Big Blue Wind Farm, LLC is authorized to construct and operate up to a 36 Megawatt Large Wind Energy Conversion System on the site identified in this site permit and in compliance with the conditions contained in this permit

http://energyfacilities.puc.state.mn.us/documents/30587/orde…

Man hat noch Konkurrenz:
The Project nameplate capacity will be 36 MW. The Project will be comprised of up to 24 GE 1.5 MW or 22 GE 1.6 MW wind turbine generators with a rotor diameter of 270 feet (82.5 meters), 14 Nordex 2.5 MW turbines with a rotor diameter of 328 feet (100 meters), or 18 Gamesa 2.0 MW turbines with a rotor diameter of 318 feet (97 meters) on 262.5 feet (80 meters) turbine towers.23

btw: "The REpower MM92 is no longer being considered."
Exergy Development Group, 2011

Big Blue sieht dies wohl ähnlich:
http://energyfacilities.puc.state.mn.us/documents/30587/Big%…
micro-sitting guide scheint von März 2011...)da war Repower noch eine Option...

Aber alles nur meine Meinung - keine Kaufempfehlung
 
aus der Diskussion: Nordex , Windenergie und die Energiewende nach Fukushima
Autor (Datum des Eintrages): spiralkanal  (31.10.11 23:51:10)
Beitrag: 1,538 von 2,006 (ID:42282994)
Alle Angaben ohne Gewähr © wallstreetONLINE