note 11) 82 99 185 197
    Exploration and evaluation (note 8) 53 58 85 106
    Other expense (income) (note 10A) 142 148 342 237
    Impairment charges (note 10B) 512 9,327 524 9,332
    Gain on non-hedge derivatives (note 19D) (44 ) (13 ) (65 ) (55 )
    Income (loss) before finance items and income taxes 97 (8,250 ) 711 (6,859 )
    Finance items
    Finance income 3 2 6 5
    Finance costs (note 12) (200 ) (161 ) (401 ) (269 )
    (Loss) income from continuing operations before income taxes (100 ) (8,409 ) 316 (7,123 )
    Income tax (expense) recovery (note 13) (123 ) 213 (412 ) (220 )
    Loss from continuing operations (223 ) (8,196 ) (96 ) (7,343 )
    Loss from discontinued operations - (505 ) - (497 )
    Net loss $ (223 ) $ (8,701 ) $ (96 ) $ (7,840 )
    Attributable to:
    Equity holders of Barrick Gold Corporation $ (269 ) $ (8,555 ) $ (181 ) $ (7,708 )
    Non-controlling interests (note 22) $ 46 $ (146 ) $ 85 $ (132 )
    Earnings per share data attributable to the equity holders of Barrick Gold Corporation (note 9)
    Loss from continuing operations
    Basic $ (0.23 ) $ (8.04 ) $ (0.16 ) $ (7.20 )
    Diluted $ (0.23 ) $ (8.04 ) $ (0.16 ) $ (7.20 )
    Loss from discontinued operations
    Basic $ - $ (0.51 ) $ - $ (0.50 )
    Diluted $ - $ (0.51 ) $ - $ (0.50 )
    Net loss
    Basic $ (0.23 ) $ (8.55 ) $ (0.16 ) $ (7.70 )
    Diluted $ (0.23 ) $ (8.55 ) $ (0.16 ) $ (7.70 )
    The notes to these unaudited interim financial statements, which are contained in the Second Quarter Report 2014 available on our website are an integral part of these consolidated financial statements.
    Consolidated Statements of Comprehensive Income
    Barrick Gold Corporation Three months ended Six months ended
    (in millions of United States dollars) (Unaudited) June 30, June 30,
    2014 2013 2014 2013
    Net loss $ (223 ) $ (8,701 ) $ (96 ) $ (7,840 )
    Other comprehensive income (loss), net of taxes
    Items that may be reclassified subsequently to profit or loss:
    Unrealized gains (losses) on available-for-sale ("AFS") financial securities, net of tax $nil, $2, nil and $4 5 (18 ) 22 (26 )
    Realized (gains) losses and impairments on AFS financial securities, net of tax $nil, ($2), $nil and ($2) 17 13 23 11
    Unrealized gains (losses) on derivatives designated as cash flow hedges, net of tax ($3), ($12), $1 and ($15) 13 (85 ) 28 (55 )
    Realized (gains) losses on derivatives designated as cash flow hedges, net of tax $1, $23, $1 and $41 (31 ) (107 ) (54 ) (182 )
    Currency translation adjustments, net of tax $nil, $nil, $nil and $nil 4 (77 ) 7 (98 )
    Total other comprehensive income (loss) 8 (274 ) 26 (350 )
    Total comprehensive loss $ (215 ) $ (8,975 ) $ (70 ) $ (8,190 )
    Attributable to:
    Equity holders of Barrick Gold Corporation
    Continuing operations $ (261 ) $ (8,292 ) $ (155 ) $ (7,510 )
    Discontinued operations $ - $ (537 ) $ - $ (548 )
    Non-controlling interests $ 46 $ (146 ) $ 85 $ (132 )
    The notes to these unaudited interim financial statements, which are contained in the Second Quarter Report 2014 available on our website are an integral part of these consolidated financial statements.
    Consolidated Statements of Cash Flow
    Barrick Gold Corporation Three months ended Six months ended
    (in millions of United States dollars) (Unaudited) June 30, June 30,
    2014 2013 2014 2013
    OPERATING ACTIVITIES
    Net loss from continuing operations $ (223 ) $ (8,196 ) $ (96 ) $ (7,343 )
    Adjusted for the following items:
    Depreciation 400 453 802 849
    Finance costs 200 161 401 269
    Impairment charges (note 10B) 512 9,327 524 9,332
    Income tax expense (recovery) (note 13) 123 (213 ) 412 220
    (Increase) decrease in inventory (37 ) (69 ) 5 (233 )
    Proceeds from settlement of hedge contracts - 219 - 219
    Gain on non-hedge derivatives (44 ) (13 ) (65 ) (55 )
    Gain on sale of long-lived assets/investments (22 ) (1 ) (23 ) (9 )
