Thor Mining von 0,062 Cent auf 1 Euro sind möglich - 500 Beiträge pro Seite
eröffnet am 23.01.06 13:25:49 von
neuester Beitrag 13.04.06 17:53:55 von
neuester Beitrag 13.04.06 17:53:55 von
Beiträge: 22
ID: 1.034.637
ID: 1.034.637
Aufrufe heute: 0
Gesamt: 5.362
Gesamt: 5.362
Aktive User: 0
ISIN: GB00BRJ52319 · WKN: A3ETYE · Symbol: T5M
0,0035
EUR
-56,25 %
-0,0045 EUR
Letzter Kurs 25.04.24 Frankfurt
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,7950 | +30,33 | |
227,00 | +21,91 | |
5,1500 | +21,75 | |
29,98 | +18,24 | |
16,050 | +17,41 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,6850 | -6,80 | |
29,70 | -7,19 | |
0,8800 | -7,37 | |
0,5400 | -8,47 | |
46,59 | -98,01 |
NEWS
Regulatory Announcement
Go to market news section
Company Thor Mining PLC
TIDM THR
Headline JORC Resource Estimation
Released 07:00 23-Jan-06
Number 2242X
THOR MINING PLC
JORC compliant resource estimation
Dated: 23 January 2006
Thor Mining PLC (“Thor”) the mineral exploration and development company focussed on advancing tungsten and molybdenum projects in the Northern Territory of Australia today announced an updated JORC compliant resource estimation for the Molyhil Tungsten and Molybdenum Project (the “Molyhil Project”) following the underground mining and bulk sampling programmes carried out last year.
Highlights
· The Molyhil Project global JORC compliant resource increased to 2.4 million tonnes at 0.80% combined Tungsten (WO3 – Tungsten Oxide) and Molybdenum (MoS2 - Molybdenum Sulphide) after completion of 2005 bulk sampling programme;
· JORC compliant resource grade increased by over 50% from that of the previous indicated resource, estimated from drilling data alone;
· Global JORC compliant resource now contains 6,200 tonnes MoS2 and 13,000 tonnes WO3 representing an increase of 66% and 104% respectively;
· The Molyhil Project deposit remains open at depth with potential to increase resources with deeper drilling;
· Current prices for molybdenum and tungsten remain high; and
· Studies advanced for a 300,000 tonnes per annum mining operation with a minimum five year mine life.
The Molyhil Project – detailed resource update
The Molyhil Project is located 220km north east of Alice Springs within the prospective polymetallic province of the Proterozoic Eastern Arunta Block of the Northern Territory of Australia.
Independent geological consultant, Continental Resource Management Pty Ltd (“CRM”) has completed an updated estimation of the resources at the Molyhil Project in accordance with 2004 JORC guidelines. The resource update was based on the results of a comprehensive underground trial mining and bulk sampling programme (including the sinking of three shafts into the ore body) completed during the second half of 2005 to evaluate the true head grade and mineralogical characteristics of the deposit.
The Molyhil Project deposit consists of two adjacent outcropping iron-rich skarn bodies that contain scheelite and molybdenite mineralisation. The mineralisation is coarse-grained and its distribution is irregular. CRM used information form the recent bulk sampling programmes to update its December 2004 resource estimation.
The updated 2006 global uncut mineral resource is presented below:
UNCUT
Tonnes
WO3 %
MoS2 %
Combined %
Measured
370,000
0.52
0.32
0.85
Indicated
1,750,000
0.52
0.26
0.77
Inferred
250,000
0.7
0.2
0.9
TOTAL
2,380,000
0.54
0.26
0.80
Note: Totals may differ from sum of individual items due to rounding.
The resource with a lower block cut of 0.10% Mo-equivalent is estimated as set out in the table below. (Mo-equivalent is Mo% plus 0.25W%):
0.10% LOWER BLOCK CUT
Tonnes
WO3 %
MoS2 %
Combined %
Measured
340,000
0.57
0.35
0.92
Indicated
1,200,000
0.70
0.34
1.04
Inferred
150,000
1.1
0.3
1.4
TOTAL
1,730,000
0.70
0.34
1.04
Note: Totals may differ from sum of individual items due to rounding.
