    Key events

    H1 2015

    • Following the bankruptcy of Talvivaara Sotkamo Ltd ("Talvivaara Sotkamo") on 6 November 2014, trading of Talvivaara Mining Company Plc's ("Talvivaara" or the "Company") shares on the Helsinki Stock Exchange was suspended. The suspension of trading continues on the date of publication of the Company's H1 2015 interim results on 27 August 2015
    • This interim report has been prepared on a basis other than going concern. The chosen reporting basis results from the existence of material uncertainty that casts significant doubt upon the Company's ability to realise its assets and discharge its liabilities in the normal course of business and from the lack of visibility on the Company's operational environment twelve months beyond the date of reporting
    • Talvivaara has continued to finance its operations by providing administrative and technical services and by leasing certain critical machinery and equipment to the bankruptcy estate of Talvivaara Sotkamo under agreements entered into by the Company and the bankruptcy estate on 19 November 2014. The other operating income from those activities amounted to EUR 3.4 million
    • The creditors' voting procedure was completed on 6 May 2015 and the Administrator's draft restructuring programme was supported by approximately 97.5 percent of the creditors of unsecured debt participating in the voting. The requisite support from the creditors set forth in the Restructuring of Enterprises Act for the approval of the draft restructuring programme was obtained. The confirmation and entry into force of the draft restructuring programme still requires the fulfilment of certain other conditions
    • Talvivaara's negotiations with the state of Finland and potential financiers and investors continue, with the target of securing  a participation in the mining operations
    • The Annual General Meeting of the Company held on 25 June 2015 authorised the Board of Directors to resolve on the share issue of up to 4,500,000,000 new shares in aggregate in deviation from the pre-emptive subscription rights of the shareholders through one or several share issues to conduct the conversion of the unsecured restructuring debts into new shares in the Company as provided by the Administrator's draft restructuring programme. The subscription price of the shares to be issued by virtue of the authorisation shall be EUR 0.1144 per share and the subscription price shall be paid by setting off the subscriber's unsecured restructuring debt claim
    • Reported operating loss EUR -0.5 million

    Events after the reporting period

    • Talvivaara has signed a contract on 13 August 2015 with the state-owned company Terrafame Oy and its 100% subsidiary Terrafame Mining Oy, whereby Terrafame Mining Oy assumes the rights and obligations of the bankruptcy estate of Talvivaara Sotkamo under the agreements of 19 November 2014 on provision of administrative and technical services and leasing of certain critical machinery and equipment to the bankruptcy estate
    • The transfer of the mining business from the bankruptcy estate of Talvivaara Sotkamo to Terrafame Mining Oy was completed on 14 August 2015

        

    Talvivaara Mining Company Plc        
    Key financial figures        
        Six
    months to
    30 Jun 15
    Six
    months to
    30 Jun 14
    Twelve
    months to
    31 Dec 14
    Other operating income EUR '000 3,437 7,126 12,340
    Operating profit/loss EUR '000 (491) 1,334 (702,649)
    Operating profit/loss percentage   (14.3 %) 18.7 % (5,694.1 %)
    Profit/loss before tax EUR '000 (14,978) 7,856 (774,899)
    Profit/loss for the period EUR '000 (14,978) 7,856 (774,899)
    Return on equity   N/A N/A N/A
    Equity-to-assets ratio   (7,392.8 %) 10.3 % (6480.9 %)
    Net interest-bearing debt EUR '000 499,523 424,646 495,374
    Debt-to-equity ratio   (67.1 %) 820.1 % (67.9 %
    Return on investment   N/A N/A (558.1 %)
    Capital expenditure EUR '000 0 2,316 2,717
    Property, plant and equipment EUR '000 5,000 8,526 5,011
    Borrowings EUR '000 503,956 425,030 500,720
    Cash and cash equivalents EUR '000 4,433 384 5,346

    All reported half-yearly figures in this release are unaudited. Full year figures are audited.

    CEO Pekka Perä comments: "When the unsecured creditors approved the draft restructuring programme, an important milestone was achieved. Although there are still significant challenges ahead, it was a major tick in the box in this prolonged restructuring process. As we have received continuous support from the shareholders and the creditors, the weakness in the commodities market is still effecting on the mining finance space as a whole. A good sign is that some investors are getting active with the view that the bottom has been found in the base metals market.

    The operational result of the Company was in loss as anticipated, but as the restructuring costs will decrease, it is expected that the cash position will remain roughly on the same as level as at the end of the period for the next months to come or until a solution for the Company's future has been found.

    The management and the staff have been working hard despite all the uncertainties around the Company. The transfer of the leasing and services contract to Terrafame provides visibility for the personnel in the short term.

    I would like to thank departing board members Mr. Edward Haslam, Mr. Graham Titcombe and Mrs. Maija-Liisa Friman for their efforts. Their experience, skills, commitment, strength of character and sense of humour will be deeply missed."

    Enquiries:

    Talvivaara Mining Company Plc Tel. +358 20 712 9800
    Pekka Perä, CEO
    Pekka Erkinheimo, Deputy CEO

    Financial review

    Introduction
    Following the bankruptcy of Talvivaara Mining Company Plc's ("Talvivaara" or the "Company") operating subsidiary Talvivaara Sotkamo Ltd ("Talvivaara Sotkamo") on 6 November 2014, trading of Talvivaara's shares on the Helsinki Stock Exchange was suspended. The suspension of trading continues as at the date of the publication of the Company's H1 2015 interim results on 27 August 2015.

