[posting]60572054[/posting]@reiners.

bin da doch immer noch am Grübeln über dir WKT Zahlen, sofern es die überhaupt gibt.

Auszug aus der uFS (S. 11):

The
Mineral Reserve declared on 27 February 2019 underpins the production target. This estimate
was prepared by a Competent Person in accordance with JORC Code 2012.
The production target is an average of 226,000 tonnes per month of ore @ 17.9% TGC for an annual total of 40,000 tonnes of graphite in concentrate.
Approximately 55% of the total production target is in the Measured and 45% in the Indicated Resource categories within the Mineral reserve Statement. None of the production target is in the Inferred Resource category. A cut off of 10% TGC has been used. A mining loss and dilution of 5% each have been applied
.

die bauen also 226000 t @ 17,9% TGC im Monat ab. Hab mal gelesen, dass die nur 10 Monate abbauen wegen Wetter, wären dann im Jahr 2 260 000 t .
Bei einem Gehalt von 17,9%TGC wären das 404540t an Graphit. Davon wollen se 40 000t im Jahr Concentrat herstellen, also ca. nur 1 zehntel von dem, was sie an reinem Graphit haben müßten.
Kann das sein? Wo ist der Fehler? Oder ist das ein Schreibfehler in der uFS, weil es auf Seite 3 heißt: As a result of the increased LoM grade, the average annual mill feed requirement has reduced from a average of 280,000 tonnes per year to an average of 230,000 tonnes per year
 