This resource has only been estimated to a depth of 150m (RL 250m). The measured resource is estimated to a depth of 45m (RL 355m).
The Molyhil Project previously had an indicated resource of 1,530,000 tonnes at 0.32% WO3 and 0.19% MoS2 (combined grade 0.52%) and an inferred resource of 500,000 tonnes at 0.25% WO3 and 0.15% MoS2 (combined grade 0.4%).
The 2005 underground exploration programme included the sinking of three shafts and cross cuts at the base of each shaft to extract bulk samples from the ore body. The samples from all cross-cuts were assayed at Australian Laboratory Services in Perth. In addition, surface bulk sampling data from three costeans were utilised.
Resource Methodology
The resources were estimated by geo-statistical interpolation using the inverse distance squared method. Block sizes were 5m x 5m x 5m for the southern body and 15m x 5m x 5m for the Yacht Club body. The resources were estimated within wire frames, constructed to contain the significant bodies of iron-rich skarn. The bulk sampling programmes demonstrated that the previous drill samples underestimated the grade of the deposit. Consequently, the grades of those parts of the deposit that were estimated solely from drill analyses have been adjusted to account for this underestimation.
Preliminary mine designs and planning will now commence and the scoping study is due to be completed in the March 2006 quarter.
JORC Compliance
CRM consents to the inclusion of the information relating to the mineral resources in this announcement in the form and context in which it appears.
Enquiries:
John W Barr
+61 418 912 885
Thor Mining PLC
Executive Chairman
John Simpson
020 7512 0191
ARM Corporate Finance Ltd
Nominated Adviser
Abigail Singleton
020 7429 6666
Conduit PR
Public Relations
Updates on the Company’s activities are regularly posted on Thor’s website, which includes a facility to register to receive these updates by email.
END
Viele werden jetzt erst darauf aufmerksam werden, dann kommen die Börsenbriefe und dann sind diejenigen, die heute eingestiegen sind um einiges reicher geworden
STRONG BUY
Regulatory Announcement
Go to market news section
Company Thor Mining PLC
TIDM THR
Headline JORC Resource Estimation
Released 07:00 23-Jan-06
Number 2242X
THOR MINING PLC
JORC compliant resource estimation
Dated: 23 January 2006
Thor Mining PLC (“Thor”) the mineral exploration and development company focussed on advancing tungsten and molybdenum projects in the Northern Territory of Australia today announced an updated JORC compliant resource estimation for the Molyhil Tungsten and Molybdenum Project (the “Molyhil Project”) following the underground mining and bulk sampling programmes carried out last year.
Highlights
· The Molyhil Project global JORC compliant resource increased to 2.4 million tonnes at 0.80% combined Tungsten (WO3 – Tungsten Oxide) and Molybdenum (MoS2 - Molybdenum Sulphide) after completion of 2005 bulk sampling programme;
· JORC compliant resource grade increased by over 50% from that of the previous indicated resource, estimated from drilling data alone;
· Global JORC compliant resource now contains 6,200 tonnes MoS2 and 13,000 tonnes WO3 representing an increase of 66% and 104% respectively;
· The Molyhil Project deposit remains open at depth with potential to increase resources with deeper drilling;
· Current prices for molybdenum and tungsten remain high; and
· Studies advanced for a 300,000 tonnes per annum mining operation with a minimum five year mine life.
The Molyhil Project – detailed resource update
The Molyhil Project is located 220km north east of Alice Springs within the prospective polymetallic province of the Proterozoic Eastern Arunta Block of the Northern Territory of Australia.
Independent geological consultant, Continental Resource Management Pty Ltd (“CRM”) has completed an updated estimation of the resources at the Molyhil Project in accordance with 2004 JORC guidelines. The resource update was based on the results of a comprehensive underground trial mining and bulk sampling programme (including the sinking of three shafts into the ore body) completed during the second half of 2005 to evaluate the true head grade and mineralogical characteristics of the deposit.
The Molyhil Project deposit consists of two adjacent outcropping iron-rich skarn bodies that contain scheelite and molybdenite mineralisation. The mineralisation is coarse-grained and its distribution is irregular. CRM used information form the recent bulk sampling programmes to update its December 2004 resource estimation.
