checkAd

    Hambledon Mining - Gold in Kasachstan. Unentdeckt und mal mit EXETER verglichen. - 500 Beiträge pro Seite

    eröffnet am 28.03.06 10:41:21 von
    neuester Beitrag 01.07.06 08:52:12 von
    Beiträge: 27
    ID: 1.050.259
    Aufrufe heute: 0
    Gesamt: 2.941
    Aktive User: 0

    ISIN: GB00B015PT76 · WKN: A0B604
    0,0085
     
    EUR
    -5,56 %
    -0,0005 EUR
    Letzter Kurs 29.09.18 Tradegate

     Durchsuchen

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 28.03.06 10:41:21
      Beitrag Nr. 1 ()
      Hi zusammen,

      ich möchte mal heute zum ersten mal eine Aktie vorstellen, die in Deutschland absolut unentdeckt geblieben ist. D.H. für mich eine Chance vor den Massenumsätzen dabei zu sein.

      Es geht um einen Gold/Silber Explorer und bald Produzent – Hambledon Mining ISIN GB00B015PT76.
      Heimatbörse ist London. Alle Projekte sind in Kasachstan. Für das größte Projekt in der, noch zu Sovietzeiten erzreichen und –produktiven, Region um Ust-Kamenogorsk. Somit ist die Infastruktur für die Produktion vorhanden. Für das vierte Quartal 2006 ist die Eröffnung einer Miene und Produktionsstart angekündigt. Im Februar gab es eine KE, die jetzt auch schon verdaut sein dürfte.

      Auf der Homepage www.hambledon-mining.com sind resourcen mit insgesamt 3,5 Mio unzen, am Hauptprojekt Sekisovskoye allein 2,8 Mio unzen. In Kürze werden neue Bohrergebnisse aus dem Bohrprogramm 2005 erwartet.

      Die HP ist sehr informativ und für weitere infos empfehlenswert.


      P.S.: Ich wollte ganz vorsichtige Vergleiche finden, um zu sehen wie Hambledon im Vergleich zu manchen kanadischen Explorer abschneidet. Vor Kurzem gab es vom Bullvestor eine Vergleich zwischen EXETER und Viceroy.

      Dort sind folgende Daten aufgeführt dazu Hambledon als Vergleich:

      Marktwert:

      Exeter: Ca. 85 Millionen CAD

      Viceroy: Ca. 350 Millionen CAD

      Hambledon ca. 95 Millionen CAD


      Hauptprojekt;

      Exeter – La Cabeza: Rund 900.000 Unzen in den Kategorien „indicated“ und „inferred“.

      Viceroy: Rund zwei Millionen Unzen in den Kategorien „measured“, „indicated“ und „inferred“

      Hambledon: Sekisowskoye 2,8 Millionen Unzen in allen Kategorien und Produktionsstart noch in diesem Jahr.


      Ich möchte hier nicht die Kursziele von Bullvestor nennen und meine eigene für mich behalten. Ich denke, dass die Aktie einen ordentlichen Aufholpotenzial hat, wenn sie denn mal vom Markt entdeckt wird. In Deutschland sind die ask-Kurse gewohnt überzogen, es würde also Sinn machen in London zu kaufen.

      Würde mich auf Meinungen, Gegenstimmen und Infos von euch freuen.
      Avatar
      schrieb am 29.03.06 16:11:13
      Beitrag Nr. 2 ()
      übrigens werden die anfänglichen 30.000 oz/a auf 100.000 erhöht durch weitere unterirdische Produktion.
      Das Management geht von einem sehr risikoarmen Projekt aus, weil man mitten in der dazu geeigneten infastruktur liegt.
      Avatar
      schrieb am 31.03.06 01:28:53
      Beitrag Nr. 3 ()
      mit was für spreads muss ich da rechnen in deutschland england ordern ist auch sehr teuer
      Avatar
      schrieb am 31.03.06 12:50:58
      Beitrag Nr. 4 ()
      Antwort auf Beitrag Nr.: 21.020.926 von addicted am 31.03.06 01:28:53in Berlin stehen gerade 20.000 stück für 0,203 euro im orderbuch. Der aktuelle ask in London ist ca. 0,193 Euro. In berlin/frankfurt würde ich es versuchen unter 0,2 reinzukommen, dann wäre der aufschlag wirklich nicht die welt.
      Avatar
      schrieb am 31.03.06 16:00:40
      Beitrag Nr. 5 ()
      kauf besser in London,da gibt`s mindestens die umsatzen wenn du von die aktien loswerden willst.

