Aurcana, Silberproduzent mit enormen Potential (Seite 955)
eröffnet am 16.12.09 22:45:33 von
neuester Beitrag 04.07.22 12:35:28 von
neuester Beitrag 04.07.22 12:35:28 von
Beiträge: 9.905
ID: 1.154.884
ID: 1.154.884
Aufrufe heute: 0
Gesamt: 1.158.970
Gesamt: 1.158.970
Aktive User: 0
ISIN: CA0519188035 · WKN: A2PBDG · Symbol: UHY0
0,0099
EUR
+70,69 %
+0,0041 EUR
Letzter Kurs 09.09.22 Tradegate
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,7950 | +30,33 | |
13,170 | +15,32 | |
46,82 | +12,12 | |
41,11 | +9,98 | |
1,4000 | +8,95 |
Wertpapier | Kurs | Perf. % |
---|---|---|
103,80 | -9,50 | |
5,6750 | -9,56 | |
0,6800 | -15,00 | |
4,2300 | -17,86 | |
0,9000 | -25,00 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 40.905.970 von Dicker69 am 21.01.11 21:16:52NEWS:
http://www.aurcana.com/s/NewsReleases.asp?ReportID=439022&_T…
Übersetzt:
Freitag Jan 21, 2011
Aurcana Fängt Aufbau an Shafter Meinigem Silber An
VANCOUVER, DAS BRITISCHE COLUMBIA - (Marketwire - am 21. Januar 2011) - ist Aurcana Vereinigung (TSX VENTURE:AUN) ("Aurcana" oder die "Gesellschaft") zufrieden bekannt zu geben, dass Arbeit auf besessenem Shafter Silber der 100 Prozent angefangen hat, das Meinig, in der Presidio Grafschaft, das südwestliche Texas gelegen ist. Die Seite-Zufahrtstraße, ist geotechnical befördert worden, und Überblick-Arbeit, ist und Pflanzenseite laufend, und Pforterdwälle sind auf der vor dem April zu vollendenden Spur. Das Portal schnitt für den Niedergang wird gesprengt und im Februar ausgegraben. Der erste Satz der neuen und wieder aufgebauten Untergrundbahn-Bergwerksausrüstung ist gekauft worden und steht auf dem Plan, um auf der Seite zu sein, um zu minieren, um im Abstieg Anfang März anzufangen.
Schlüssel ist älteres Verwaltungspersonal angestellt worden und ist auf der Seite. Alle Bauerlaubnisse sind im Platz. Alle langen Leitungssachen wie die 14 ft Kugelmühle und tailings Filterpressen sind gesichert worden und stehen auf dem Plan, um renoviert zu werden. Ein 5-jähriger von - nimmt Vertrag ist mit der Regionalmacht-Versorgungsgesellschaft unterzeichnet worden, um die elektrische Hilfsstation zu befördern, die Macht für die Operation des meinigen und der Mühle zur Verfügung stellen wird.
Eine Boden-Brechen-Zeremonie mit einer ersten Druckwelle und mehreren Gästen steht zum 16. Februar 2011 auf dem Plan.
Das Shafter Meinige Silber steht auf dem Plan, um Silberproduktion Mitte 2012 anzufangen, die, wie man schätzt, 3.8 Millionen Unzen pro Jahr an einer Bergwerksproduktionsrate von 1.500 Tonnen pro Tag Erzes erzeugt, das 8-Unze-Silber pro Tonne sortiert. Shafter hat einen NI 43-101 entgegenkommende Quelle von Gemessenen 24.6 Millionen Unzen, und Angezeigt (wählen 2.900.000 Tonnen 8.48), Abgeleitete 22.8 Millionen Unzen (2.167.000 10.52 wählen) (das Verwenden eines 4.0 wählen abgeschnitten). Aufbau steht auf dem Plan, um 18 Monate zu nehmen.