The updated 2006 global uncut mineral resource is presented below:
UNCUT
Tonnes
WO3 %
MoS2 %
Combined %
Measured
370,000
0.52
0.32
0.85
Indicated
1,750,000
0.52
0.26
0.77
Inferred
250,000
0.7
0.2
0.9
TOTAL
2,380,000
0.54
0.26
0.80
Note: Totals may differ from sum of individual items due to rounding.
The resource with a lower block cut of 0.10% Mo-equivalent is estimated as set out in the table below. (Mo-equivalent is Mo% plus 0.25W%):
0.10% LOWER BLOCK CUT
Tonnes
WO3 %
MoS2 %
Combined %
Measured
340,000
0.57
0.35
0.92
Indicated
1,200,000
0.70
0.34
1.04
Inferred
150,000
1.1
0.3
1.4
TOTAL
1,730,000
0.70
0.34
1.04
Note: Totals may differ from sum of individual items due to rounding.
This resource has only been estimated to a depth of 150m (RL 250m). The measured resource is estimated to a depth of 45m (RL 355m).
The Molyhil Project previously had an indicated resource of 1,530,000 tonnes at 0.32% WO3 and 0.19% MoS2 (combined grade 0.52%) and an inferred resource of 500,000 tonnes at 0.25% WO3 and 0.15% MoS2 (combined grade 0.4%).
The 2005 underground exploration programme included the sinking of three shafts and cross cuts at the base of each shaft to extract bulk samples from the ore body. The samples from all cross-cuts were assayed at Australian Laboratory Services in Perth. In addition, surface bulk sampling data from three costeans were utilised.
Resource Methodology
The resources were estimated by geo-statistical interpolation using the inverse distance squared method. Block sizes were 5m x 5m x 5m for the southern body and 15m x 5m x 5m for the Yacht Club body. The resources were estimated within wire frames, constructed to contain the significant bodies of iron-rich skarn. The bulk sampling programmes demonstrated that the previous drill samples underestimated the grade of the deposit. Consequently, the grades of those parts of the deposit that were estimated solely from drill analyses have been adjusted to account for this underestimation.
Preliminary mine designs and planning will now commence and the scoping study is due to be completed in the March 2006 quarter.
JORC Compliance
CRM consents to the inclusion of the information relating to the mineral resources in this announcement in the form and context in which it appears.
Enquiries:
John W Barr
+61 418 912 885
Thor Mining PLC
Executive Chairman
John Simpson
020 7512 0191
ARM Corporate Finance Ltd
Nominated Adviser
Abigail Singleton
020 7429 6666
Conduit PR
Public Relations
Updates on the Company’s activities are regularly posted on Thor’s website, which includes a facility to register to receive these updates by email.
END
Viele werden jetzt erst darauf aufmerksam werden, dann kommen die Börsenbriefe und dann sind diejenigen, die heute eingestiegen sind um einiges reicher geworden
STRONG BUY
Börse LONDON
Thor Mining (THR)
Sector: Mining
Market Cap: 7.15m
Index: FTSE AIM All-Share
Recent Trades for Thor Mining (THR) Less Trades
Trade Time Date Price Volume Buy/Sell Trade Type
12:03:27 23-JAN-2006 4.15 10,000 *Buy O
11:53:33 23-JAN-2006 4.14 26,137 *Buy O
11:42:28 23-JAN-2006 4.15 30,000 *Buy O
