darum steigt Tournigan....(u.a. RealTime) - 500 Beiträge pro Seite
eröffnet am 29.09.05 15:12:54 von
neuester Beitrag 04.10.05 09:12:35 von
neuester Beitrag 04.10.05 09:12:35 von
Beiträge: 13
ID: 1.010.553
ID: 1.010.553
Aufrufe heute: 0
Gesamt: 4.933
Gesamt: 4.933
Aktive User: 0
Top-Diskussionen
Titel | letzter Beitrag | Aufrufe |
---|---|---|
vor 39 Minuten | 2593 | |
vor 1 Stunde | 2283 | |
vor 24 Minuten | 1705 | |
vor 1 Stunde | 1583 | |
vor 35 Minuten | 860 | |
vor 1 Stunde | 761 | |
20.04.24, 12:11 | 686 | |
vor 24 Minuten | 638 |
Meistdiskutierte Wertpapiere
Platz | vorher | Wertpapier | Kurs | Perf. % | Anzahl | ||
---|---|---|---|---|---|---|---|
1. | 1. | 17.958,75 | +0,13 | 184 | |||
2. | 2. | 134,04 | +0,59 | 125 | |||
3. | 3. | 2.299,95 | -1,17 | 89 | |||
4. | 4. | 6,8840 | -0,20 | 73 | |||
5. | 19. | 0,2030 | +11,54 | 52 | |||
6. | 5. | 681,70 | +1,20 | 48 | |||
7. | 9. | 43,10 | -4,65 | 47 | |||
8. | 6. | 3,7500 | +0,81 | 35 |
Hallo Leser,...
dies ist keine ganz neue Meldung, sie ist von gestern, aber immerhin erklärt diese den Kursanstieg von gestern/heute.
Meiner Meinung nach stehen wir ganz am Anfang....ich denke dass es heute in Can noch weiter hochgeht und wir die 0,65Can$ sehen werden..
Grüße
Svenja
(Real Time weiter unten...) Loserin bitte nicht runterscrollen, sonst regst Du dich unnötigerweise wieder auf...)
Tournigan Gold begins diamond drilling at Jahodna
2005-09-28 07:57 ET - News Release
Mr. James Walchuck reports
TOURNIGAN BEGINS CONFIRMATION DRILLING AT JAHODNA URANIUM PROJECT
Tournigan Gold Corp. has started diamond drilling on the Jahodna uranium project in Slovakia. The initial portion of the phase 1 program of 1,500 metres is designed to confirm historic drill hole assay results that contain uranium and molybdenum mineralization within the historical resource block. This data confirmation is part of Tournigan`s road map to update the resource estimate at Jahodna to Canadian National Instrument 43-101 standards. After the completion of the new resource estimate, Tournigan plans to continue phase 1 drilling at Jahodna, focusing on exploration along strike.
Tournigan has commissioned A.C.A. Howe International Ltd. to author the independent technical report that will include the updated Jahodna uranium resource estimate. The report will include results from the three initial confirmatory drill holes. A.C.A. Howe has considerable experience in uranium, managing director Dr. Cal Armstrong was chief geologist for British Nuclear Fuels Ltd. for three years, and was chief geologist for A.C.A. Howe Australia when it discovered the Jabiluka deposit for Pancontinental Mining.
The historical resource estimate reported at Jahodna is as follows:
JAHODNA HISTORICAL URANIUM DEPOSIT
URANOVY PRIEKSUM, 1996
Category U3O8 Mo U3O8 U3O8 Mo
% % 000 t 000 lbs 000 lbs
Block A 0.541 0.38 1,150 13,720 9,630
Block B 0.221 0.38 1,080 5,250 9,050
Total 0.386 0.38 2,230 18,970 18,680
Note: Not National Instrument 43-101-compliant resources -- investors are cautioned not to rely upon this estimate.
Note: Uranium metal grades converted to uranium oxide grades (U3O8) using a factor of 1.17.