    This interim report has been prepared on a basis other than going concern. The chosen reporting basis results from the existence of material uncertainty that casts significant doubt upon the Company's ability to realise its assets and discharge its liabilities in the normal course of business and from the lack of visibility on the Company's operational environment twelve months beyond the date of reporting.

    Following the bankruptcy of Talvivaara Sotkamo on 6 November 2014, Talvivaara has not had control over the operations at the Sotkamo mine and is therefore no longer in a position to continue reporting on the status and development of the Sotkamo mining operations, including information on production levels and water management. Talvivaara has continued to finance its operations by providing administrative and technical services and by leasing certain critical machinery and equipment to the bankruptcy estate of Talvivaara Sotkamo and for the time being continues to pursue its target of securing sufficient financing to participate, as a member of a consortium, in the acquisition of the Sotkamo mining operations or securing a different financial and/or operative arrangement that will secure the continuance of the Company's eligible business.

    H1 2015 (January-June)

    Net sales and financial result
    The operating loss for the period was EUR (0.49) million (operating profit H1 2014: EUR 1.3 million). Earnings per share was EUR (0.02) (H1 2014: EUR 0.01).

    The loss for the period amounted to EUR (15.0) million (profit for the period H1 2014: EUR 7.9 million) based mainly on the reported finance costs of EUR (14.5) million. The finance costs include EUR 14 million of computational interest expenses accrued on the restructuring debts. The profit from the comparison period of H1 2014 included EUR 22 million of computational interest income on the debts owed by Talvivaara Sotkamo to the Company. Following the bankruptcy and public receivership of Talvivaara Sotkamo, no such interest income has been recorded for H1 2015.

    Liquidity
    As at 30 June 2015, the Company's cash and cash equivalents amounted to EUR 4.4 million (31 December 2014: EUR 5.3 million). The cash position has stayed the same or slightly improved since March 2015.

    The Company has financed its day-to-day operations by providing administrative and technical services and the lease of critical machinery and equipment to the bankruptcy estate of Talvivaara Sotkamo.

    Balance sheet
    Termination of the Zinc Streaming Agreement
    Following the termination of the Zinc Streaming Agreement by the bankruptcy estate of Talvivaara Sotkamo on 30 March 2015, Nyrstar sent a notice to the Company, reserving their right to issue a demand to the Company as a guarantor for a payment of all sums due by Talvivaara Sotkamo under the Zinc Streaming Agreement and the Streaming Holiday Agreement (including the termination sum of EUR 203.4 million), should the bankruptcy estate of Talvivaara Sotkamo fail to do so.

    Based on the Intercreditor Agreement binding on the Company and Nyrstar, the Administrator did not include the Company's guarantee liability for the termination sum in the restructuring debts or in the new liabilities arisen during the proceedings in his final draft restructuring programme. Consequently, the view of the Company and the Administrator is that the Company cannot make any payments to Nyrstar in relation to the termination sum if full payment has not been made to the Company's lenders having receivables with a higher ranked priority.

    The Company has provided the full amount as a provision on the balance sheet based on uncertainties related to the treatment of the Company's guarantee obligation. The discussions with Nyrstar on the treatment of the termination sum continue as at the date of the Company's H1 2015 interim results 27 August 2015.

    For more information on the termination sum guarantee, please refer to pages 9, 14-15, 22-23 and 31 of the Company's 2014 Financial Statements.

    Provisions and other items recognised based on restructuring programme
    The Company has issued a floating charge security for the loans drawn from Finnvera by Talvivaara Sotkamo, amounting in aggregate to EUR 58.7 million, including accrued interest. For more information, please refer to pages 23, 36, 41 and 44 of the Company's 2014 Financial Statements.

    Off-balance sheet and contingent liabilities
    Talvivaara Sotkamo has largely covered the environmental bond requirement under the current environmental permit by a guarantee insurance provided by Atradius Credit Insurance NV ("Atradius"). The coverage amounts to EUR 31.9 million as at the date of the publication of the Company's H1 2015 interim results 27 August 2015. In the event restoration of the mine site took place without Talvivaara Sotkamo carrying the cost, the expenses would initially be covered by Atradius. However, eventually Atradius would claim the cost back from the Company, which has given counter-indemnity for such costs to Atradius. The guaranteed liability is part of the Company's restructuring debt and any payments that fall due under the guarantee are finally determined in the Company's restructuring programme and repaid according to the authorized payment schedule.

    Furthermore, even if the Company's restructuring debts were cut in accordance with the Administrator's final draft restructuring programme, the assets of the Company would still be less than the aggregate amount of the Company's remaining liabilities following the 99-percent-haircut of the unsecured restructuring debts or even following a 100% conversion of the unsecured restructuring debts into equity of the Company. The exact amount of the negative funding balance will depend, among others, on the extent to which unsecured restructuring debts are converted into equity of the Company, and on the aggregate amount of the Company's other liabilities not subject to restructuring at the date of entry into force of the restructuring programme. More information on the negative equity is provided in Note 1.

    Assets
    On the statement of financial position as at 30 June 2015, property, plant and equipment totalled EUR 5.0 million (31 December 2014: EUR 5 million). Intangible assets totalled EUR 0.5 million (31 December 2014: EUR 0.56 million).