10:39:00 23-JAN-2006 4.25 170,000 *Buy O
10:38:36 23-JAN-2006 4.25 750,000 *Buy O
10:37:44 23-JAN-2006 4.15 250,000 *Buy O
10:25:57 23-JAN-2006 4.38 250,000 *Buy O
11:14:04 23-JAN-2006 4.20 10,009 *Buy O
11:13:19 23-JAN-2006 4.13 30,000 *Buy O
10:55:04 23-JAN-2006 4.15 50,000 *Buy O
10:39:59 23-JAN-2006 4.38 45,259 *Buy O
10:12:57 23-JAN-2006 4.00 100,000 *Unknown T
09:16:16 23-JAN-2006 4.00 600,000 *Buy O
09:00:44 23-JAN-2006 4.00 250,000 *Buy O
08:50:20 23-JAN-2006 4.00 241,113 *Buy O
08:49:49 23-JAN-2006 4.00 150,000 *Buy O
08:48:47 23-JAN-2006 3.75 500,000 *Sell O
08:47:58 23-JAN-2006 4.00 124,196 *Buy O
Thor Mining (THR)
Sector: Mining
Market Cap: 7.15m
Index: FTSE AIM All-Share
Recent Trades for Thor Mining (THR) Less Trades
Trade Time Date Price Volume Buy/Sell Trade Type
12:03:27 23-JAN-2006 4.15 10,000 *Buy O
11:53:33 23-JAN-2006 4.14 26,137 *Buy O
11:42:28 23-JAN-2006 4.15 30,000 *Buy O
10:39:00 23-JAN-2006 4.25 170,000 *Buy O
10:38:36 23-JAN-2006 4.25 750,000 *Buy O
10:37:44 23-JAN-2006 4.15 250,000 *Buy O
10:25:57 23-JAN-2006 4.38 250,000 *Buy O
11:14:04 23-JAN-2006 4.20 10,009 *Buy O
11:13:19 23-JAN-2006 4.13 30,000 *Buy O
10:55:04 23-JAN-2006 4.15 50,000 *Buy O
10:39:59 23-JAN-2006 4.38 45,259 *Buy O
10:12:57 23-JAN-2006 4.00 100,000 *Unknown T
09:16:16 23-JAN-2006 4.00 600,000 *Buy O
09:00:44 23-JAN-2006 4.00 250,000 *Buy O
08:50:20 23-JAN-2006 4.00 241,113 *Buy O
08:49:49 23-JAN-2006 4.00 150,000 *Buy O
08:48:47 23-JAN-2006 3.75 500,000 *Sell O
08:47:58 23-JAN-2006 4.00 124,196 *Buy O
Um einige Punkte hervorzuheben.
"Preliminary mine designs and planning will now commence and the scoping study is due to be completed in the March 2006 quarter."
"Global JORC compliant resource now contains 6,200 tonnes MoS2 and 13,000 tonnes WO3 representing an increase of 66% and 104% respectively"
· Current prices for molybdenum and tungsten remain high; and
· Studies advanced for a 300,000 tonnes per annum mining operation with a minimum five year mine life.
DAS DING WIRD DIE ABSOLUTE RAKETE!!!!!!!!!
STRONG BUY!!!!!!!!!!
"Preliminary mine designs and planning will now commence and the scoping study is due to be completed in the March 2006 quarter."
"Global JORC compliant resource now contains 6,200 tonnes MoS2 and 13,000 tonnes WO3 representing an increase of 66% and 104% respectively"
· Current prices for molybdenum and tungsten remain high; and
· Studies advanced for a 300,000 tonnes per annum mining operation with a minimum five year mine life.
DAS DING WIRD DIE ABSOLUTE RAKETE!!!!!!!!!
STRONG BUY!!!!!!!!!!
:eekie Rakete wird bald zünden, dann gehts ab gen Norden,habe mich heute noch mal zusätzlich eingedeckt!!!
Frnzle
Frnzle
tja....hätte ich meine restliche Kohle nicht in Grizzly drinnen, würde ich mich ja durchaus auch nochmal eindecken...
Werde heute auch nochmal aufstocken!!!!
Das ist die Ruhe vor dem Sturm
Gruß Quadra
Das ist die Ruhe vor dem Sturm
Gruß Quadra
Nachdems heute bis auf 0,051 Cent nach unten ging, tut sich jetzt was! Momentan schon 0,055 Cent, also über 3% Plus! War das die Wende???
Frnzle
Frnzle
Dieses Mal könnte die Rakete starten!!!