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1900EUR +2,98 %
      Aktie kollabiert! Hier der potentielle Nutznießer! mehr zur Aktie »
      Avatar
      schrieb am 31.03.06 16:52:02
      Beitrag Nr. 6 ()
      ich zahl in england 60pfund gebühren hat mir die codi tante gesagt
      Avatar
      schrieb am 01.04.06 19:00:54
      Beitrag Nr. 7 ()
      am sommer hat Hambledon versprochen im erstem halbjahr mit Produktion zu starten. Und jetzt am 4 quartal.?
      Avatar
      schrieb am 13.04.06 14:08:58
      Beitrag Nr. 8 ()
      gestern gab es in London 2 fette trades, und ein tagesvolumen von über 3 mio aktien.. auch charttechnisch sollte es im april eine andere richtung als seitwerts einschlagen. 'ne gute news bräuchte man.
      Avatar
      schrieb am 13.04.06 19:17:15
      Beitrag Nr. 9 ()
      Antwort auf Beitrag Nr.: 21.191.392 von Kennet am 13.04.06 14:08:58wieviel zahlt ihr in england fuer ne order
      Avatar
      schrieb am 21.04.06 13:57:16
      Beitrag Nr. 10 ()
      gestern auch wieder über 4 Mio Umsatz! ich denke, wenn jetzt ein schritt nach oben gemacht wird, sind die nächsten tage/wochen optimal dafür.. auch charttechnisch, falls man bei so einer aktie ct eine roll spielen kann.!



      addicted,
      in London sind das insgesamt bei der postbank ca. 70euro
      Avatar
      schrieb am 26.04.06 10:18:01
      Beitrag Nr. 11 ()
      +10% bei über 1 Mio shares in London. Hoffentlich hält es noch auf sk-basis. Wie erwähnt sollte hier zum ende april was tun.
      Avatar
      schrieb am 26.04.06 10:59:11
      Beitrag Nr. 12 ()
      und das ist der grund dafür:

      RNS Number:9882B
      Hambledon Mining PLC
      26 April 2006

      HAMBLEDON MINING PLC


      Permit received for development of Sekisovskoye


      Project Update


      Hambledon Mining Plc ("Hambledon"), the AIM-listed mining and exploration company developing precious metal deposits in Kazakhstan, announces that the State Commission for Mineral Reserves of the Republic of Kazakhstan has approved the General Resource Estimate of reserves at the central zones of the
      Sekisovskoye gold deposit, together with various associated mining parameters as submitted by Hambledon's 100% owned subsidiary, TOO Sekisovskoye ("Company").

      Highlights:

      •General Resource Estimate at Sekisovskoye has been approved by the State Commission for Mineral Reserves of the Republic of Kazakhstan


      •Underground drilling programme of more than 4,000m at Sekisovskoye completed - significant new mineralisation identified


      •Four 45 tonne BelAZ haul trucks delivered to mine site out of an eventual total of seven


      •Two Hitachi Zaxis 850H excavators en route from Vladivostok to the mine
      site; expected to arrive next week


      •Manufacture of crushers and related equipment substantially complete by Shenyang Sanland, China. Delivery expected in mid June


      •Ball mills under construction by JSC "Tjazhmash" in Syzran City, Russia, for delivery in early June


      •Renovation of 780 square metres of office, laboratory and kitchen facilities at Sekisovskoye now complete. Relocation of staff from Ust Kamenogorsk commenced


      •Recruitment of staff underway: more than 100 employees in place


      On schedule to commence mining in June


      Nick Bridgen, Chief Executive of Hambledon Mining Plc, commented:

      "The preparation and submission of the General Resource Estimate involved a
      massive amount of work by our team of geologists over many months. We have
      received the approval much faster than we anticipated which shows that, if we
      fulfil our responsibilities, the authorities are very helpful in getting things
      done quickly. This is a fundamental step and represents the most significant and
      time consuming hurdle in the process by which mining operations in Kazakhstan
      are approved.

      "Following the raising of further equity finance in March, all the major
      equipment items have now been ordered. Other progress has been excellent, though
      the spotlight is now on how quickly the final detailed engineering work can be
      completed and approved."
      26th April 2006

      ENQUIRIES:
      Hambledon Mining Plc Tel: +7 300 733 8915
      Nicholas Bridgen, Chief Executive


      Bankside Consultants Tel: 0207 367 8888
      Michael Spriggs / Michael Padley



      General Resource Estimate

      The Kazakhstan approval process requires that an estimate of resources be
      submitted, together with mining, processing and other information, broadly
      equivalent to a western style feasibility study, for approval by the State
      Commission on Reserves. This estimate is reviewed by experts appointed by
      VosKazNedra, the appointed body in East Kazakhstan oblast, and by the Ministry
      of Energy and Mineral Resources. The effect of the approval is that the
      resources have been entered into the State Balance and allows the Company to
      progress to the mining stage of the subsoil use contract.