    Other operating activities (note 14A) 16 (300 ) (225 ) (465 )
    Operating cash flows before interest and income taxes 925 1,368 1,735 2,784
    Interest paid (276 ) (170 ) (352 ) (217 )
    Income taxes paid (161 ) (306 ) (310 ) (626 )
    Net cash provided by operating activities from continuing operations 488 892 1,073 1,941
    Net cash provided by operating activities from discontinued operations - 15 - 51
    Net cash provided by operating activities 488 907 1,073 1,992
    INVESTING ACTIVITIES
    Property, plant and equipment
    Capital expenditures (note 5) (616 ) (1,552 ) (1,232 ) (2,931 )
    Sales proceeds 2 1 37 3
    Divestitures 86 - 166 -
    Investments sales 27 - 52 18
    Other investing activities (note 14B) (39 ) (46 ) (79 ) (131 )
    Net cash used in investing activities from continuing operations (540 ) (1,597 ) (1,056 ) (3,041 )
    Net cash used in investing activities from discontinued operations - (12 ) - (57 )
    Net cash used in investing activities (540 ) (1,609 ) (1,056 ) (3,098 )
    FINANCING ACTIVITIES
    Proceeds on exercise of stock options - - - 1
    Proceeds from divestment of 10% of issued ordinary share capital of ABG - - 186 -
    Debt
    Proceeds - 3,060 133 5,110
    Repayments (18 ) (2,066 ) (93 ) (3,271 )
    Dividends (58 ) (200 ) (116 ) (400 )
    Funding from non-controlling interests - 19 2 32
    Other financing activities (note 14C) - (14 ) - (22 )
    Net cash (used in) provided by financing activities from continuing operations (76 ) 799 112 1,450
    Net cash used in financing activities from discontinued operations - - - -
    Net cash (used in) provided by financing activities (76 ) 799 112 1,450
    Effect of exchange rate changes on cash and equivalents 1 (9 ) (4 ) (11 )
    Net (decrease) increase in cash and equivalents (127 ) 88 125 333
    Cash and equivalents excluding assets classified as held for sale at the beginning of period 2,672 2,342 2,404 2,097
    Add: cash and equivalents of assets classified as held for sale at the beginning of period 4 - 20 -
    Cash and equivalents at the end of period $ 2,549 $ 2,430 $ 2,549 $ 2,430
    Less: cash and equivalents of assets classified as held for sale at the end of period - 8 - 8
    Cash and equivalents excluding assets classified as held for sale at the end of period $ 2,549 $ 2,422 $ 2,549 $ 2,422
    The notes to these unaudited interim financial statements, which are contained in the Second Quarter Report 2014 available on our website are an integral part of these consolidated financial statements.
    Consolidated Balance Sheets
    Barrick Gold Corporation
    (in millions of United States dollars) (Unaudited) As at June 30, As at December 31,
    2014 2013
    ASSETS
    Current assets
    Cash and equivalents (note 19A) $ 2,549 $ 2,404
    Accounts receivable 377 385
    Inventories (note 15) 2,644 2,679
    Other current assets 386 421
    Total current assets (excluding assets classified as held for sale) 5,956 5,889
    Assets classified as held for sale 578 323
    Total current assets 6,534 6,212
    Non-current assets
    Equity in investees 28 27
    Other investments 103 120
    Property, plant and equipment (note 16) 21,377 21,688
    Goodwill (note 17) 5,519 5,835
    Intangible assets 311 320
    Deferred income tax assets 774 501
    Non-current portion of inventory (note 15) 1,704 1,679
    Other assets 1,085 1,066
    Total assets $ 37,435 $ 37,448
    LIABILITIES AND EQUITY
    Current liabilities
    Accounts payable $ 1,659 $ 2,165
    Debt (note 19B) 187 179
    Current income tax liabilities 105 75
    Other current liabilities 306 303
    Total current liabilities (excluding liabilities classified as held for sale) 2,257 2,722
    Liabilities classified as held for sale 18 162
    Total current liabilities 2,275 2,884
    Non-current liabilities
    Debt (note 19B) 12,973 12,901
    Provisions 2,594 2,428
    Deferred income tax liabilities 2,546 2,258
