[posting]60572054[/posting]@reiners. bin da doch immer noch am Grübeln über dir WKT Zahlen, sofern es die überhaupt gibt. Auszug aus der uFS (S. 11): The Mineral Reserve declared on 27 February 2019 underpins the production target. This estimate was prepared by a Competent Person in accordance with JORC Code 2012. The production target is an average of 226,000 tonnes per month of ore @ 17.9% TGC for an annual total of 40,000 tonnes of graphite in concentrate. Approximately 55% of the total production target is in the Measured and 45% in the Indicated Resource categories within the Mineral reserve Statement. None of the production target is in the Inferred Resource category. A cut off of 10% TGC has been used. A mining loss and dilution of 5% each have been applied. die bauen also 226000 t @ 17,9% TGC im Monat ab. Hab mal gelesen, dass die nur 10 Monate abbauen wegen Wetter, wären dann im Jahr 2 260 000 t . Bei einem Gehalt von 17,9%TGC wären das 404540t an Graphit. Davon wollen se 40 000t im Jahr Concentrat herstellen, also ca. nur 1 zehntel von dem, was sie an reinem Graphit haben müßten. Kann das sein? Wo ist der Fehler? Oder ist das ein Schreibfehler in der uFS, weil es auf Seite 3 heißt: As a result of the increased LoM grade, the average annual mill feed requirement has reduced from a average of 280,000 tonnes per year to an average of 230,000 tonnes per year |
|
aus der Diskussion: | Grafitexplorer Afrika - Peer Group Valuation |
Autor (Datum des Eintrages): | tgfn (16.05.19 16:36:57) |
Beitrag: | 3,039 von 3,634 (ID:60584747) |
Alle Angaben ohne Gewähr © wallstreetONLINE |