Gulf Keystone Irak-Ölperle Deutschland schläft (Seite 106)
eröffnet am 25.08.09 11:36:58 von
neuester Beitrag 14.04.24 23:30:32 von
neuester Beitrag 14.04.24 23:30:32 von
Beiträge: 1.198
ID: 1.152.605
ID: 1.152.605
Aufrufe heute: 4
Gesamt: 182.361
Gesamt: 182.361
Aktive User: 0
ISIN: BMG4209G2077 · WKN: A2DGZ5 · Symbol: GVP1
1,3000
EUR
+0,46 %
+0,0060 EUR
Letzter Kurs 09:14:27 Tradegate
Neuigkeiten
18.04.24 · EQS Group AG |
28.02.24 · EQS Group AG |
Werte aus der Branche Öl/Gas
Wertpapier | Kurs | Perf. % |
---|---|---|
21,990 | +90,22 | |
6,0800 | +43,06 | |
0,5070 | +31,52 | |
0,6100 | +15,09 | |
4,6200 | +10,00 |
Wertpapier | Kurs | Perf. % |
---|---|---|
14,190 | -5,40 | |
437,25 | -5,48 | |
4,5200 | -5,64 | |
15,570 | -7,32 | |
1.050,01 | -14,28 |
Beitrag zu dieser Diskussion schreiben
...
Im April 1927 begann die Turkish Petroleum Company mit dem Bohren von 2 Wells bei Palkhana und 4 an anderen Stellen, darunter 1 bei Kirkuk. Nur eine Bohrung findet Öl. Es ist der 14. Oktober 1927, als aus dem Bohrloch Baba Gurgur („Father of Flames“) No.1 eine riesige Ölfontäne in den Himmel schiesst. 9 Tage lang ergiessen sich pro Tag 95.000 Barrel (36 API, 2% Schwefelanteil) in die Umwelt, bevor man das Bohrloch verschliessen kann. Das riesige Kirkuk Ölfeld ist entdeckt.
...
Im April 1927 begann die Turkish Petroleum Company mit dem Bohren von 2 Wells bei Palkhana und 4 an anderen Stellen, darunter 1 bei Kirkuk. Nur eine Bohrung findet Öl. Es ist der 14. Oktober 1927, als aus dem Bohrloch Baba Gurgur („Father of Flames“) No.1 eine riesige Ölfontäne in den Himmel schiesst. 9 Tage lang ergiessen sich pro Tag 95.000 Barrel (36 API, 2% Schwefelanteil) in die Umwelt, bevor man das Bohrloch verschliessen kann. Das riesige Kirkuk Ölfeld ist entdeckt.
...
Antwort auf Beitrag Nr.: 39.931.766 von Coxos am 05.08.10 08:36:24
ja, nirgends auf der welt dauert es so lange
scheinen wirklich extreme geologische formationen zu sein
aber wie die ergebnisse beweisen
liegt dort jede menge öl
ich kenne nicht viele firmen
die solche flow rates pro well on shore berichten
bei den den flow rates
können sie auch ruhig länger bohren
dafür müssen andere 10-100 wells bohren
um diese rate zu erreichen
heutige news
Gulf Keystone Petroleum Ltd. (AIM: GKP)
("Gulf Keystone" or "the Company")
Jurassic Zone Testing on the Shaikan-1 Discovery Well
Gulf Keystone announces the results of further testing of the Butmah (1783m to 1814m) section of the Jurassic on its Shaikan-1 discovery well. Final production rates during this week's re-test were measured at 4650 bopd with an API gravity of 17.68 degrees and a gas oil ratio of 34 standard cubic feet per barrel of oil at a flowing wellhead pressure of 295 psi. This is in line with the previously estimated rate.
The Mus (1627m to 1667m) section of the Jurassic will be re-tested next, followed by the Sargelu (1450m to 1510m), which will then also be configured for long term production testing.
John Gerstenlauer, Chief Operating Officer for Gulf Keystone said "I am encouraged by this verification of the flow capacity of the Butmah formation. This test represents another step in our efforts to confirm and define the magnitude of the Shaikan discovery. The well has now demonstrated an aggregate flow capacity of over 20,000 bopd from just a fraction of the total prospective interval. I look forward to further testing and also to commercial oil sales from the long term test of the Sargelu, commencing later this year."
scheinen wirklich extreme geologische formationen zu sein
aber wie die ergebnisse beweisen
liegt dort jede menge öl
ich kenne nicht viele firmen
die solche flow rates pro well on shore berichten
bei den den flow rates
können sie auch ruhig länger bohren
dafür müssen andere 10-100 wells bohren
um diese rate zu erreichen
heutige news
Gulf Keystone Petroleum Ltd. (AIM: GKP)
("Gulf Keystone" or "the Company")
Jurassic Zone Testing on the Shaikan-1 Discovery Well
Gulf Keystone announces the results of further testing of the Butmah (1783m to 1814m) section of the Jurassic on its Shaikan-1 discovery well. Final production rates during this week's re-test were measured at 4650 bopd with an API gravity of 17.68 degrees and a gas oil ratio of 34 standard cubic feet per barrel of oil at a flowing wellhead pressure of 295 psi. This is in line with the previously estimated rate.