The Jahodna deposit was discovered in 1985, and the extensive historical work program ended in 1996, following the collapse of the socialist government. A total of 53 holes comprising 17,936 metres were drilled at Jahodna between 1985 and 1991, with full radiometric surveying of each hole followed by quantitative chemical analyses of mineralized core intervals. The historical resource occurs within a 500-metre-long zone and was estimated using a block model method and a cut-off grade of 0.03 per cent for the block A estimate, and a range of cut-off grades from 0.03 per cent to 0.015 per cent for the block B estimate. Considerable metallurgical work resulted in reported recoveries of 88 per cent to 90 per cent uranium and 93 per cent to 94 per cent molybdenum.
Tournigan has begun prioritizing exploration targets at Jahodna, based on the significant historical data that has been compiled. Initial focus will be on extensions along strike both southeast and northwest of the historical resource block. Wide-spaced historical drill holes outside the resource block have intersected uranium mineralization within the same contact zone along a 3,000-metre trend.
Tournigan has reviewed the Jahodna historical resource estimate and views it as relevant. The historic exploitation of Slovak uranium deposits in general and metallurgical test records acquired with the Jahodna deposit in particular suggests the reliability of the historical resource estimates. However, until the independent technical report is completed, the classification of the resources will not be verified and the resources have not yet been categorized according to the Standards on Mineral Resources and Reserves Definitions by the Canadian Institute of Mining, Metallurgical and Petroleum. The Slovak category of Z-3 is roughly analogous to the CIM definition for inferred resources.
Corporate matters
Tournigan is also pleased to report that the non-brokered private placement announced in Stockwatch on Sept. 1, 2005, has closed, raising gross proceeds of $2.0-million. On closing, 5.0 million units of the company at 40 cents per unit were issued to Passport Capital. Each unit consists of one common share and one-half of a warrant, with each whole warrant entitling the holder to purchase an additional common share at an exercise price of 55 cents per share until Sept. 8, 2007. The company may require the warrants to be exercised any time after the trading price of Tournigan`s shares exceeds $1.00 per share for 30 consecutive trading days. A finder`s fee equal to 7 per cent of the gross proceeds was paid on closing. Any shares issued pursuant to this placement are subject to a four-month hold period expiring on Jan. 8, 2006.
Real - Time:
Viel erfolg allen Investierten
Eure Svenja
dies ist keine ganz neue Meldung, sie ist von gestern, aber immerhin erklärt diese den Kursanstieg von gestern/heute.
Meiner Meinung nach stehen wir ganz am Anfang....ich denke dass es heute in Can noch weiter hochgeht und wir die 0,65Can$ sehen werden..
Grüße
Svenja
(Real Time weiter unten...) Loserin bitte nicht runterscrollen, sonst regst Du dich unnötigerweise wieder auf...)
Tournigan Gold begins diamond drilling at Jahodna
2005-09-28 07:57 ET - News Release
Mr. James Walchuck reports
TOURNIGAN BEGINS CONFIRMATION DRILLING AT JAHODNA URANIUM PROJECT
Tournigan Gold Corp. has started diamond drilling on the Jahodna uranium project in Slovakia. The initial portion of the phase 1 program of 1,500 metres is designed to confirm historic drill hole assay results that contain uranium and molybdenum mineralization within the historical resource block. This data confirmation is part of Tournigan`s road map to update the resource estimate at Jahodna to Canadian National Instrument 43-101 standards. After the completion of the new resource estimate, Tournigan plans to continue phase 1 drilling at Jahodna, focusing on exploration along strike.
Tournigan has commissioned A.C.A. Howe International Ltd. to author the independent technical report that will include the updated Jahodna uranium resource estimate. The report will include results from the three initial confirmatory drill holes. A.C.A. Howe has considerable experience in uranium, managing director Dr. Cal Armstrong was chief geologist for British Nuclear Fuels Ltd. for three years, and was chief geologist for A.C.A. Howe Australia when it discovered the Jabiluka deposit for Pancontinental Mining.
