Beitrag Nr.42487 http://www.wallstreet-online.de/diskussion/1002983-42481-424… Big Blue Wind Farm, LLC is authorized to construct and operate up to a 36 Megawatt Large Wind Energy Conversion System on the site identified in this site permit and in compliance with the conditions contained in this permit http://energyfacilities.puc.state.mn.us/documents/30587/orde… Man hat noch Konkurrenz: The Project nameplate capacity will be 36 MW. The Project will be comprised of up to 24 GE 1.5 MW or 22 GE 1.6 MW wind turbine generators with a rotor diameter of 270 feet (82.5 meters), 14 Nordex 2.5 MW turbines with a rotor diameter of 328 feet (100 meters), or 18 Gamesa 2.0 MW turbines with a rotor diameter of 318 feet (97 meters) on 262.5 feet (80 meters) turbine towers.23 btw: "The REpower MM92 is no longer being considered." Exergy Development Group, 2011 Big Blue sieht dies wohl ähnlich: http://energyfacilities.puc.state.mn.us/documents/30587/Big%… micro-sitting guide scheint von März 2011...)da war Repower noch eine Option... Aber alles nur meine Meinung - keine Kaufempfehlung |
|
aus der Diskussion: | Nordex , Windenergie und die Energiewende nach Fukushima |
Autor (Datum des Eintrages): | spiralkanal (31.10.11 23:51:10) |
Beitrag: | 1,538 von 2,006 (ID:42282994) |
Alle Angaben ohne Gewähr © wallstreetONLINE |