    Shares in Majakkavoima Oy and Katternö Kärnkraft Ab, companies holding shares in Fennovoima nuclear power company, continue to be valued at zero, as under the reporting basis other than going concern, the Company does not recognise any value in such holdings with a view to its current business operations.

    No investments have been made during H1 2015.

    Reporting basis - other than going concern
    This interim report has been prepared on a basis other than going concern. The chosen reporting basis results from the existence of material uncertainty that casts significant doubt upon the Company's ability to realise its assets and discharge its liabilities in the normal course of business and from the lack of visibility on the Company's operational environment twelve months beyond the date of reporting. However, the contractual arrangements regarding the administrative and technical services and the lease of critical machinery and equipment have helped the Company to discharge all of its new liabilities as and when they fell due. Therefore, the chosen reporting basis is, where applicable, reflected in the carrying amounts of the Company's assets and liabilities, but no reserve has been made in the Company's balance sheet for the costs relating to winding down of the operations.

    Talvivaara's ability to revise its reporting basis and to regain its status as a going concern is dependent, among other things, on the successful completion of the Company's corporate reorganisation proceedings, which requires among other things that (i) Talvivaara succeeds in completing an arrangement that will secure the necessary cash flow for the Company to discharge all of its liabilities and the continuance of the Company's eligible business, and (ii) the shareholders of Talvivaara approve the financial arrangement required to discharge the remaining restructuring debts and for covering other possible liabilities to the extent the Company's other funds are not sufficient for such purpose. As of the date of the Company's H1 2015 interim results 27 August 2015, there is no certainty as to whether the Company can fulfil all the set requirements within the given time frame.

    Talvivaara Sotkamo has drawn down EUR 12.8 million (including interest through October 2014), in loans from Nyrstar under the Streaming Holiday Agreement between Talvivaara, Talvivaara Sotkamo and Nyrstar. Upon the bankruptcy of Talvivaara Sotkamo, Nyrstar is entitled to declare that all or part of the loans, together with accrued interest, be payable on demand by Talvivaara Sotkamo or Talvivaara, in its capacity as the guarantor. If Nyrstar was to demand immediate repayment of the EUR 12.8 million loans guaranteed by the Company, the Company might not have sufficient cash reserves or access to additional liquidity to make the required payment.

    Furthermore, the Company has issued a guarantee for the termination sum amounting to approximately EUR 203.4 million that Talvivaara Sotkamo would have to pay to Nyrstar due to a premature termination of the Zinc Streaming Agreement between the companies. On 30 March 2015, the bankruptcy estate of Talvivaara Sotkamo notified Nyrstar that it does not commit to the Zinc Streaming Agreement or the Streaming Holiday Agreement. Consequently, on 9 April 2015 Nyrstar sent a notice to the Company, reserving their right to issue a demand to the Company as a guarantor for a payment of all sums due by Talvivaara Sotkamo under the Zinc Streaming Agreement and the Streaming Holiday Agreement, should the bankruptcy estate of Talvivaara Sotkamo fail to do so. However, based on the Intercreditor Agreements binding on the Company and Nyrstar, the Company cannot make any payments to Nyrstar in relation to the termination sum if full payment has not been made to the Company's other lenders having receivables with a higher ranking priority. As the lenders having a higher ranking priority will not receive a full payment on their receivables due to Talvivaara Sotkamo's bankruptcy and the Company's restructuring proceedings, the Company cannot make payments relating to the termination sum to Nyrstar due to the subordinate position of Nyrstar's claim. Based on the above, the Administrator did not include the Company's guarantee liability for the termination sum in the restructuring debts or in the new liabilities arisen during the proceedings in his final draft restructuring programme, which decision was not contested by Nyrstar within the given time frame. However, if Nyrstar was later to contest the treatment of the Company's guarantee liability successfully and thereby be allowed to demand payment from the Company under the guarantee, the Company would likely not have sufficient cash reserves or access to additional liquidity to make the required payment. In addition, any uncertainty surrounding the issue would have a significant negative effect on the Company's ability to raise new funds required for the successful fulfilment of the conditions for the entry into force of the Company's restructuring programme. Based on the above and on the applied non-going concern principle, the Company has provided the full amount of the guarantee liability as a provision on its balance sheet.

    Operational review
    Talvivaara's negotiations with the state of Finland and prospective investors continue as at the date of this interim report. Target of the negotiations is to secure sufficient financing to participate in the acquisition of the mining operations, or to secure a different financial and/or operative arrangement that will enable the continuance of the Company's eligible business.

    In December 2014, Talvivaara decided to place its dormant subsidiaries Talvivaara Exploration Oy, Talvivaara Infrastructure Oy, Bream Lake Energy Oy and Talvivaara Management Oy in liquidation. Prior to the decision to liquidate these subsidiaries, Talvivaara converted all its receivables from these companies into equity and the subsidiaries wrote off all their receivables from the bankruptcy estate of Talvivaara Sotkamo. In addition, Talvivaara sold on 30 December 2014 all the shares of its subsidiary incorporated under the laws of Sweden, Hyena Holding AB, to a third party independent of the management and significant shareholders against a nominal purchase price basing on the amount of liquid assets of Hyena Holding AB at the time of transaction. Placing the subsidiaries in liquidation and the conveyance of the shares in Hyena Holding AB was in line with the Company's plan to simplify the group structure and leave the Company as the single reporting entity.The liquidation processes were completed and dormant subsidiaries dissolved on 26 June 2015.