Über die Aurcana Vereinigung:
Aurcana wird begangen, um eine Mitte Reihe-Silbererzeuger zu werden. Auf Jahresbasis umgerechnete reine Silberproduktion ist auf der Liste, um 5 Millionen Unzen (Silberentsprechung von 6.0 Millionen Unzen) vor dem Jahr 2012 zu überschreiten.
http://www.aurcana.com/s/NewsReleases.asp?ReportID=439022&_T…
Übersetzt:
Freitag Jan 21, 2011
Aurcana Fängt Aufbau an Shafter Meinigem Silber An
VANCOUVER, DAS BRITISCHE COLUMBIA - (Marketwire - am 21. Januar 2011) - ist Aurcana Vereinigung (TSX VENTURE:AUN) ("Aurcana" oder die "Gesellschaft") zufrieden bekannt zu geben, dass Arbeit auf besessenem Shafter Silber der 100 Prozent angefangen hat, das Meinig, in der Presidio Grafschaft, das südwestliche Texas gelegen ist. Die Seite-Zufahrtstraße, ist geotechnical befördert worden, und Überblick-Arbeit, ist und Pflanzenseite laufend, und Pforterdwälle sind auf der vor dem April zu vollendenden Spur. Das Portal schnitt für den Niedergang wird gesprengt und im Februar ausgegraben. Der erste Satz der neuen und wieder aufgebauten Untergrundbahn-Bergwerksausrüstung ist gekauft worden und steht auf dem Plan, um auf der Seite zu sein, um zu minieren, um im Abstieg Anfang März anzufangen.
Schlüssel ist älteres Verwaltungspersonal angestellt worden und ist auf der Seite. Alle Bauerlaubnisse sind im Platz. Alle langen Leitungssachen wie die 14 ft Kugelmühle und tailings Filterpressen sind gesichert worden und stehen auf dem Plan, um renoviert zu werden. Ein 5-jähriger von - nimmt Vertrag ist mit der Regionalmacht-Versorgungsgesellschaft unterzeichnet worden, um die elektrische Hilfsstation zu befördern, die Macht für die Operation des meinigen und der Mühle zur Verfügung stellen wird.
Eine Boden-Brechen-Zeremonie mit einer ersten Druckwelle und mehreren Gästen steht zum 16. Februar 2011 auf dem Plan.
Das Shafter Meinige Silber steht auf dem Plan, um Silberproduktion Mitte 2012 anzufangen, die, wie man schätzt, 3.8 Millionen Unzen pro Jahr an einer Bergwerksproduktionsrate von 1.500 Tonnen pro Tag Erzes erzeugt, das 8-Unze-Silber pro Tonne sortiert. Shafter hat einen NI 43-101 entgegenkommende Quelle von Gemessenen 24.6 Millionen Unzen, und Angezeigt (wählen 2.900.000 Tonnen 8.48), Abgeleitete 22.8 Millionen Unzen (2.167.000 10.52 wählen) (das Verwenden eines 4.0 wählen abgeschnitten). Aufbau steht auf dem Plan, um 18 Monate zu nehmen.
Über die Aurcana Vereinigung:
Aurcana wird begangen, um eine Mitte Reihe-Silbererzeuger zu werden. Auf Jahresbasis umgerechnete reine Silberproduktion ist auf der Liste, um 5 Millionen Unzen (Silberentsprechung von 6.0 Millionen Unzen) vor dem Jahr 2012 zu überschreiten.
Antwort auf Beitrag Nr.: 40.905.970 von Dicker69 am 21.01.11 21:16:52@Dicker
Bin ja auch von der Story überzeugt...
Aber an der Börse sind machmal massive Schwankungen, die es auszunutzen gilt!
Jan 21, 2011 15:45 ETAurcana Commences Construction at Shafter Silver Mine
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Jan. 21, 2011) - Aurcana Corporation (TSX VENTURE:AUN) ("Aurcana" or the "Company") is pleased to announce that work has commenced on the 100 percent owned Shafter Silver Mine, located in Presidio County, southwest Texas. The site access road has been upgraded, geotechnical and survey work is underway, and plant site and portal earthworks are on track to be completed by April. The portal cut for the decline will be blasted and excavated in February. The first set of new and rebuilt underground mining equipment has been purchased and is scheduled to be on site for mining to commence on the decline in early March.
Key senior management personnel have been hired and are on site. All construction permits are in place. All long lead items such as the 14 ft ball mill and tailings filter presses have been secured and are scheduled to be refurbished. A 5-year off-take contract has been signed with the regional power supply company to upgrade the electrical substation which will provide power for the operation of the mine and mill.
A Ground Breaking ceremony with a first blast and a number of guests is scheduled for February 16, 2011.