    Other liabilities 1,053 976
    Total liabilities 21,441 21,447
    Equity
    Capital stock (note 21) 20,862 20,869
    Deficit (7,878 ) (7,581 )
    Accumulated other comprehensive loss (43 ) (69 )
    Other 321 314
    Total equity attributable to Barrick Gold Corporation shareholders 13,262 13,533
    Non-controlling interests (note 22) 2,732 2,468
    Total equity 15,994 16,001
    Contingencies and commitments (notes 15, 16 and 23)
    Total liabilities and equity $ 37,435 $ 37,448
    The notes to these unaudited interim financial statements, which are contained in the Second Quarter Report 2014 available on our website are an integral part of these consolidated financial statements.
    Consolidated Statements of Changes in Equity
    Barrick Gold Corporation Attributable to equity holders of the company
    (in millions of United States dollars) (Unaudited) Common Shares (in thousands) Capital stock Retained earnings (deficit) Accumulated other comprehensive income (loss)1 Other2 Total equity attributable to shareholders Non-controlling interests Total equity
    At January 1, 2014 1,164,652 $ 20,869 $ (7,581 ) $ (69 ) $ 314 $ 13,533 $ 2,468 $ 16,001
    Net (loss) income - - (181 ) - - (181 ) 85 (96 )
    Total other comprehensive income - - - 26 - 26 - 26
    Total comprehensive (loss) income - - (181 ) 26 - (155 ) 85 (70 )
    Transactions with owners
    Dividends - - (116 ) - - (116 ) - (116 )
    Issued on exercise of stock options 18 - - - - - - -
    Derecognition of stock option expense - (7 ) - - - (7 ) - (7 )
    Recognized on divestment of 10% of African Barrick Gold - - - - 7 7 177 184
    Funding from non-controlling interests - - - - - - 2 2
    Total transactions with owners 18 (7 ) (116 ) - 7 (116 ) 179 63
    At June 30, 2014 1,164,670 $ 20,862 $ (7,878 ) $ (43 ) $ 321 $ 13,262 $ 2,732 $ 15,994
    At January 1, 2013 1,001,108 $ 17,926 $ 3,269 $ 463 $ 314 $ 21,972 $ 2,664 $ 24,636
    Net loss - - (7,708 ) - - (7,708 ) (132 ) (7,840 )
    Total other comprehensive loss - - - (350 ) - (350 ) - (350 )
    Total comprehensive loss - - (7,708 ) (350 ) - (8,058 ) (132 ) (8,190 )
    Transactions with owners
    Dividends - - (400 ) - - (400 ) - (400 )
    Issued on exercise of stock options 44 1 - - - 1 - 1
    Recognition of stock option expense - 6 - - - 6 - 6
    Funding from non-controlling interests - - - - - - 32 32
    Other decrease in non-controlling interests - - - - - - (14 ) (14 )
    Total transactions with owners 44 7 (400 ) - - (393 ) 18 (375 )
    At June 30, 2013 1,001,152 $ 17,933 $ (4,839 ) $ 113 $ 314 $ 13,521 $ 2,550 $ 16,071
    1 Includes cumulative translation losses at June 30, 2014: $73 million (June 30, 2013: losses of $85 million).
    2 Includes additional paid-in capital as at June 30, 2014: $283 million (December 31, 2013: $276 million; June 30, 2013: $276 million) and convertible borrowings - equity component as at June 30, 2014: $38 million (December 31, 2013: $38 million; June 30, 2013: $38 million).
    The notes to these unaudited interim financial statements, which are contained in the Second Quarter Report 2014 available on our website are an integral part of these consolidated financial statements.
    CORPORATE OFFICE TRANSFER AGENTS AND REGISTRARS
    Barrick Gold Corporation CST Trust Company
    Brookfield Place, TD Canada Trust Tower P.O. Box 700, Postal Station B
    Suite 3700 Montreal, Quebec, Canada H3B 3K3
    161 Bay Street, P.O. Box 212 or
    Toronto, Canada M5J 2S1 American Stock Transfer & Trust Company, LLC
    Tel: (416) 861-9911 Fax: (416) 861-0727 6201 - 15 Avenue
    Toll-free throughout North America: 1-800-720-7415 Brooklyn, NY 11219
    Email: investor@barrick.com Tel: 1-800-387-0825
    Website: www.barrick.com Toll-free throughout North America
    Fax: 1-888-249-6189
    SHARES LISTED Email: inquiries@canstockta.com
    ABX - The New York Stock Exchange Website: www.canstockta.com
    The Toronto Stock Exchange