The historical resource estimate reported at Jahodna is as follows:
JAHODNA HISTORICAL URANIUM DEPOSIT
URANOVY PRIEKSUM, 1996
Category U3O8 Mo U3O8 U3O8 Mo
% % 000 t 000 lbs 000 lbs
Block A 0.541 0.38 1,150 13,720 9,630
Block B 0.221 0.38 1,080 5,250 9,050
Total 0.386 0.38 2,230 18,970 18,680
Note: Not National Instrument 43-101-compliant resources -- investors are cautioned not to rely upon this estimate.
Note: Uranium metal grades converted to uranium oxide grades (U3O8) using a factor of 1.17.
The Jahodna deposit was discovered in 1985, and the extensive historical work program ended in 1996, following the collapse of the socialist government. A total of 53 holes comprising 17,936 metres were drilled at Jahodna between 1985 and 1991, with full radiometric surveying of each hole followed by quantitative chemical analyses of mineralized core intervals. The historical resource occurs within a 500-metre-long zone and was estimated using a block model method and a cut-off grade of 0.03 per cent for the block A estimate, and a range of cut-off grades from 0.03 per cent to 0.015 per cent for the block B estimate. Considerable metallurgical work resulted in reported recoveries of 88 per cent to 90 per cent uranium and 93 per cent to 94 per cent molybdenum.
Tournigan has begun prioritizing exploration targets at Jahodna, based on the significant historical data that has been compiled. Initial focus will be on extensions along strike both southeast and northwest of the historical resource block. Wide-spaced historical drill holes outside the resource block have intersected uranium mineralization within the same contact zone along a 3,000-metre trend.
Tournigan has reviewed the Jahodna historical resource estimate and views it as relevant. The historic exploitation of Slovak uranium deposits in general and metallurgical test records acquired with the Jahodna deposit in particular suggests the reliability of the historical resource estimates. However, until the independent technical report is completed, the classification of the resources will not be verified and the resources have not yet been categorized according to the Standards on Mineral Resources and Reserves Definitions by the Canadian Institute of Mining, Metallurgical and Petroleum. The Slovak category of Z-3 is roughly analogous to the CIM definition for inferred resources.
Corporate matters
Tournigan is also pleased to report that the non-brokered private placement announced in Stockwatch on Sept. 1, 2005, has closed, raising gross proceeds of $2.0-million. On closing, 5.0 million units of the company at 40 cents per unit were issued to Passport Capital. Each unit consists of one common share and one-half of a warrant, with each whole warrant entitling the holder to purchase an additional common share at an exercise price of 55 cents per share until Sept. 8, 2007. The company may require the warrants to be exercised any time after the trading price of Tournigan`s shares exceeds $1.00 per share for 30 consecutive trading days. A finder`s fee equal to 7 per cent of the gross proceeds was paid on closing. Any shares issued pursuant to this placement are subject to a four-month hold period expiring on Jan. 8, 2006.
Real - Time:
Viel erfolg allen Investierten
Eure Svenja
[posting]18.078.841 von brokersvenja007 am 29.09.05 15:12:54[/posting]Hallo svenja!
Weist Du, was die ganzen Nullnummern bei den Kursen sollen?
sampler
Weist Du, was die ganzen Nullnummern bei den Kursen sollen?
sampler
schon arm sich hier svenja zu nennen obwohl du ein mann bist...total arm
[posting]18.079.068 von seriosna am 29.09.05 15:25:47[/posting]hallo...gehts noch??
somit können wir auch diesen thread vergessen
svenja
somit können wir auch diesen thread vergessen
svenja
Ich sehe hier keine 0,65 CAD
BID
Orders Volume Price Range
14 133,000 0.500-0.540
ASK
Price Range Volume Orders
0.550-0.590 110,500 8
BID
Orders Volume Price Range
14 133,000 0.500-0.540
ASK
Price Range Volume Orders
0.550-0.590 110,500 8
wau....mit drei mal ordern hoch auf 0,43€
was passiert, wenn die masse auf den wert aufmerksam wird??
grüße eine gut investierte
svenja
ps: schönes wochenende
was passiert, wenn die masse auf den wert aufmerksam wird??
grüße eine gut investierte
svenja
ps: schönes wochenende
sieht doch super aus drüben ....verspricht einiges!!!
