checkAd

    Gatling Exploration ehemals Bonterra Res.-- die schnellen 100% im Januar 2011 und mehr % danach...

    eröffnet am 07.01.11 08:40:09 von
    neuester Beitrag 04.12.23 19:10:09 von
    Beiträge: 4.320
    ID: 1.162.562
    Aufrufe heute: 5
    Gesamt: 456.600
    Aktive User: 0

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    0,7950+30,33
    55,80+15,41
    0,7999+14,27
    11,250+12,73
    0,5500+10,00
    WertpapierKursPerf. %
    0,5100-8,93
    2,1800-9,17
    186,20-10,48
    4,2300-17,86
    46,74-98,00

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 432

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 04.12.23 19:10:09
      Beitrag Nr. 4.320 ()
      Ich glaube hier nicht mehr an den turnarround
      Bonterra Resources | 0,210 C$
      Avatar
      schrieb am 04.12.23 19:09:19
      Beitrag Nr. 4.319 ()
      Ja bin noch drin und megaenttäuscht. Bin noch in ner anderen aktie drin die haben eine mehrheitsbeteiligung an einer goldaktie da kommen immer richtig breite grade. Hier bin ich einfach nur enttäuscht da die Verluste nur schwer zu kompensieren sind. Es tritt aber ein was du seit mehreren Jahren gesagt hast
      Bonterra Resources | 0,210 C$
      Avatar
      schrieb am 04.12.23 12:12:34
      Beitrag Nr. 4.318 ()
      Bonterra Intersects 10.97 g/t Au over 10.1 m, including 16.36 g/t Au over 4.7 m on its 100% owned Desmaraisville South Project

      Val-d'Or, Quebec--(Newsfile Corp. - December 4, 2023) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce the first drill results of its 15,000 meters ("m") drill program at its Desmaraisville South project. Three diamond drill rigs have been mobilized on the project and are currently drill-testing several new geological and geophysical targets along with historical near surface gold mineralization along the edges of the O'Brien Syenite Intrusion ("O'Brien Intrusive").

      Located within three kilometers ("km") of the Bachelor Mill Complex, three different areas were drill tested for their near surface gold potential. These areas are located North, East, and South of the O'Brien Intrusive (Figure 1).

      At the Southern Area ("South Area"), several new drill targets were generated from the reinterpretation of previously intersected gold bearing structures. This reinterpretation was done with the use of the Bonterra drill hole database and the historical 3D models of high-grade gold intercepts drilled previously. Bonterra has drilled to date a total of 17 diamond drill holes (4,332 m) at the South Area (Figure 2 and Table 1).

      Highlights include:

      10.97 g/t Au over 10.1 m, including 16.36 g/t Au over 4.7 m in hole BRDS-23-018
      4.79 g/t Au over 6.3 m, including 9.03 g/t Au over 1.5 m in hole BRDS-23-016
      2.65 g/t Au over 4.2 m in hole BRDS-23-016
      Bonterra Resources | 0,148 €
      Avatar
      schrieb am 29.11.23 09:07:17
      Beitrag Nr. 4.317 ()
      Hi Sunny, bist Du auch noch hier drin.... Schau mal Osisko mischt hier nun kräftig mit ... Finde ich super


      by @newsfile on 28 Nov 2023, 19:36
      Bonterra Executes Definitive Option Agreement with Osisko Mining on Bonterra's Urban-Barry Property

      Val-d'Or, Quebec--(Newsfile Corp. - November 28, 2023) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce that it has executed a definitive earn-in and joint venture agreement (the "Agreement") with Osisko Mining Inc. ("Osisko"), further to the news release of Bonterra dated September 25, 2023 and entitled "Bonterra Announces Binding Letter Agreement for Joint Venture with Osisko Mining". Under the Agreement, Osisko has the right to acquire up to a 70% interest in the Company's Gladiator and Barry projects, in addition to the adjoining Duke and Lac Barry properties held through joint venture agreements with Osisko and Gold Royalty Corp., respectively (collectively, the "Properties"), all located in Quebec's Eeyou Istchee James Bay region and consisting of an aggregate of 496 claims over 22,508 hectares, as shown on the accompanying map.
      Bonterra Resources | 0,154 €
      Avatar
      schrieb am 12.11.23 10:51:20
      Beitrag Nr. 4.316 ()
      Oder ist an der mühle technisch etwas nicht in Ordnung sodass sie den Betrieb nicht wieder aufnehmen kann???
      Bonterra Resources | 0,119 €