The Shafter Silver Mine is scheduled to start silver production in mid-2012 which is estimated to produce 3.8 million ounces per year at a mining production rate of 1,500 tons per day of ore grading 8 ounces silver per ton. Shafter has a NI 43-101 compliant resource of 24.6 million ounces Measured and Indicated (2,900,000 tons @ 8.48 opt), 22.8 million ounces Inferred (2,167,000 @ 10.52 opt) (using a 4.0 opt cut off). Construction is scheduled to take 18 months.
About Aurcana Corporation:
Aurcana is committed to become a mid-tier silver producer. Annualized pure silver production is on schedule to exceed 5 million ounces (6.0 million ounces silver equivalent) by year 2012.
ON BEHALF OF THE BOARD OF DIRECTORS OF AURCANA CORPORATION
Lenic Rodriguez, President and C.E.O.
Bin ja auch von der Story überzeugt...
Aber an der Börse sind machmal massive Schwankungen, die es auszunutzen gilt!
Jan 21, 2011 15:45 ETAurcana Commences Construction at Shafter Silver Mine
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Jan. 21, 2011) - Aurcana Corporation (TSX VENTURE:AUN) ("Aurcana" or the "Company") is pleased to announce that work has commenced on the 100 percent owned Shafter Silver Mine, located in Presidio County, southwest Texas. The site access road has been upgraded, geotechnical and survey work is underway, and plant site and portal earthworks are on track to be completed by April. The portal cut for the decline will be blasted and excavated in February. The first set of new and rebuilt underground mining equipment has been purchased and is scheduled to be on site for mining to commence on the decline in early March.
Key senior management personnel have been hired and are on site. All construction permits are in place. All long lead items such as the 14 ft ball mill and tailings filter presses have been secured and are scheduled to be refurbished. A 5-year off-take contract has been signed with the regional power supply company to upgrade the electrical substation which will provide power for the operation of the mine and mill.
A Ground Breaking ceremony with a first blast and a number of guests is scheduled for February 16, 2011.
The Shafter Silver Mine is scheduled to start silver production in mid-2012 which is estimated to produce 3.8 million ounces per year at a mining production rate of 1,500 tons per day of ore grading 8 ounces silver per ton. Shafter has a NI 43-101 compliant resource of 24.6 million ounces Measured and Indicated (2,900,000 tons @ 8.48 opt), 22.8 million ounces Inferred (2,167,000 @ 10.52 opt) (using a 4.0 opt cut off). Construction is scheduled to take 18 months.
About Aurcana Corporation:
Aurcana is committed to become a mid-tier silver producer. Annualized pure silver production is on schedule to exceed 5 million ounces (6.0 million ounces silver equivalent) by year 2012.
ON BEHALF OF THE BOARD OF DIRECTORS OF AURCANA CORPORATION
Lenic Rodriguez, President and C.E.O.
Antwort auf Beitrag Nr.: 40.904.997 von Paphos am 21.01.11 18:04:05ja, viele vergessen die Fakten und der Silberpreis verunsichert....einfach das Körbchen aufstellen.
Aurcana wird 2012 eine der größten reinen Silbermine in der USA haben und einfach mal selber rechnen bei einen Silberpreis von 21- 25$........
La Negra Silber
1.200.000 Unzen pro Jahr Produktion ( 100.000 Unzen pro Monat )
Shafter Silber
3.900.000 Unzen pro Jahr Produktion ( 325.000 Unzen pro Monat )
hier zur Erinnerung........
Interessantes Videointerview mit Lenic Rodriguez dem CEO von Aurcana
http://www.youtube.com/user/EvenKeelMedia
Highlights daraus:
1. Private placement scheint abgeschlossen und war überzeichnet (keine wirkliche Überraschung oder?). Sie haben sich aber auf die 60 mio $ beschränkt (entspricht laut Lenic 200 % der Marktkapitalisierung, welche sich damit verdreifachen müsste)
2. Durch den deal mit Silver Wheaton müssen nun nicht mehr 50% der Einkünfte von der La negra mine an SW abgegeben werden. Daraus ergeben sich Netto Einnahmen von 1 mio $ pro Monat (ab sofort).
3. Ab 2012 rechnet Lenic mit einer Produktion von 6.5 mio Unzen jährlich und einem cash flow von >100 mio $.
4. Die Shafter Mine ist laut Schätzungen die 12 größte Silber Mine weltweit und die erst- oder zweit-größte der USA (zumindest was reine Silber-Minen angeht).
