Fenster schließen  |  Fenster drucken

Eric Saderholm, APM’s President, commented: “The Gooseberry Project is a low sulphidation, epithermal system with high-grade gold and silver mineralization hosted in quartz carbonate veins. The project was intermittently productive over the last century, and it’s our belief that there is a lot of exploration potential remaining over the project area. When the last operators were mining at Gooseberry, gold was only $353 dollars per ounce, so little exploration was taking place. I look forward to reviewing the historic data and starting the 2019 sampling programs as soon as possible.”
 
aus der Diskussion: Hotstock - Goldmultibagger in Nevada
Autor (Datum des Eintrages): How much  (23.04.19 10:14:30)
Beitrag: 633 von 2,037 (ID:60402126)
Alle Angaben ohne Gewähr © wallstreetONLINE