    Status of the corporate reorganisation
    On 13 March 2015, the Administrator of the corporate reorganisation of Talvivaara filed the final draft restructuring programme to the District Court of Espoo. The total amount of the restructuring debts to be taken into account in the restructuring proceedings is approximately EUR 513 million, out of which EUR 508 million is considered unsecured debt. This amount does not include debts with lowest priority. In addition, the Company has approximately EUR 8 million liability relating to a granted third-party security. The Administrator proposed that the restructuring debts be cut by 99% which would leave 1% of the amount of such debt to be repaid. The restructuring debts secured by business mortgage will not be cut and no payments would be made on debts with lowest priority. The draft restructuring programme does not include a provision on a duty to make supplementary payments.

    Please refer to the Company's 2014 Financial Statements for more detailed description of the terms of the final draft restructuring programme and the conditions for the entry into force thereof.

    The approval of the draft restructuring programme required, inter alia, express support from the necessary number of creditors. The creditors' voting procedure was completed on 6 May 2015 and the Administratorsubmitted the voting report on the outcome of the creditors' voting procedure to the District Court of Espoo on 25 May 2015.The Administrator's draft restructuring programme was supported by approximately 97.5 percent of the creditors of unsecured debt participating in the voting. In total, creditors whose receivables represent over 53 percent of all known debts recognized for the purposes of the voting procedure voted in favour of the draft restructuring programme. The requisite support from the creditors set forth in the Restructuring of Enterprises Act for the approval of the draft restructuring programme was thereby obtained.

    The Annual General Meeting held on 25 June 2015 authorised the Board of Directors to resolve on the share issue of up to 4,500,000,000 new shares in aggregate in deviation from the pre-emptive subscription rights of the shareholders through one or several share issues to conduct the conversion of the unsecured restructuring debts. The decision made was one of the special conditions set for the confirmation and entry into force of the draft restructuring programme. The confirmation and entry into force of the draft restructuring programme is still subject to a number of the conditions relating to inter alia the business and financing arrangements of the Company.

    Business development projects
    Talvivaara acquired in 2011-2012 an approximately 60MW capacity share in the Fennovoima nuclear project in Finland. Due to the Company's ongoing corporate reorganisation proceedings, Talvivaara is currently not in a position to make further investments into the project. There was no change in Talvivaara's position relating to Fennovoima during the first half of 2015.

    Legal proceedings
    In April 2015, Talvivaara confirmed that a number of current and former members of Talvivaara's Board of Directors and management have been heard in connection with an investigation relating to the Company's disclosure practices. Talvivaara believes that the investigation will establish the appropriateness of the Company's conduct in all respects, and emphasizes that the Company has already in the past gone through the applied disclosure practices extensively and in great detail with the Financial Supervisory Authority.

    Annual General Meeting
    Talvivaara's Annual General Meeting was held on 25 June 2015 in Espoo, Finland. The resolutions of the AGM included:
    - that no dividend be paid for the financial year 2014;
    - that the annual fee payable to the members of the Board for the term until the close of the Annual General Meeting in 2016 be as follows: Chairman of the Board of Directors EUR 84,000/year and other Non-executive Directors: EUR 48,000/year. No separate meeting fees are paid for the Board or the Committee work. The remuneration of the Executive Directors is included in their base salary, and it is not paid out separately;
    - that the number of Board members be five (5) and that Mr. Tapani Järvinen, Mr. Pekka Perä, Mr. Stuart Murray and Ms. Solveig Törnroos-Huhtamäki were re-elected. Mr. Kari Järvinen was elected as a new member to the Board;
    - that the auditor be reimbursed according to the approved auditor's invoice and authorised public accountants PricewaterhouseCoopers Oy be elected as the Company's auditor for the financial year 2015;
    - that the Board of Directors be authorised to resolve on the share issueof up to 4,500,000,000 new shares in aggregate in deviation from the pre-emptive subscription rights of the shareholders through one or several share issues to conduct the conversion of the unsecured restructuring debts into new shares in the Company. The subscription price of the shares shall be EUR 0.1144 per share and the subscription price shall be paid by setting off the subscriber's unsecured restructuring debt claim including any possible interest and costs relating thereto from the Company. The share issue authorisation is valid until 31 December 2017.

    At its constituent meeting on 25 June 2015, the Board of Directors re-elected Mr. Tapani Järvinen as the chairman of the Board.

    Risk management and key risks
    Talvivaara's near-term risk factors include particularly such risks that relate to its ongoing corporate reorganisation proceedings, financing and sufficiency of funds to meet its actual and potential liabilities.

    The approval and authorisation of the proposed restructuring programme of Talvivaara is conditional, among other things, on (i) Talvivaara succeeding in completing an arrangement that will secure the necessary cash flow for the Company to discharge all of its liabilities and the continuance of the Company's eligible business, and (ii) the shareholders of Talvivaara approving the financial arrangement required to discharge the remaining restructuring debts and to cover other possible liabilities to the extent the Company's other funds are not sufficient for such purpose. As at the date of the Company's H1 2015 interim results on 27 August 2015, there is no certainty as to whether the Company can fulfil all the set requirements within the given time frame.