      This is a fundamental step and represents the most significant and time
      consuming hurdle in the process by which mining operations in Kazakhstan are
      approved. Further approvals will still be required, principally concerning the
      environmental impact, the tailings dam and detailed design.


      The approved resources of the central Sekisovskoye zones amount to 827,000
      ounces (gold equivalent) of which 482,000 ounces are in the category C1 and
      345,000 ounces are in category C2. The estimate is based on the geological
      information to hand at the date of submission and excludes the results of the
      underground drilling programme that has just been completed.


      This approval does not affect the resources which the Company reports on a
      Western JORC basis. Analysis of the results of recent drilling is ongoing and a
      revised open pit resource and reserve, on a Western JORC basis, will be
      announced in due course.


      Underground drilling programme

      Over the winter period December to March the company completed a 4,000 metre
      underground drilling programme from the existing 441 (adit) level of the
      Sekisovskoye deposit. The purpose of the programme was to further define the
      mineralisation at the deeper levels of the proposed open pit. All gold assays
      have now been received and a new resource model of the open pit zone is being
      prepared. Significant new mineralisation has been intercepted but the effect on
      the overall open pit resource is not yet known.


      Equipment procurement

      Following the raising of further equity finance in March all the major equipment
      items have now been ordered. Four (out of an eventual total of seven) BelAZ 45
      tonne haul trucks have been delivered to the mine site and two Hitachi Zaxis
      850H (85 tonne) excavators are already in transit from Vladivostok by rail. The
      excavators are expected to arrive at the mine site in about a week and will be
      used for site preparation prior to the start-up of mining in June. The two main
      ball mills have been ordered from JSC "Tjazhmash" in Syzran City, Russia, with
      delivery scheduled for early June. Shenyang Sanland, the Chinese manufacturers
      of the crushers and related equipment have notified the Company that the
      equipment is substantially complete and will be ready for despatch in May with
      expected arrival on site in mid June.


      Engineering

      Following the earlier than expected approval of the General Resource Estimate,
      the critical path has now moved to completion of detailed engineering design.
      This work was originally intended to have been partly carried out in Perth,
      Australia, but delays due to the lack of availability of design engineers have
      caused the Company to source more of the work locally. Good engineers have been
      located but similar delays are now being experienced in Kazakhstan. The Project
      does remain on schedule but firm completion dates have not yet been established.


      Mine planning

      Mine planning was previously undertaken on the basis of the former resource
      estimates existing prior to the underground drilling programme. Updated mine
      planning will begin on the basis of the new resource estimates now under
      preparation as well as the current higher gold price.


      Office and laboratory facilities

      The company has acquired a disused building of 1,350 square metres (plus
      basement) in the village of Sekisovka, about a kilometre from the mine site, for
      use as offices, kitchen facilities and assay laboratory. Up to now, the
      Company's employees have been housed in offices in Ust Kamenogorsk, 40 km from
      the mine site, with only a residential house for use as a site exploration
      office. The first stage of renovation, including the roof, services and 780
      square metres of office space, has been completed and the transfer of staff has
      begun. A separate wing of the building is to be prepared for use as a laboratory
      for assay of grade control samples during mining operations. Appropriate
      equipment for sample preparation and assaying has been ordered.


      Recruitment

      The company has been recruiting appropriate staff and workers to carry the
      project forward into the operating phase. Since the beginning of 2005, the
      complement has moved from just 20 employees to the current level of over 100.
      Most senior positions have now been filled with well qualified and experienced
      local personnel. The full complement is expected to total over 250.



      Note for editors'

      About Hambledon Mining plc

      Hambledon Mining plc is an AIM listed mining and exploration company which has
      announced the development of an open-pit project at its Sekisovskoye deposit in
      East Kazakhstan, prior to the development of the much larger underground
      resources. Initial production from the open-pit is expected to be around 40,000
      - 45,000 ounces per annum, rising to over 100,000 ounces when the higher grade
      underground ore is processed.

      The Company also holds the rights to and is exploring the adjacent Tserkovka
      deposit and has been notified that it is to be awarded the nearby Glinka and
      Krugliachka areas. Any ore from these areas is expected to be treated in an
      expanded plant at Sekisovskoye.