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1900EUR +2,98 %
      Aktie kollabiert! Hier der potentielle Nutznießer! mehr zur Aktie »
      Avatar
      schrieb am 12.11.23 10:49:31
      Beitrag Nr. 4.315 ()
      Was ich nicht verstehe die haben eine mühle die schon produziert hatte und auch schon eine mine uns haben es nicht geschafft diese wieder in produktion zu bringen und damit Geld zu generieren. Ich hoffe das sie jetzt schnellstmöglich den produktionswiederbeginn voran treiben und endlich mal Geld generieren.
      Bonterra Resources | 0,119 €
      Avatar
      schrieb am 25.09.23 21:23:33
      Beitrag Nr. 4.314 ()
      Bonterra Resources | 0,200 C$
      Avatar
      schrieb am 25.09.23 18:06:15
      Beitrag Nr. 4.313 ()
      Was bedeuten die heutigen news für uns? Ich kann nichtspositives an der news für uns erkennen
      Bonterra Resources | 0,215 C$
      Avatar
      schrieb am 09.08.23 14:51:48
      Beitrag Nr. 4.312 ()
      :):):):)


      Bonterra Resources Announces First Gold Sale from its Bachelor Mill Cleanup

      Val-d'Or, Quebec--(Newsfile Corp. - August 9, 2023) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to report that the Bachelor Mill cleanup process has recovered 630 ounces of gold to date generating revenue of CAN$1.6 million. Gold recovery efforts continue at the mill and the Company expects additional revenue in the coming months.

      Marc-André Pelletier, President and CEO commented: "I would like to thank Bonterra's employees that are diligently working on the Bachelor Mill cleanup, especially after being evacuated on more than one occasion this summer due to forest fires. The next gold shipment is expected in Q4, and when combined with the 630 ounces already sold, revenue from the mill cleanup is expected to offset the majority of the Company's exploration activities through the end of 2023. Importantly, the Company is currently working on an updated exploration program with the objective of testing the extension of mineral resources near the Barry, Gladiator and Bachelor deposits."

      Qualified Person

      Marc-André Pelletier, P.Eng., (OIQ # 113978) President and CEO of the Company has verified and approved the information contained in this press release. Mr. Pelletier is a qualified person as defined by National Instrument 43-101 on standards of disclosure for mineral projects.

      About Bonterra Resources Inc.
      https://ceo.ca/@newsfile/bonterra-resources-announces-first-…
      Bonterra Resources | 0,161 €
      Avatar
      schrieb am 30.05.23 12:08:08
      Beitrag Nr. 4.311 ()
      https://ceo.ca/@newsfile/bonterra-intersects-82-gt-au-over-8…

      Bonterra Intersects 8.2 g/t Au over 8.2 m, Including 16.6 g/t Au over 3.4 m and 54.5 g/t Au over 0.5 m at the Barry Underground Project and Provides Operational and Exploration Updates

      Val-d'Or, Quebec--(Newsfile Corp. - May 30, 2023) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce more results from the now completed infill and expansion drilling campaign at the Barry underground project, which holds 0.5 million ounces of Measured and Indicated Mineral resources and 0.7 million ounces of Inferred Mineral resources according to the last mineral resources estimate (the "2021 MRE", see press release dated June 23, 2021). The primary goal of this campaign was to convert mineral resources to a higher confidence category and enhance the interpretation and grade continuity of the mineralization, primarily in the upper section of the deposit. In total, 31,349 metres ("m") (91 holes) of infill drilling has been completed from surface since August 2022. The Company has received assays for 89 holes so far, including the holes disclosed in this release (see press releases dated November 15, 2022, December 12, 2022, March 27, 2023, and May 1, 2023, for previously released holes). To date, 1,619 samples are pending results.

      Highlights include:

      8.2 g/t Au over 8.2 m, including 16.6 g/t Au over 3.4 m and 54.5 g/t Au over 0.5 m in hole MB-23-593A
      5.0 g/t Au over 7.2 m, including 23.0 g/t Au over 0.7 m and 16.2 g/t Au over 0.6 m in hole MB-23-599
      7.2 g/t Au over 3.7 m, including 30.0 g/t Au over 0.5 m in hole MB-23-601A
      6.4 g/t Au over 2.9 m, including 16.9 g/t Au over 1.0 m in hole MB-23-611
      Operational Updates

      In addition to the cost saving initiatives announced in November 2022 and March 2023 (see press releases dated November 23, 2022, and March 6, 2023), the Company implemented a new working schedule at the Barry site in April 2023 and expects to reduce fixed camp costs by 50% or approximately $0.5 million ("M") in 2023. Also, the Company received proceeds of $0.4 M in Q1 2023 from the rental of the Bachelor camp during the construction of the proposed Kuikuhaacheu hydroelectric power transmission line from the Waswanipi substation to the Windfall gold project, which is approximately 15 kilometers ("km") from Bonterra's Barry and Gladiator deposits. More revenue is expected for the rest of the year. Finally, the Company is currently undertaking the cleaning of the Bachelor Mill to recover the gold trapped in the circuit from past production activity. This work is expected to take place in the ensuing months and the revenue generated is expected to support the Company's exploration activities.