    Although the Board of Directors believes that a corporate reorganisation is a viable option for Talvivaara, there can be no assurance that the proposed restructuring programme of the Company will be approved and authorised or be ultimately successful. The corporate reorganisation process can fail for a number of reasons, including due to an insufficiency of funds to implement or complete the restructuring programme, changes in circumstances affecting the financial viability of Talvivaara, including, for example, termination of the service and lease agreements, or insufficient income from the services provided. If the corporate reorganisation fails for these or any other reasons, it could result in the bankruptcy of the Company.

    Furthermore, even if the Company's restructuring debts were cut in accordance with the Administrator's final draft restructuring programme, the assets of the Company would still be less than the aggregate amount of the Company's remaining liabilities following the 99-percent-haircut of the unsecured restructuring debts or even following a 100% conversion of the unsecured restructuring debts into equity of the Company. The exact amount of the negative funding balance will depend, among others, on the extent to which unsecured restructuring debts are converted into equity of the Company, and on the aggregate amount of the Company's other liabilities not subject to restructuring at the date of entry into force of the restructuring programme. As at the date of the Company's H1 2015 interim results on 27 August 2015, there is no certainty as to whether the Company succeeds in bridging the negative funding balance. More information on the negative equity is provided in Note 1.

    Failure by the Company to reach final clarity on the treatment of its guarantee obligation for the termination sum set forth in the Zinc Streaming Agreement or for the EUR 12.8 million guarantee liability under the Streaming Holiday Agreement may impair or even hinder the Company's efforts to raise new funds for the successful fulfilment of the conditions for the entry into force of the Company's restructuring programme. Whilst the Company shares the view of the Administrator on the treatment of the guarantee obligation for the termination sum under the Zinc Streaming Agreement and considers the view well-founded, there is no certainty that a competent court or a dispute resolution authority would arrive at the same outcome, should Nyrstar take legal actions to contest the chosen view. Furthermore, even if such legal actions were not initiated by Nyrstar, any uncertainty surrounding the issue would have a significant negative effect on the Company's ability to raise new funds required for the successful fulfilment of the conditions for the entry into force of the Company's restructuring programme.

    The right of conversion of debt into equity included in the restructuring programme of Talvivaara and/or the issuance of new equity instruments may lead to a significant dilution of the existing shareholding of the Company. The extent of dilution will eventually be determined by the aggregate amount of the restructuring debts to be converted into shares at the determined conversion rate of EUR 0.1144 per share as well as by the subscription price of the newly issued shares offered and the amount of funds raised in, the potential equity financing.

    The Sotkamo mine has faced various difficulties since the commissioning of the mine in 2008 and 2009. These difficulties include, among others, operational difficulties concerning the mine's production and performance, environmental issues as well as legal and administrative proceedings involving the Sotkamo mine and certain members of Talvivaara's management. Therefore, even in case Talvivaara acquires a stake in the company carrying on the Sotkamo mining operations, the Sotkamo mine may not be able to successfully address various operational, environmental and other difficulties facing the Sotkamo mine and shareholders could ultimately lose their entire investment in the Company. Further, there can be no certainty that the financing potentially available to Talvivaara would be sufficient to ramp-up production at the Sotkamo mine or that it would ever achieve profitability.

    Personnel
    Headcount and remuneration
    The number of personnel employed by the Company on 30 June 2015 was 51 (31 December 2014: 53).

    Talvivaara's personnel comprises an expert organisation, the core competences of which include, for example, analytical laboratory services, bioheapleaching and other production processes, procurement, environmental safety, risk management and communications. The organisation has in the past provided critical services to Talvivaara Sotkamo and it has continued to provide the same services to the bankruptcy estate of Talvivaara Sotkamo as agreed between the Company and the bankruptcy estate. The salaries and wages of Talvivaara's personnel are based on industry-wide collective agreements.

    Management changes
    Chief Human Resources Officer Maija Kaski resigned from her position on 17 June 2015 to pursue her career outside the Company.

    Shares and shareholders
    The number of shares issued and outstanding and registered on the Euroclear Shareholder Register as of 30 June 2015 was 2,096,782,480. This total number of shares includes a total of 192 883 000    treasury shares.The shares, when held in treasury by the Company, do not carry voting rights or any other shareholder rights in the Company.  Including the effect of the EUR 225 million convertible bond of 16 December 2010, the authorized full number of shares of the Company amounted to 2,195,400,415.

    As at 30 June 2015, the only shareholders who held more than 5% of the shares and votes of Talvivaara were Solidium Oy (15.2%) and Mr. Pekka Perä (5.9%). Talvivaara held directly 9.2% of the shares in the Company. The shares held in treasury by the Company do not carry any voting rights.

    Events after the review period

    Legal proceedings
    On 4 August 2015, the main hearing commenced in the criminal case relating to the gypsum pond leakage and discharges into water ways, where the prosecutor has brought charges against four members of Talvivaara's management, including CEO Pekka Perä and former CEO Harri Natunen. The Company welcomes the opportunity to have the facts relating to the matter as well as the then-current operating conditions of the Company discussed in an open court.