The Mus (1627m to 1667m) section of the Jurassic will be re-tested next, followed by the Sargelu (1450m to 1510m), which will then also be configured for long term production testing.
John Gerstenlauer, Chief Operating Officer for Gulf Keystone said "I am encouraged by this verification of the flow capacity of the Butmah formation. This test represents another step in our efforts to confirm and define the magnitude of the Shaikan discovery. The well has now demonstrated an aggregate flow capacity of over 20,000 bopd from just a fraction of the total prospective interval. I look forward to further testing and also to commercial oil sales from the long term test of the Sargelu, commencing later this year."
Antwort auf Beitrag Nr.: 39.926.767 von Diego22 am 04.08.10 14:15:286 Monate Bohrdauer und das bei einer Onshore-Bohrung?
Normal ist das nicht.Selbst Offshore-Bohrungen dauern nichtmal so lange.
@Coxos[/b
Netter Bericht,aber die Abkürzungen haben es in sich.
Normal ist das nicht.Selbst Offshore-Bohrungen dauern nichtmal so lange.
@Coxos[/b
Netter Bericht,aber die Abkürzungen haben es in sich.
Gulf Keystone Petroleum Ltd. (AIM: GKP)
("Gulf Keystone" or "the Company")
Kurdistan Operational Update:
Commencement of Drilling Operations on the Sheikh Adi-1 Exploration Well
Gulf Keystone announces the commencement of drilling operations on its Sheikh Adi-1 exploration well effective August 4, 2010. This is the first exploration well to be drilled on the Sheikh Adi Block immediately to the west of the Company's Shaikan Block, site of last year's discovery of the giant Shaikan oil field. The Company has an 80 percent working interest in the Block and is carrying the Kurdistan Regional Government's 20 percent working interest.
The well design for Sheikh Adi-1 has been modified to drill through the geopressured sections of the Triassic. This high pressure interval forced the cessation of drilling on Shaikan-1, at the point when the well experienced the inflow of significant volumes of oil and gas from this section of the Triassic. The Sheikh Adi-1 is designed to drill through the Cretaceous, Jurassic and the Triassic age rocks, to a planned total depth, depending on well results, of 3,850 meters. Drilling is expected to take 6 months. The Company's estimated oil-in-place resource potential for the Sheikh Adi structure is in excess of one billion barrels.
("Gulf Keystone" or "the Company")
Kurdistan Operational Update:
Commencement of Drilling Operations on the Sheikh Adi-1 Exploration Well
Gulf Keystone announces the commencement of drilling operations on its Sheikh Adi-1 exploration well effective August 4, 2010. This is the first exploration well to be drilled on the Sheikh Adi Block immediately to the west of the Company's Shaikan Block, site of last year's discovery of the giant Shaikan oil field. The Company has an 80 percent working interest in the Block and is carrying the Kurdistan Regional Government's 20 percent working interest.
The well design for Sheikh Adi-1 has been modified to drill through the geopressured sections of the Triassic. This high pressure interval forced the cessation of drilling on Shaikan-1, at the point when the well experienced the inflow of significant volumes of oil and gas from this section of the Triassic. The Sheikh Adi-1 is designed to drill through the Cretaceous, Jurassic and the Triassic age rocks, to a planned total depth, depending on well results, of 3,850 meters. Drilling is expected to take 6 months. The Company's estimated oil-in-place resource potential for the Sheikh Adi structure is in excess of one billion barrels.
AGM bericht von jack diamonds
The AGM galloped though the resolutions & all were passed as per the RNS. I took a few notes on what was said as follows:
FF commented on whether the SA1 rig was progressing (Last update 10% rig up complete).
TK stated that they would spud on satisfactory sign off of the rig (sign off also trigger payments to rig contractor).
Etamic payments had not been made to date & TK stated that payments would follow contract signing (RNS to follow on contracts being signed)
TPO commented on the current SP not reflecting value & what were the issues of a low ball TO
TK stated that the Company was not managed on SP. They took a "long term outlook & long term strategy". Current work program was designed to move SP to where Management thought it should be.
TK commented on current SP pressure due to PIs & not Institutions. IIs have been briefed & would defend a hostile TO ("They know the value")
MOL are slow. Genel are looking at well location on BB. Both would be funded by "Oil sales next month to domestic market"
TK no plans to divest from AB (Why should they?). Plan is to drill other wells & prove up value. Not concerned on Iraq politics & no preference for whoever gets in.