      Marc André Pelletier, President and CEO commented: "Several revenue-generating and cost-cutting initiatives are currently underway to bolster our operations and facilitate our renewed focus on exploration in the Urban-Barry camp. We share the same belief as our neighbors, Gold Fields and Osisko Mining, in the untapped potential for new discoveries within the Urban-Barry camp. The findings announced today provide further confirmation of the Barry deposit's depth potential, with the 800 Zone remaining open down plunge to the East. We are pleased with the progress of our ongoing drill campaigns at Panache South and Barry North-East, following our updated work schedule, and we thank our employees for their flexibility."

      Exploration Updates

      The Company has allocated one drill rig to its Barry North-East regional exploration program, which consists of eleven drill holes covering 3,200 m (See Figure 3). This program targets induced polarization anomalies along the Mazeres fault corridor, located three km to the northeast of the Barry deposit. So far, four drill holes covering 1,654 m have been completed.

      The Company also commenced a 3,500 m exploration and follow-up drill program at the Panache South target area. The program is currently testing targets North of historical showing of 12.9 g/t Au over 0.5 m and 3.2 g/t Au over 0.4 m as well as showings from the 2021 drill campaign where significant gold mineralization was intersected such as 5.5 g/t Au over 1.5 m, including 16.2 g/t Au over 0.5 m, 23.1 g/t Au over 2.3 m, including 62.3 g/t Au over 0.8 m, and 30.6 g/t Au over
      1.5 m, including 91.4 g/t Au over 0.5 m from shear-hosted quartz carbonate vein systems (Panache South drill hole references in this paragraph are from the Company's press release dated March 1, 2022). So far, two drill holes totalling 909 m have been completed.

      Diamond Drilling Results Highlights:

      Cannot view this image? Visit: https://images.newsfilecorp.com/files/1528/167892_478314b224…

      Figure 1 – Barry Project – Surface plan, holes, and location of highlights

      To view an enhanced version of this graphic, please visit:
      https://images.newsfilecorp.com/files/1528/167892_478314b224…

      The infill drill program at the Barry underground project was designed to convert the Inferred resources from the 2021 MRE into Indicated resources by decreasing the drill spacing to 25 m and to expand the mineralization in the sub-vertical 800 Zone at depth. The results presented in this release keep on defining the high grade ore shoots between 100 and 200 m below the surface and better delineate the mineralization in the lesser drilled portion of the 800 Zone around 250 m below the surface.

      Cannot view this image? Visit: https://images.newsfilecorp.com/files/1528/167892_478314b224…

      Figure 2 – Barry Project – Long Section, 800 Zone Looking northwest

      To view an enhanced version of this graphic, please visit:
      https://images.newsfilecorp.com/files/1528/167892_478314b224…

      The latest infill drilling results from the 800 Zone demonstrate the continuity of the mineralization. Hole MB-23-593A returned results of 8.2 g/t Au over 8.2 m including 54.5 g/t Au over 0.5 m, hole MB 23-599 returned 5.0 g/t Au over 7.2 m including 16.2 g/t Au over 0.6 m, as well as hole MB 23-601A returned 7.2 g/t Au over 3.7m including 30 g/t Au over 0.5m and finally the MB 23-611 returned 6.4 g/t Au over 2.9 m including 16.2 g/t Au over 2.0 m. All the results confirm the plunge of the gold trend, its extension at depth and the potential to increase the mineral resources for the 800 Zone.

      Cannot view this image? Visit: https://images.newsfilecorp.com/files/1528/167892_478314b224…

      Figure 3 – Urban-Barry Project – Regional exploration targets

      To view an enhanced version of this graphic, please visit:
      https://images.newsfilecorp.com/files/1528/167892_478314b224…

      The Barry North-East and the Panache South properties are located on the west portion of the Urban-Barry camp, in the Macho mafic volcanic formation, where the Barry deposit and Moss showings occur along the Mazeres fault system striking N60 toward the Osisko Mining's Windfall deposit. The Panache showing located in the northeast portion of the area occurs along the Milner fault which also hosts the Fox and Fox West Zones owned by Osisko Mining.