    Transfer of contracts to Terrafame Oy
    Talvivaara announced on 13 August 2015 that it has signed a contract with the state-owned company Terrafame Oy (as of 14 August 2015 Terrafame Group Oy) and its 100% subsidiary Terrafame Mining Oy (as of 14 August 2015 Terrafame Oy), whereby Terrafame Oy assumes the rights and obligations of the bankruptcy estate of Talvivaara Sotkamo under the agreements of 19 November 2014 on provision of administrative and technical services and leasing of certain critical machinery and equipment to the bankruptcy estate on the same terms as were applicable between the Company and the bankruptcy estate. The transfer remained subject to the completion of the mining business from the bankruptcy estate to Terrafame Oy.

    Transfer of the Sotkamo mining business
    The transfer of the Sotkamo mining business from the bankruptcy estate of Talvivaara Sotkamo to Terrafame Oy was completed on 14 August 2015. Due to the transfer of the Company's essential contracts from the bankruptcy estate to Terrafame Oy agreed on 13 August 2015, the completed transfer of business does not have any immediate effects on the Company, its financial position or the short-term outlook. The Company continues the negotiations with the state of Finland and the Terrafame group on the terms of the Company's potential investment in the Sotkamo mining operations.

    Short-term outlook
    The operational outlook for Talvivaara is greatly dependent on the successful completion of the Company's corporate reorganisation proceedings and the success to closing, timing and extent of the necessary financing solutions currently under contemplation. Whilst the Administrator's final draft restructuring programme gives the Company reasonably ample time fulfil the requirements set forth for the entry into force of the restructuring programme, there is no certainty that the Company can fulfil all the requirements within the given time frame.

    27 August 2015

    Talvivaara Mining Company Plc
    Board of Directors

    STATEMENT OF FINANCIAL POSITION    
    (All amounts in EUR) As at
    30 Jun 15
    As at
    31 Dec 14
    ASSETS    
    Non-current assets    
    Property, plant and equipment 4,999,546 5,010,758
    Intangible assets 497,088 554,887
    Other receivables 30,926 31,094
      5,527,559 5,596,738
    Current assets    
    Trade receivables 63,678 284,466
    Other receivables 46,599 35,336
    Cash and cash equivalents 4,432,729 5,346,381
      4,543,006 5,666,183
    TOTAL ASSETS 10,070,565 11,262,921
    EQUITY AND LIABILITIES    
    Equity attributable to the owners    
    Share capital 80,000 80,000
    Share premium 8,085,842 8,085,842
    Other reserves 771,648,199 771,648,200
    Retained deficit (1,524,313,624) (1,509,757,176)
      (744,499,583) (729,943,134)
    Total equity (744,499,583) (729,943,134)
    Current liabilities    
    Provisions 203,444,456 203,444,456
    Borrowings 503,955,559 500,720,066
    Trade payables 2,743,335 2,759,678
    Other payables 44,426,799 34,281,855
      754,570,148 741,206,055
    Total liabilities 754,570,148 741,206,055
    TOTAL EQUITY AND LIABILITIES 10,070,565 11,262,921
     

     

    INCOME STATEMENT
       
    (All amounts in EUR) Period ended
    30 Jun 15
    Period ended
    30 Jun 14
    Other operating income 3,436,664 7,125,872
    Materials and services (138,698) (155,917)
    Personnel expenses (2,132,041) (2,895,555)
    Depreciation and amortisation (342,470) (507,038)
    Other operating expenses (1,314,824) (2,233,441)
    Operating profit/loss (491,368) 1,333,923
    Finance income 1,620 22,013,916
    Finance cost (14,488,035) (15,491,476)
    Finance cost (net) (14,486,415) 6,522,441
    Profit/Loss before income tax (14,977,783) 7,856,363
    Income tax 0 0
    PROFIT/LOSS FOR THE FINANCIAL PERIOD (14,977,782) 7,856,363

    STATEMENT OF CHANGES IN EQUITY       
    EUR Share
    capital
    Share
    issue
    Share
    premium
    Other
    reserves
    Retained
    deficit
    Total
    31 Dec 14 80,000 - 8,085,842 771,648,200 (1,509,757,176) (729,943,134)
    Absorption of subsidiaries - - - - 421,334 421,334
    Profit (loss) for the year  - -  -  - (14,977,782) (14,977,782)
    30 Jun 15 80,000 - 8,085,842 771,648,200 (1,524,313,624) (744,499,583)

    CASH FLOW STATEMENT  
    (all amounts in EUR) 2015 2014
    Cash flows from operating activities    
    Profit / loss for the year (14,977,782) 7,856,363
    Adjustments for    
    Depreciation and amortisation 342,470 507,038
    Interest income (1,620) (22,013,916)
    Interest expenses 14,488,035 15,491,476
    Cash flow before change in working capital (148,898) 1,840,961
    Change in working capital    
    Decrease(+)/increase(-) in trade and other receivables 211,314 (3,969,367)
    Decrease(-)/increase(+) in trade and other payables (891,319) 594,350
    Change in working capital (680,005) (3,375,017)
    Net cash used in operating activities before
    financing activities and taxes
    (828,903) (1,534,057)
    Interest and other finance cost paid (84,749) (648,764)
    Interest and other finance income 0 255,053
    Net cash generated (used) in operating activities (913,652) (1,927,767)
    Cash flows from investing activities    
    Purchases of intangible assets 0 (37,126)
    Purchases of other shares 0 (101,775)
    Investments to subsidiaries 0 (2,246,913)
    Net cash generated (used) in investing activities 0 (2,385,813)
    Cash flows from financing activities    
    Net cash generated from financing activities 0 0
    Net (decrease)/increase in cash and bank overdrafts (913,652) (4,313,580)
    Cash and bank overdrafts at beginning of the year 5,346,381 4,697,666
    Cash and bank overdrafts at end of the period 4,432,729 384,086

    NOTES

    1. Basis of preparation

    This interim report has been prepared in accordance with International Financial Reporting Standards (IFRS) as adopted by the European Union taking into account the corporate reorganisation proceedings that commenced in respect of the Company on 29 November 2013, and IAS 1.25 and IAS 1.26 requirements regarding the disclosure under the non-going concern basis.