      ENDS
      Avatar
      schrieb am 26.04.06 12:15:54
      Beitrag Nr. 13 ()
      kann jemand den betrag auf deutsch zusammenfassen.danke
      Avatar
      schrieb am 26.04.06 12:19:50
      Beitrag Nr. 14 ()
      habe Beitrag nicht betrag gemeint
      Avatar
      schrieb am 26.04.06 12:53:07
      Beitrag Nr. 15 ()
      Kann jemand mal den aktuellen Kurs in London einstellen?


      sampler;)
      Avatar
      schrieb am 26.04.06 13:31:16
      Beitrag Nr. 16 ()
      Antwort auf Beitrag Nr.: 21.327.143 von sampler am 26.04.06 12:53:07As at 26-Apr-2006 12:14:24
      14.750 +1.50 +11.32%

      Bid Offer Volume High Low Last Close
      14.50 15.00 5,385,754 15.00 13.25 13.25 on 25-Apr-2006
      Avatar
      schrieb am 26.04.06 13:40:25
      Beitrag Nr. 17 ()
      Antwort auf Beitrag Nr.: 21.326.516 von rauten am 26.04.06 12:15:54- die bewertung der resourcen wurde officiel bestätigt

      - die bohrungen in der geplanten untergrund-mine haben neue signifikante goldgehalte identifiziert

      - die Infrastruktur ist so gut wie eingerichtet: es wurde schwere technik angeliefert, räumliche einrichtugen geschaffen und über 100 mitarbeiter engagiert.

      - im Juni ist der Start der Mine geplant
      Avatar
      schrieb am 26.04.06 14:43:53
      Beitrag Nr. 18 ()
      Antwort auf Beitrag Nr.: 21.327.982 von Kennet am 26.04.06 13:40:25Danke!


      sampler;)
      Avatar
      schrieb am 26.04.06 17:51:08
      Beitrag Nr. 19 ()
      danke KENNET.ich habe das ding noch im marz gekauft,als du erste mal auf das wert aufmerksam gemacht.
      Avatar
      schrieb am 26.04.06 21:57:09
      Beitrag Nr. 20 ()
      Antwort auf Beitrag Nr.: 21.333.082 von rauten am 26.04.06 17:51:08kein problem, rauten. freue mich ja auch, vielleicht klappt es ja auch weiterhin mit dem kurs, langsam aber sicher..
      heute war ein guter tag..

      As at 26-Apr-2006 20:40:04
      15.250 +2.00 +15.09%

      Bid Offer Volume High Low Last Close
      15.00 16.00 7,299,485 16.00 13.25 15.25 on 26-Apr-2006
      Avatar
      schrieb am 27.04.06 22:23:37
      Beitrag Nr. 21 ()
      heute wieder ein sehr interessanter und vor allem umsatzreicher tag hier.. man scheint sich positionieren zu wollen.

      As at 27-Apr-2006 21:02:42
      15.500 +0.25 +1.64%


      Bid Offer Volume High Low Last Close
      15.00 16.00 8,346,504 15.75 15.10 15.50 on 27-Apr-2006


      Last 5 trades

      Time/Date Price Volume Trade value Type
      16:28:24 27-Apr-2006 15.67 3,200,000 501,331.20 Single protected transaction
      16:07:33 27-Apr-2006 15.75 50,000 7,875.00 Ordinary Trade
      16:06:39 27-Apr-2006 15.50 1,122,792 174,032.76 Single protected transaction
      15:56:24 27-Apr-2006 15.64 3,000 469.20 Ordinary Trade
      15:24:39 27-Apr-2006 15.25 490,000 74,725.00 Ordinary Trade

      ziemlich fette pakete dabei..:rolleyes:
      Avatar
      schrieb am 28.04.06 12:37:44
      Beitrag Nr. 22 ()
      ..und auch heute wieder ein guter tag..:)

      +11% aktuell auf 17,25 Bp und knapp 2 Mio Umsatz. Darunter wieder ein 1 Mio-shares-trade.

      onvista zeigt seit heute eine notierung auf NASDAQ Other OTC..:confused: finde aber keine infos darüber..
      Avatar
      schrieb am 02.05.06 12:37:52
      Beitrag Nr. 23 ()
      auch auf die gefahr hin, dass hier den alleinunterhalter abgebe, möchte ich einen weiteren erfreulichen tag nicht unkommentiert verstreichen lassen.