      Barry Deposit Geology

      The Barry gold deposit is characterized by three dominant sets of structures, all dipping to the southeast. The sub-vertical shear zones and the H-Series shear zones dipping 25 to 40 degrees are hosted within intermediate to mafic volcanics and tuffs with local felsic intrusions. Contact zones dip from 50 to 65 degrees along the lower and upper contacts of the D1, D2 and D3 felsic intrusions with mafic volcanics. Gold mineralization is associated with disseminated sulphides within shear zones and veins with local visible gold. The Barry deposit has been delineated over 1.4 km along strike and 700 m below surface and remains open for expansion.

      Table of diamond drill hole results:

      The following table shows the significant intersections of the drill holes presented in this press release.

      Program Hole ID From (m) To (m) Length (m) Grades (g/t Au) Metal Factor (Length X Grades) Zones
      Underground Infill MB-23-593A 144.5 188.7 44.2 0.4 19.7 D1 Intrusive
      Underground Infill MB-23-593A 191.0 199.2 8.2 8.2 67.6 800
      Underground Infill MB-23-593A Including 195.1 198.5 3.4 16.6 56.5 800
      Underground Infill MB-23-593A And Including 197.0 197.5 0.5 54.5 27.3 800
      Underground Infill MB-23-595 145.3 151.9 6.6 1.6 10.7 800
      Underground Infill MB-23-595 Including 147.2 147.7 0.5 7.4 3.7 800
      Underground Infill MB-23-597 282.4 285.8 3.4 1.9 6.5 800
      Underground Infill MB-23-599 285.6 292.8 7.2 5.0 35.6 800
      Underground Infill MB-23-599 Including 285.6 286.3 0.7 23.0 16.1 800
      Underground Infill MB-23-599 And Including 288.0 288.6 0.6 16.2 9.7 800
      Underground Infill MB-23-601A 238.0 240.2 2.2 3.3 7.2
      Underground Infill MB-23-601A 255.8 259.5 3.7 7.2 26.7 D1 intrusive
      Underground Infill MB-23-601A Including 257.5 258.0 0.5 30.0 15.0 D1 intrusive
      Underground Infill MB-23-601A 303.0 307.7 4.7 2.4 11.4 800
      Underground Infill MB-23-602 185.6 187.5 1.9 11.4 21.7 New H
      Underground Infill MB-23-602 Including 185.6 186.3 0.7 24.4 17.1 New H
      Underground Infill MB-23-602 227.0 235.0 8.0 1.1 9.1 800
      Underground Infill MB-23-602 Including 232.0 232.5 0.5 6.4 3.2 800
      Underground Infill MB-23-603 354.3 357.5 3.2 3.1 10.1 800
      Underground Infill MB-23-603 Including 355.4 356.1 0.7 11.4 8.0 800
      Underground Infill MB-23-604 76.9 81.3 4.4 1.4 6.3
      Underground Infill MB-23-604 257.4 312.5 55.1 0.2 9.3 D1 Intrusive
      Underground Infill MB-23-605 319.5 327.0 7.5 2.0 15.2 800
      Underground Infill MB-23-605 Including 322.0 324.6 2.6 5.1 13.2 800
      Underground Infill MB-23-611 122.1 125.0 2.9 6.4 18.5 800
      Underground Infill MB-23-611 Including 122.1 123.1 1.0 16.9 16.9 800


      Notes:
      1) The meterage represents the actual length of the drilled lengths.
      2) Estimated true widths for the Barry interpreted zones are as follows: D series, AB series, H series 70% to 90% of core length, 800 series 50% to 70% of core length.
      3) The mineralized intervals listed are above 0.5 g/t Au and with metal factor (grades x thickness) above 5.
      4) Gold grades are uncut.

      Quality Control and Reporting Protocols

      The Barry project's drill core gold analyses are performed at Actlabs located in Ste-Germaine-Boulé, Quebec. The external laboratories employ a rigorous QA-QC analysis program that meets industry standards. The analyses are carried out by fire assay (A.A.) with atomic absorption finish and with gravimetric finish for assay above 10 g/t Au at Actlabs and AGAT laboratories. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor the Laboratory's performance. The Company's QA-QC program requires that at least 5% of samples be analyzed by an independent laboratory. These verification samples are sent to ALS Minerals laboratory facility located in Val-d'Or, Quebec. The verifications show a high degree of correlation with the Laboratory's results.

      Qualified Person

      Donald Trudel, P.Geo., (OGQ # 813) Director of Geology of the Company oversees all exploration activities on the Urban- Barry property and has compiled and approved the information contained in this press release. Mr. Trudel is a qualified person as defined by National Instrument 43-101 on standards of disclosure for mineral projects.

      About Bonterra Resources Inc.
      Bonterra Resources | 0,203 €
      • 1
      • 432
       DurchsuchenBeitrag schreiben


      Gatling Exploration ehemals Bonterra Res.-- die schnellen 100% im Januar 2011 und mehr % danach...