    Talvivaara's H1 2015 interim results report has been prepared on a basis other than going concern. The H1 2014 interim results report has not been restated to take into account the non-going concern assumption.

    The chosen reporting basis results from the existence of material uncertainty that casts significant doubt upon the Company's ability to realise its assets and discharge its liabilities in the normal course of business and from the lack of visibility on the Company's operational environment twelve months beyond the date of reporting. Therefore, the requisite adjustments resulting from the chosen reporting basis have, where applicable, been reflected in the carrying amounts of the Company's assets and liabilities, but no reserve has been made in the Company's balance sheet for the costs relating to winding down of the operations.

    Talvivaara's ability to revise its reporting basis and to regain its status as a going concern is dependent, among other things, on the successful completion of the Company's corporate reorganisation proceedings, which requires that (i) Talvivaara succeeds in completing an arrangement that will secure the necessary cash flow for the Company to discharge all of its liabilities and the continuance of the Company's eligible business, and (ii) the shareholders of Talvivaara approve the financial arrangement required to discharge the remaining restructuring debts and to cover other possible liabilities to the extent the Company's other funds are not sufficient for such purpose. As of the date of the Company's H1 2015 interim results 27 August 2015, there is no certainty as to whether the Company can fulfil all the set requirements within the given time frame.

    Should the restructuring programme draft be approved as proposed by the Administrator, following illustrative calculations on equity position can be drawn. First calculation assumes that none of the restructuring creditors convert their debt to equity as per the restructuring programme and latter calculation assumes that all of the non-secured creditors convert their restructuring debt to equity.

    Illustrative calculation of the Company equity, if the restructuring programme would be approved  
    (Assuming none of the restructuring creditors convert to equity)  
      As at 30 Jun 15
    Recognised equity (744,499,583)
    Debts under the restructuring programme recognised on balance sheet (including all accrued interest) 536,259,580
    Equity after full write down of recognised restructuring debts (208,240,003)
    Restructuring debts remaining if programme is approved (12,586,849)
    Interest on secured restructuring debts during the restructuring proceedings (205,547)
    Equity after the approval of the restructuring programme (221,032,399)
    Reversal of Nyrstar provision 203,444,456
    Equity excluding Nyrstar provision (17,587,943)
    Illustrative calculation of the Company equity, if the restructuring programme would be approved  
    (Assuming all of the non-secured restructuring creditors convert to equity)  
      As at 30 Jun 15
    Recognised equity (744,499,583)
    Debts under the restructuring programme recognised on balance sheet (including all accrued interest) 536,259,580
    Equity after full write down of recognised restructuring debts (208,240,003)
    Restructuring debts remaining if programme is approved (7,500,000)
    Interest on secured restructuring debts during the restructuring proceedings (205,547)
    Equity after the approval of the restructuring programme (215,945,550)
    Reversal of Nyrstar provision 203,444,456
    Equity excluding Nyrstar provision (12,501,094)

    2. Property, plant and equipment        
    (All amounts in EUR) Buildings Machinery
    and
    equipment
    Construction
    in
    progress
    Total
    Gross carrying amount at 1 Jan 2014 11,899,045 19,837,595 0 31,736,640
    Gross carrying amount at 31 Dec 2014 11,899,045 19,837,595 0 31,736,640
    Accumulated depreciation and impairment losses at 1 Jan 2014 8,521,159 14,265,990 - 22,787,149
    Depreciation for the year 292,173 560,847 - 853,020
    Impairment losses 3,085,712 - - 3,085,712
    Accumulated depreciation and impairment losses at 31 Dec 2014 11,899,045 14,826,837 - 26,725,882
    Carrying amoung at 1 Jan 2014 3,377,885 5,571,605 0 8,949,490
    Carrying amount at 31 Dec 2014 0 5,010,758 0 5,010,758
    Gross carrying amount at 1 Jan 2015 11,899,045 19,837,595 - 31,736,640
    Additions - 266,843 - 266,843
    Gross carrying amount at 30 Jun 2015 11,899,045 20,104,438 - 32,003,483
    Accumulated depreciation and impairment losses at 1 Jan 2015 11,899,045 14,826,837 - 26,725,882
    Depreciation for the year - 278,055 - 278,055
    Accumulated depreciation and impairment losses        
    at 30 Jun 2015 11,899,045 15,104,892 - 27,003,937
    Carrying amoung at 1 Jan 2015 0 5,010,758 - 5,010,758
    Carrying amount at 30 Jun 2015 0 4,999,546 - 4,999,546