jetzt heißt es: halten!!! bis der nächste anstieg kommt,...und der kommt bestimmt...
svenja
Recent Trades - Last 10
Time Ex Price Change Volume Buyer Seller Markers
10:14:35 V 0.61 +0.04 5,000 33 Canaccord 37 MacDougall K
10:12:12 V 0.61 +0.04 15,000 33 Canaccord 68 Leede K
10:12:03 V 0.60 +0.03 23,000 46 Blackmont 79 CIBC K
10:11:25 V 0.61 +0.04 9,000 38 Golden Capital 5 Penson K
10:11:17 V 0.61 +0.04 41,000 59 PI 5 Penson K
10:10:24 V 0.61 +0.04 4,000 59 PI 9 BMO Nesbitt K
10:08:05 V 0.62 +0.05 15,000 68 Leede 5 Penson K
10:07:59 V 0.62 +0.05 10,000 33 Canaccord 5 Penson K
10:07:53 V 0.61 +0.04 50,000 59 PI 5 Penson K
10:07:53 V 0.61 +0.04 5,000 59 PI 7 TD Sec K
Detailed Quote - TOURNIGAN GOLD CORP - http://www.tournigan.com
Sym-X Bid - Ask Last Chg % Vol $Vol #Trade Open-Hi-Lo Year Hi-Lo Last Trade News Delay
TVC - V 10.0 0.61 · 0.63 39.5 0.61 +0.04 7.0 374.0 224 26 0.58 0.62 0.58 0.63 0.185 10:14 Sep 28 20
jetzt heißt es: halten!!! bis der nächste anstieg kommt,...und der kommt bestimmt...
svenja
Recent Trades - Last 10
Time Ex Price Change Volume Buyer Seller Markers
10:14:35 V 0.61 +0.04 5,000 33 Canaccord 37 MacDougall K
10:12:12 V 0.61 +0.04 15,000 33 Canaccord 68 Leede K
10:12:03 V 0.60 +0.03 23,000 46 Blackmont 79 CIBC K
10:11:25 V 0.61 +0.04 9,000 38 Golden Capital 5 Penson K
10:11:17 V 0.61 +0.04 41,000 59 PI 5 Penson K
10:10:24 V 0.61 +0.04 4,000 59 PI 9 BMO Nesbitt K
10:08:05 V 0.62 +0.05 15,000 68 Leede 5 Penson K
10:07:59 V 0.62 +0.05 10,000 33 Canaccord 5 Penson K
10:07:53 V 0.61 +0.04 50,000 59 PI 5 Penson K
10:07:53 V 0.61 +0.04 5,000 59 PI 7 TD Sec K
Detailed Quote - TOURNIGAN GOLD CORP - http://www.tournigan.com
Sym-X Bid - Ask Last Chg % Vol $Vol #Trade Open-Hi-Lo Year Hi-Lo Last Trade News Delay
TVC - V 10.0 0.61 · 0.63 39.5 0.61 +0.04 7.0 374.0 224 26 0.58 0.62 0.58 0.63 0.185 10:14 Sep 28 20
was geht denn hier ab????
rt gleich 0,45€ !!!!!!!!!!!!!!
svenja
Recent Trades - Last 10
Time Ex Price Change Volume Buyer Seller Markers
12:14:48 V 0.66 +0.09 9,000 7 TD Sec 68 Leede K
12:14:48 V 0.66 +0.09 11,000 7 TD Sec 68 Leede K
12:14:41 V 0.65 +0.08 1,000 68 Leede 19 Desjardins K
12:14:41 V 0.65 +0.08 10,000 68 Leede 68 Leede K
12:11:54 V 0.63 +0.06 6,000 33 Canaccord 80 National Bank K
12:11:54 V 0.63 +0.06 14,000 27 Dundee 80 National Bank K
12:00:07 V 0.65 +0.08 10,500 27 Dundee 89 Raymond James K
12:00:07 V 0.65 +0.08 9,500 27 Dundee 68 Leede K
11:59:26 V 0.65 +0.08 500 33 Canaccord 68 Leede K
11:59:26 V 0.65 +0.08 5,000 33 Canaccord 80 National Bank K
rt gleich 0,45€ !!!!!!!!!!!!!!