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

    Certain information contained or incorporated by reference in this Second Quarter Report 2014, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes "forward-looking statements". All statements, other than statements of historical fact, are forward-looking statements. The words "believe", "expect", "anticipate", "contemplate", "target", "plan", "intend", "continue", "budget", "estimate", "may", "will", "schedule" and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the company, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold, copper or certain other commodities (such as silver, diesel fuel and electricity); changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices, expropriation or nationalization of property and political or economic developments in Canada, the United States and other jurisdictions in which the Company does or may carry on business in the future; failure to comply with environmental and health and safety laws and regulations; timing of receipt of, or failure to comply with, necessary permits and approvals; diminishing quantities or grades of reserves; increased costs, delays, suspensions and technical challenges associated with the construction of capital projects; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; adverse changes in our credit rating;
    the impact of inflation; operating or technical difficulties in connection with mining or development activities; the speculative nature of mineral exploration and development; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; fluctuations in the currency markets; changes in U.S. dollar interest rates; risks arising from holding derivative instruments; litigation; contests over title to properties, particularly title to undeveloped properties, or over access to water, power and other required infrastructure; business opportunities that may be presented to, or pursued by, the company; our ability to successfully integrate acquisitions or complete divestitures; employee relations; availability and increased costs associated with mining inputs and labor; and the organization of our previously held African gold operations and properties under a separate listed company. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks). Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this Second Quarter Report 2014 are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities for a discussion of some of the factors underlying forward-looking statements.

    The company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

    INVESTOR CONTACT: Amy Schwalm
    Vice President, Investor Relations
    (416) 307-7422
    aschwalm@barrick.com

    MEDIA CONTACT: Andy Lloyd
    Vice President, Communications
    (416) 307-7414
    alloyd@barrick.com


    Diskutieren Sie über die enthaltenen Werte



    Verfasst von Marketwired
    Barrick Reports Second Quarter 2014 Results TORONTO, ONTARIO--(Marketwired - July 30, 2014) - Barrick Gold Corporation (NYSE:ABX)(TSX:ABX) (Barrick or the company) today reported a second quarter net loss of $269 million ($0.23 per share). Adjusted net earnings of $159 million ($0.14 per …

    Schreibe Deinen Kommentar

    Disclaimer