Eric Saderholm, APM’s President, commented: “The Gooseberry Project is a low sulphidation, epithermal system with high-grade gold and silver mineralization hosted in quartz carbonate veins. The project was intermittently productive over the last century, and it’s our belief that there is a lot of exploration potential remaining over the project area. When the last operators were mining at Gooseberry, gold was only $353 dollars per ounce, so little exploration was taking place. I look forward to reviewing the historic data and starting the 2019 sampling programs as soon as possible.” |
|
aus der Diskussion: | Hotstock - Goldmultibagger in Nevada |
Autor (Datum des Eintrages): | How much (23.04.19 10:14:30) |
Beitrag: | 633 von 2,037 (ID:60402126) |
Alle Angaben ohne Gewähr © wallstreetONLINE |