Frnzle
Habe mir auch noch welche schnappen können.
buxte
buxte
Für alle nochmal zur Erinnerung die BV Aufnahme:
Aktie/WKN Hotline Kaufkurs Kurs dzt. Höchstkurs Performance dzt. Perfomance Top Zusatz Gewinn dzt. Gewinn Top
Thor Mining A0F48F 28.09.2005 0,057 0,049 0,076 -14,04 33,33 -701,75 1.666,67
buxte
Aktie/WKN Hotline Kaufkurs Kurs dzt. Höchstkurs Performance dzt. Perfomance Top Zusatz Gewinn dzt. Gewinn Top
Thor Mining A0F48F 28.09.2005 0,057 0,049 0,076 -14,04 33,33 -701,75 1.666,67
buxte
klär mich mal auf über dein kauderwelsch. Wollte nur ein wenig in einen wolframwert einsteigen, dass der gleich so abzwitschert wenn ich einsteige mit einer kleinen order hätte ich nicht angenommen. Doch PMI oder NTC sollten auch gut sein für einen kleinen move oder wäre ply besser ?
Schaut sehr gut aus, meine Damen und Herren, erstes Kursziel dann mal die 0,062 Cent-es heiß ja auch
von 0,062 Cent auf 1 Euro!!!
Frnzle
von 0,062 Cent auf 1 Euro!!!
Frnzle
[posting]20.903.391 von frnzle am 22.03.06 10:28:12[/posting]Wobei wir den Euro hier wohl so schnell nicht sehen werden, leider
(Antwort auf Beitrag Nr. 20.903.627 - erstellt von Tschetschinger am 22.03.06 10:37:05)
"YOU NEVER NO" Du weißt es Nie! Wenns mal los geht und ein bischen Fantasie dazu-Warten wirs ab!
Frnzle
"YOU NEVER NO" Du weißt es Nie! Wenns mal los geht und ein bischen Fantasie dazu-Warten wirs ab!
Frnzle
Antwort auf Beitrag Nr.: 20.903.668 von frnzle am 22.03.06 10:39:02
Antwort auf Beitrag Nr.: 20.932.607 von frnzle am 24.03.06 09:32:25 So, jetzt gehts langsam los, lasst die Aktie laufen und verkauft auf gar keinen Fall vor 0,30 Euro, dann schaffen wir bis nächstes Jahr auch wirklich dieses Kursziel!! die Studie ist raus und war besser als ich glaubte>>>also Thor---leg los!!! Im Plus sind wir ja schon!!
Frnzle
Frnzle
Antwort auf Beitrag Nr.: 21.069.155 von frnzle am 04.04.06 15:14:10Schnappt Euch Thor und lasst sie liegen, Kursziel zuerst mal 0,30, dann weiter auf 1 Euro!! ich glaube dran und es wird passieren, wenn Ihr auch dran glaubt und die Aktie nicht gleich wieder verkauft!
Es ist ruhig geworden um Thor Mining...ich habe dann mal eine kleine Position gekauft. Der nächste Push kommt bestimmt.
da bin ich mal gespannt wenn alle hier mal merken wie Unterbewertet wir hier sind...
zieht an!!!!!!!!!!!
Antwort auf Beitrag Nr.: 21.174.604 von Puschel2004 am 12.04.06 13:55:01puschl auch hier zu treffen. Sieh da !
Denke über PMI oder Tiberon nach, könnten interessant werden.
Aber bei Thor bleib ich dran die sollten doch bald mal abzwitschern bei diesen nEWS:
Denke über PMI oder Tiberon nach, könnten interessant werden.
Aber bei Thor bleib ich dran die sollten doch bald mal abzwitschern bei diesen nEWS:
Beitrag zu dieser Diskussion schreiben
Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie eine neue Diskussion.
Investoren beobachten auch:
Wertpapier | Perf. % |
---|---|
-2,30 | |
-7,69 | |
-1,29 | |
-1,47 | |
0,00 | |
-87,00 | |
+5,13 | |
-98,00 | |
0,00 | |
+1,56 |
Meistdiskutiert
Wertpapier | Beiträge | |
---|---|---|
240 | ||
107 | ||
82 | ||
78 | ||
75 | ||
53 | ||
41 | ||
38 | ||
36 | ||
34 |
Thor Mining von 0,062 Cent auf 1 Euro sind möglich