    3. Intangible assets        
    (All amounts in EUR) Intangible
    rights
    Other capitalized
    long-term
    expenditure
    Construction
    in
    progress
    Total
    Gross carrying amount at 1 Jan 14 1,201,566 295,615 156,918 1,654,099
    Additions 29,680 39,729 0 69,410
    Gross carrying amount at 30 Jun 14 1,231,246 335,345 156,918 1,723,509
    Accumulated depreciation and impairment losses at 1 Jan 14 805,314 132,058 0 937,372
    Depreciation for the year 46,821 33,372 - 80,193
    Accumulated depreciation and impairment losses at 30 Jun 4 852,135 165,430 35,643 1,053,208
      0 0 0 0
    Carrying among at 1 Jan 14 396,252 163,557 156,918 716,727
    Carrying amount at 30 Jun 14 379,111 169,915 121,275 670,301
    Gross carrying amount at 1 Jan 15 1,240,111 307,654 88,083 1,635,848
    Gross carrying amount at 30 Jun 15 1,240,111 307,654 94,698 1,642,464
    Accumulated depreciation and impairment losses at 1 Jan 15 879,751 201,210 - 1,080,961
    Depreciation for the year 36,281 28,134 0 64,415
    Accumulated depreciation and impairment losses at 30 Jun 15 916,032 229,344 - 1,145,376
    Carrying amoung at 1 Jan 15 360,359 106,444 88,083 554,886
    Carrying amount at 30 Jun 15 324,080 78,311 94,698 497,088

    4. Investments    
    Shares in group companies As at
    30 Jun 15
    As at
    31 Dec 14
    At the beginning of the year 0 16,606,591
    Additions 0 14
    Impairment 0 (16,606,605)
    At the end of the period 0 0
    Receivables from group companies 2015 2014
    At the beginning of the year 0 262,260,463
    Additions 0 2,350,000
    Impairment 0 (264,610,463)
    At the end of the period 0 0
    Other shares 2015 2014
    At the beginning of the year 0 6,967,599
    Additions 0 277,702
    Impairment 0 (7,245,301)
    At the end of the period 0 0
    Total investments    
      2015 2014
    At the beginning of the year 0 285,834,653
    Impairment 0 2,627,717
    Additions 0 (288,462,369)
    At the end of the period 0 0

    5. Borrowings and capital loans

     
       
    EUR As at
    30 Jun 15
    As at
    31 Dec 14
    Restructuring loans    
    Bonds 110,000,000 110,000,000
    Convertible bonds 241,241,152 249,620,846
    Revolving credit facility 70,000,000 70,000,000
    Absolute guarantee 50,703,476 50,703,476
    Interest during proceedings 11,171,398 7,465,075
    Other borrowings during procedure 20,839,533 12,930,668
      503,955,559 500,720,066

    6. Contingencies and commitments 9  
    Counter indemnity given as a guarantee for the guarantee insurance provided by Atradius Credit Insurance N.V to Kainuu ELY Centre
      As at
    30 Jun 15
    As at
    31 Dec 14
    EUR 2015 2014
    Counter indemnity given as a guarantee 31,940,000 31,940,000
      31,940,000 31,940,000
    The future aggregate minimum lease payments under non-cancellable operating leases    
    EUR As at
    30 Jun 15
    As at
    31 Dec 14
    No later than 1 year 78,178 97,637
    Later than 1 year and not later than 5 years 144 4,672
      78,322 102,309

    Share-related key figures        
        Six
    months to
    30 Jun 15
    Six
    months to
    30 Jun 14
    Twelve
    months to
    31 Dec 14
    Earnings per share EUR (0.02) 0.01 (0.41)
    Equity per share EUR (0.39) 0.04 (0.38)

    Employee-related key figures        
        Six
    months to
    30 Jun 15
    Six
    months to
    30 Jun 14
    Twelve
    months to
    31 Dec 14
    Wages and salaries EUR '000 2,132 2,896 4,436
    Average number of employees   52 58 56
    Number of employees at the end of the period   51 54 53

    Key financial figures of the company

       
       
    Return on equity Profit (loss) for the period
      (Total equity at the beginning of period + Total equity at end of period)/2
       
    Equity-to-assets ratio Total equity
      Total assets
       
    Net interest-bearing debt Interest-bearing debt - Cash and cash equivalent
       
    Debt-to-equity ratio Net interest-bearing debt
      Total equity
       
    Return on investment Profit (loss) for the period + Finance cost
      (Total equity at the beginning of period + Total equity at end of period)/2 + (Borrowings at the beginning of period + Borrowings at end of period)/2
       
    Share-related key figures
       
    Earnings per share Profit (loss) attributable to equity holders of the Company
      Adjusted average number of shares
       
    Equity per share Equity attributable to equity holders of the Company
      Adjusted average number of shares



    This announcement is distributed by NASDAQ OMX Corporate Solutions on behalf of NASDAQ OMX Corporate Solutions clients.
    The issuer of this announcement warrants that they are solely responsible for the content, accuracy and originality of the information contained therein.
    Source: Talvivaaran Kaivososakeyhtiö Oyj via Globenewswire

    HUG#1947877



    GlobeNewswire
    0 Follower
    Autor folgen

    Verfasst von GlobeNewswire
    Talvivaara Mining Company Interim Report for January-June 2015 Stock Exchange ReleaseTalvivaara Mining Company Plc27 August 2015 Talvivaara Mining Company Interim Report for January-June 2015 Requisite support for the draft restructuring programme received from the creditorsThe negotiations on the …