Ewen stated no existing well at SA. Estimated OIP as per genel estimate of 1.9BB.
Shaikan production is for 18K bpd. Could "react swiftly to 40k bpd" if SA produced the goods.
Regarding 165M raised 25 May, not all funds received by 01 June hence 156M cash balance. Dollar exchange rate a benefit
Genel has a 3 year agreement on BB not 2 years. Expires March 2012. Plenty of time .
Gram stated that he was unhappy with recovery factor of 30-35%.
TK stated that this was the current assumption & they were being conservative based on current data. "If we thought it was 20% we would not tell you 30%"
Shaikan was stated as being the "Crown Jewel of Kurdistan" & an economic investable project.
Algeria still in limbo. No payment from BG yet. Still waiting Govt sign off.
On a question of block boundaries TK stated East West boundaries may grow but North South unlikely to be affected. SA, BB & AB are therefore on trend.
They are looking for the "water", which could suggest a step change in value. MOL had drilled deeper than Shakian therfore RNS released regarding no water found.
Hunt data of no real interest. "Perhaps your data is more valuable than theirs"
TK stated remove the word "Perhaps"
Could the drilling rates be increased?
TK No we are in exploration. "Its not how fast you drill the wells or whether you bring them in on budget, its finding significant OIP that matters"
Summed up by stating that the Company was in "Great shape", "An interesting 12 - 18 months ahead" & "passionate about my baby"
All IMHO
Great day & good to meet the team. Many conspiracy theories just fell away
IMHO good mid to long term prospect
Jack
The AGM galloped though the resolutions & all were passed as per the RNS. I took a few notes on what was said as follows:
FF commented on whether the SA1 rig was progressing (Last update 10% rig up complete).
TK stated that they would spud on satisfactory sign off of the rig (sign off also trigger payments to rig contractor).
Etamic payments had not been made to date & TK stated that payments would follow contract signing (RNS to follow on contracts being signed)
TPO commented on the current SP not reflecting value & what were the issues of a low ball TO
TK stated that the Company was not managed on SP. They took a "long term outlook & long term strategy". Current work program was designed to move SP to where Management thought it should be.
TK commented on current SP pressure due to PIs & not Institutions. IIs have been briefed & would defend a hostile TO ("They know the value")
MOL are slow. Genel are looking at well location on BB. Both would be funded by "Oil sales next month to domestic market"
TK no plans to divest from AB (Why should they?). Plan is to drill other wells & prove up value. Not concerned on Iraq politics & no preference for whoever gets in.
Ewen stated no existing well at SA. Estimated OIP as per genel estimate of 1.9BB.
Shaikan production is for 18K bpd. Could "react swiftly to 40k bpd" if SA produced the goods.
Regarding 165M raised 25 May, not all funds received by 01 June hence 156M cash balance. Dollar exchange rate a benefit
Genel has a 3 year agreement on BB not 2 years. Expires March 2012. Plenty of time .
Gram stated that he was unhappy with recovery factor of 30-35%.
TK stated that this was the current assumption & they were being conservative based on current data. "If we thought it was 20% we would not tell you 30%"
Shaikan was stated as being the "Crown Jewel of Kurdistan" & an economic investable project.
Algeria still in limbo. No payment from BG yet. Still waiting Govt sign off.
On a question of block boundaries TK stated East West boundaries may grow but North South unlikely to be affected. SA, BB & AB are therefore on trend.
They are looking for the "water", which could suggest a step change in value. MOL had drilled deeper than Shakian therfore RNS released regarding no water found.
Hunt data of no real interest. "Perhaps your data is more valuable than theirs"
TK stated remove the word "Perhaps"
Could the drilling rates be increased?
TK No we are in exploration. "Its not how fast you drill the wells or whether you bring them in on budget, its finding significant OIP that matters"
Summed up by stating that the Company was in "Great shape", "An interesting 12 - 18 months ahead" & "passionate about my baby"
All IMHO
Great day & good to meet the team. Many conspiracy theories just fell away
IMHO good mid to long term prospect
Jack
nein, nur ein wildes gerücht
mit den reserven ist eine übernahme 2011-12 ziemlich sicher
mit den reserven ist eine übernahme 2011-12 ziemlich sicher
Antwort auf Beitrag Nr.: 39.880.389 von Coxos am 27.07.10 08:37:55Gibt es genaueres zu den Übernahmegerüchten?
übernahmegerüchte
in londoner boards daraufhin 1.000 postings am tag
in londoner boards daraufhin 1.000 postings am tag
Warum dieser plötzlicher Kurs-und Umsatzanstieg?Da wird wohl bald der Beginn der Produktion vermeldet werden?!
Gulf Keystone Irak-Ölperle Deutschland schläft