Aurcana wird 2012 eine der größten reinen Silbermine in der USA haben und einfach mal selber rechnen bei einen Silberpreis von 21- 25$........
La Negra Silber
1.200.000 Unzen pro Jahr Produktion ( 100.000 Unzen pro Monat )
Shafter Silber
3.900.000 Unzen pro Jahr Produktion ( 325.000 Unzen pro Monat )
hier zur Erinnerung........
Interessantes Videointerview mit Lenic Rodriguez dem CEO von Aurcana
http://www.youtube.com/user/EvenKeelMedia
Highlights daraus:
1. Private placement scheint abgeschlossen und war überzeichnet (keine wirkliche Überraschung oder?). Sie haben sich aber auf die 60 mio $ beschränkt (entspricht laut Lenic 200 % der Marktkapitalisierung, welche sich damit verdreifachen müsste)
2. Durch den deal mit Silver Wheaton müssen nun nicht mehr 50% der Einkünfte von der La negra mine an SW abgegeben werden. Daraus ergeben sich Netto Einnahmen von 1 mio $ pro Monat (ab sofort).
3. Ab 2012 rechnet Lenic mit einer Produktion von 6.5 mio Unzen jährlich und einem cash flow von >100 mio $.
4. Die Shafter Mine ist laut Schätzungen die 12 größte Silber Mine weltweit und die erst- oder zweit-größte der USA (zumindest was reine Silber-Minen angeht).
Antwort auf Beitrag Nr.: 40.904.997 von Paphos am 21.01.11 18:04:05Insider nehmen auch mal Gewinne mit!
Aurcana Corporation (AUN) As of January 20th, 2011
Filing Date Transaction Date Insider Name Ownership Type Securities Nature of transaction # or value acquired or disposed of Unit Price
Jan 20/11 Jan 19/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -76,000 $0.660
Jan 18/11 Jan 18/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -67,000 $0.660
Jan 18/11 Jan 18/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -2,000 $0.670
Jan 16/11 Jan 10/11 Aguirre, Adrian Direct Ownership Common Shares 10 - Disposition in the public market -53,000 $0.675
Aurcana Corporation (AUN) As of January 20th, 2011
Filing Date Transaction Date Insider Name Ownership Type Securities Nature of transaction # or value acquired or disposed of Unit Price
Jan 20/11 Jan 19/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -76,000 $0.660
Jan 18/11 Jan 18/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -67,000 $0.660
Jan 18/11 Jan 18/11 Netolitzky, Ronald Kort Direct Ownership Common Shares 10 - Disposition in the public market -2,000 $0.670
Jan 16/11 Jan 10/11 Aguirre, Adrian Direct Ownership Common Shares 10 - Disposition in the public market -53,000 $0.675
ich beginne heute nachzulegen, erste posi bei knapp über 27 usd silberkurs, dann falls silber bis auf 25 usd fallen sollte zwei weitere zukäufe, falls silber aber wieder ansteigen sollte, auch zukauf über 28 usd.
auf lange sicht (2-3 jahre) wird hier jeder longie soweso belohnt, nur geduld!
auf lange sicht (2-3 jahre) wird hier jeder longie soweso belohnt, nur geduld!
Antwort auf Beitrag Nr.: 40.902.347 von larsuwe am 21.01.11 12:49:36wie kommst Du darauf? Die Faktenlage bei Aurcana hat sich nicht geändert, ausser das der Silberpreis massiv in den Keller getrieben wird! Schaue mal genau nach,ab welcher Zeit der Silberkurse nach unter rutschen und das ist ist nicht gewollt? Aurcana macht auch bei einen Silberpreis von 21$ guten Gewinn.......
Hallo! Ich denke, das kurzfristig auch noch mal Aktienkurse um die 0,35Euro möglich sind.Dann werde ich mir noch mal welche ordern.Auch der Silberpreis könnte noch mal bis auf 25$ Dollar fallen.
Antwort auf Beitrag Nr.: 40.896.870 von Mikado84 am 20.01.11 16:49:08Papiergeld , ja es wird geklammert
nun ja, hätte ich mal mit meinem Nachkauf etwas gewartet... aber mit ein wenig wird das schon wieder drehen, oder ist Papiergeld jetzt wieder auf dem Vormarsch?
Das ist aber mal ein ordentliches Minus