svenja
Recent Trades - Last 10
Time Ex Price Change Volume Buyer Seller Markers
12:14:48 V 0.66 +0.09 9,000 7 TD Sec 68 Leede K
12:14:48 V 0.66 +0.09 11,000 7 TD Sec 68 Leede K
12:14:41 V 0.65 +0.08 1,000 68 Leede 19 Desjardins K
12:14:41 V 0.65 +0.08 10,000 68 Leede 68 Leede K
12:11:54 V 0.63 +0.06 6,000 33 Canaccord 80 National Bank K
12:11:54 V 0.63 +0.06 14,000 27 Dundee 80 National Bank K
12:00:07 V 0.65 +0.08 10,500 27 Dundee 89 Raymond James K
12:00:07 V 0.65 +0.08 9,500 27 Dundee 68 Leede K
11:59:26 V 0.65 +0.08 500 33 Canaccord 68 Leede K
11:59:26 V 0.65 +0.08 5,000 33 Canaccord 80 National Bank K
sieht lecker aus
werdet nun nicht wieder übermütig !!
vielleicht haben ein paar von euch meine Gedankenspiele zur Wertentwicklung im August gelesen
ich erwarte folgendes Szenario:
15 Mio lb Resourcen werden im 1Q06 bestätigt, Uranpreis dann bei USD 40/lb. Produktionskosten dürften hoch sein. Annahme USD15/lb (Vergleich open pit in Canada 5/lb)
Resourcenwert: 375 Mio - Abschlag 50% = 190 Mio auf 90 Mio Aktien ergibt einen Wert von 2,1 USD/Aktie oder €1,62
Produktionsbeginn 2009
Uranpreis ist auf 70/lb gestiegen. Resourcenwert 825 Mio Abschlag 25% bezogen auf 200 Mio Aktien ergibt das €2,4/Aktie
also Hartgesottene bitte einsteigen - Zittrige Finger weg!!!
wcj
vielleicht haben ein paar von euch meine Gedankenspiele zur Wertentwicklung im August gelesen
ich erwarte folgendes Szenario:
15 Mio lb Resourcen werden im 1Q06 bestätigt, Uranpreis dann bei USD 40/lb. Produktionskosten dürften hoch sein. Annahme USD15/lb (Vergleich open pit in Canada 5/lb)
Resourcenwert: 375 Mio - Abschlag 50% = 190 Mio auf 90 Mio Aktien ergibt einen Wert von 2,1 USD/Aktie oder €1,62
Produktionsbeginn 2009
Uranpreis ist auf 70/lb gestiegen. Resourcenwert 825 Mio Abschlag 25% bezogen auf 200 Mio Aktien ergibt das €2,4/Aktie
also Hartgesottene bitte einsteigen - Zittrige Finger weg!!!
wcj
Ist das die Bierdeckel-Rechnung?
na toll. doch keine 100%
bin mit 80 % raus
aber bin bei 0,35 wieder dabei
bin mit 80 % raus
aber bin bei 0,35 wieder dabei
heute gehts wieder hoch...aktull 0,45€
sieht doch gut aus. denke auch das tournigan ein langzeitinvest ist, aber auch eine möglichkeit, kurzfristig 100% mit zu nehmen.
grüße und eine schöne woche
svenja
sieht doch gut aus. denke auch das tournigan ein langzeitinvest ist, aber auch eine möglichkeit, kurzfristig 100% mit zu nehmen.
grüße und eine schöne woche
svenja
Beitrag zu dieser Diskussion schreiben
Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie eine neue Diskussion.
Meistdiskutiert
Wertpapier | Beiträge | |
---|---|---|
184 | ||
125 | ||
89 | ||
73 | ||
52 | ||
48 | ||
47 | ||
35 | ||
34 | ||
34 |
Wertpapier | Beiträge | |
---|---|---|
30 | ||
27 | ||
26 | ||
25 | ||
24 | ||
23 | ||
23 | ||
17 | ||
17 | ||
16 |