      Börse London aktuell:

      HAMBLEDON MNG | Currency GBX
      All data delayed by at least 15 minutes

      As at 02-May-2006 11:10:08
      18.250 +1.25 +7.35%

      Bid Offer Volume High Low Last Close
      18.00 18.50 6,069,383 18.50 17.21 17.00 on 01-May-2006

      die Millionenumsätze der letzten tage lassen hoffen, dass die aktie für die zukunft an bekannheit gewonnen hat.


      So scheint zumindest die kurzfristige Spekulation aufgegangen zu sein. In gut einem Monat könnte man heute einen gewinn von 40% realisieren.:lick: Und das ganze war irgendwie abzusehen..:rolleyes::)
      ich möchte allerdings mind. 1 jahr investiert bleiben.;)
      Avatar
      schrieb am 23.06.06 20:04:17
      Beitrag Nr. 24 ()
      fast unbeeindruckt vom rückgängigen Goldpreis und schwachen Marktumfeld hält sich HMB weiterhin sehr gut und bringt ergebnisse..


      http://www.londonstockexchange.com/LSECWS/IFSPages/MarketNew…
      Avatar
      schrieb am 24.06.06 10:33:51
      Beitrag Nr. 25 ()
      Antwort auf Beitrag Nr.: 22.252.275 von Kennet am 23.06.06 20:04:17Hallo Kennet,
      erstmal Danke für deine Infos, HMB erscheint mir sehr interessant.
      Damit du nicht den Alleinunterhalter spielen mußt;), ein paar Fragen von mir:

      Wie sieht es mit den Produktionskosten pro Unze aus?
      Gibt es steuerliche oder staatliche Besonderheiten die auf HMB
      Auswirkungen haben?
      Wie ist das Management zu beurteilen?
      Ist mit staatlichen Eingriffen oder Auflagen bezüglich Umwelt bzw. Naturschutz etc. zu rechnen?

      Ich hoffe das sind jetzt nicht zu viel Fragen auf einmal.

      Gruß McNay
      Avatar
      schrieb am 26.06.06 20:00:05
      Beitrag Nr. 26 ()
      Antwort auf Beitrag Nr.: 22.255.288 von McNay am 24.06.06 10:33:51hi mc,

      die produktionskosten belaufen sich auf ca.240-280 $/unze. Stand in irgendeiner veröffentlichung aus dem letzten jahr, die auf der page (www.hambledon-mining.com) gesammelt sind.

      Allgemein was die bürokratie betrifft ist deutschland nichts im vergleich mit kasachstan. steuern und auflagen gibt es in unmengen dort, aber es scheint alles beigelegt zu sein. In der vorletzen veröffentlichung stand, dass der staat das betreiben der mine genehmigt hat und die BE bestätigt hat.

      Mit management habe ich mich nicht beschäftigt, ein paar kasachen sind dabei, das ist die hauptsache, weil sie dann auch die connections haben werden.

      wegen umwelt kann ich auch nur meine subjektive meinung äußern. ich denke, dass die frage dort diesbezüglich nicht aufkommt. die gegend um Ust-Kamenogorsk ist seit frühen sowjetzeiten die wichtigste region kasachstans gewesen, was die förderung und verarbeitung von metallen betrifft. Die infastruktur wie schon mehrmals erwähnt ist eingerichtet, wenn auch nicht auf dem neuesten stand. Man wird aber IMO so traurig es klingt nur ausbeuten ohne ein rad erfinden zu wollen oder müssen.

      soweit dazu..
      gruß Kennet
      Avatar
      schrieb am 01.07.06 08:52:12
      Beitrag Nr. 27 ()
      Antwort auf Beitrag Nr.: 22.285.790 von Kennet am 26.06.06 20:00:05Hi Kennet!
      Danke für deine Info!
      Ich habe mir gestern mal die Homepage reingezogen.
      Klingt soweit alles vielversprechend.
      Auch der Kurs geht schön Richtung Norden.
      Was mir gut gefällt, das im Management auch ein paar Kasachen sitzen.
      Die Bewertung ist natürlich gemessen an anderen Klitschen ein Witz!
      Muß aber auch berücksichtigen, das es einen Risikoabschlag bei der Bewertung gibt, da Kanada, Australien und Co.in der politischen und rechtlichen Sicherheit doch etwas unterschiedlicher zu beurteilen sind als Kasachstan.
      Aber im großen und ganzen ein feiner Wert mit genügend Potentzial wie ich finde.

      Gruß und ein schönes WE


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.

      Investoren beobachten auch:

      WertpapierPerf. %
      0,00
      Hambledon Mining - Gold in Kasachstan. Unentdeckt und mal mit EXETER verglichen.