Novo Resources: 150% in 3 Tagen ! Und jetzt ? (Seite 49)
eröffnet am 18.08.12 23:35:25 von
neuester Beitrag 12.04.24 14:25:06 von
neuester Beitrag 12.04.24 14:25:06 von
Beiträge: 970
ID: 1.176.245
ID: 1.176.245
Aufrufe heute: 0
Gesamt: 91.619
Gesamt: 91.619
Aktive User: 0
ISIN: CA67010B1022 · WKN: A1JG38 · Symbol: NSRPF
0,1137
USD
-1,13 %
-0,0013 USD
Letzter Kurs 02:10:00 Nasdaq OTC
Neuigkeiten
26.03.24 · globenewswire |
26.03.24 · globenewswire |
28.02.24 · globenewswire |
13.02.24 · globenewswire |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,7950 | +30,33 | |
3,9300 | +15,59 | |
1,7500 | +15,13 | |
11,180 | +14,08 | |
208,00 | +13,60 |
Wertpapier | Kurs | Perf. % |
---|---|---|
18,550 | -11,03 | |
0,7000 | -12,49 | |
0,7250 | -14,71 | |
4,2300 | -17,86 | |
0,9000 | -25,00 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 68.013.893 von peterhuber91 am 01.05.21 11:18:17Natürlich kann es auch Überraschungen auf der Oberseite geben. Das Drill Programm wird es zeigen.
Peter
Peter
Kurzanalyse PEA ex sedar
GRADE CONTROL
The expected dilution (20%) and loss (2%) provisions are dependent upon a proposed grade control reverse circulation (RC) drilling programme and geological control of the excavation of all potential plant feed material.
Key features of the proposed grade control program include:
• 10 m x 10 m hole spacing on a staggered pattern
• 0.5 m samples through the mineralised zones (nominal 20 kg sample)
• sampling from 2 m above and below the mineralised zones
• RC chip logging
• mineralised material spotters to control the mining process
• face mapping to assist control and visual identification of the mineralised zones.
Dies ist der entscheidende Punkt:
Dilution welche zu einem niedrigeren mill Feed grade führt. Berechnet wurde die PEA mit 20%. In der ramp up phase ist diese wohl aktuell weit höher, ca 50% wenn ich mit ca 1g/t angenommen Millfeed hochgerechnet aus der letzten B.C. update rechne.
Der richtige CF fließt lt minenplan erst zw y4 und y6 mit der Verarbeitung des höhergradigen fresh ore. 50% dieser Ressourcen sind inferred. Das fresh ore ist wahrscheinlich teilweise säurehaltig und die Genehmigung zum Abbau wird demnächst eingereicht. Ohne diese Genehmigung B.C. sowieso Fine. Fresh ore soll Ende y2 gemined werden.
Handelt es sich um B.C. um ein übliches ramp up problem?
Denke, nein. Der Millfeed lt pea ist in y1 auch mit 2.1 g/t geplant. Q.H. wollte die Mühle mit den beschneidenden Drill Daten rocken. Plan einmal gründlich in die Hose gegangen. Er musste jetzt zurückrudern und ein großes infill Programm starten. Bei 10x10 für measured Resources werden ca1500-2000 Löcher gebraucht. Ich rechne mit ca 1000 drills.
Was wird dies bringen?
Ausgang bezüglich grade und oz aufgrund der Nuggetskonglomerate ungewiss. Entscheidend wird vor allem sein ob die hochgradigen inferred fresh mineralization oz zu 3.1 g/t 250k) in indicated umgewandelt werden können. Der Millfeed grade wird sinken da man auch einiges an low grade oxide ore mitnehmen wird können. Das ist nicht per se negative weil die Mühle ja noch Spielraum von ca 0.4m/t p.a. Kapazität hat.
Für mich hat sich das Risk Profil dramatisch geändert.
20% investment - 80% speculation.
Peter
GRADE CONTROL
The expected dilution (20%) and loss (2%) provisions are dependent upon a proposed grade control reverse circulation (RC) drilling programme and geological control of the excavation of all potential plant feed material.
Key features of the proposed grade control program include:
• 10 m x 10 m hole spacing on a staggered pattern
• 0.5 m samples through the mineralised zones (nominal 20 kg sample)
• sampling from 2 m above and below the mineralised zones
• RC chip logging
• mineralised material spotters to control the mining process
• face mapping to assist control and visual identification of the mineralised zones.
Dies ist der entscheidende Punkt:
Dilution welche zu einem niedrigeren mill Feed grade führt. Berechnet wurde die PEA mit 20%. In der ramp up phase ist diese wohl aktuell weit höher, ca 50% wenn ich mit ca 1g/t angenommen Millfeed hochgerechnet aus der letzten B.C. update rechne.
Der richtige CF fließt lt minenplan erst zw y4 und y6 mit der Verarbeitung des höhergradigen fresh ore. 50% dieser Ressourcen sind inferred. Das fresh ore ist wahrscheinlich teilweise säurehaltig und die Genehmigung zum Abbau wird demnächst eingereicht. Ohne diese Genehmigung B.C. sowieso Fine. Fresh ore soll Ende y2 gemined werden.
Handelt es sich um B.C. um ein übliches ramp up problem?
Denke, nein. Der Millfeed lt pea ist in y1 auch mit 2.1 g/t geplant. Q.H. wollte die Mühle mit den beschneidenden Drill Daten rocken. Plan einmal gründlich in die Hose gegangen. Er musste jetzt zurückrudern und ein großes infill Programm starten. Bei 10x10 für measured Resources werden ca1500-2000 Löcher gebraucht. Ich rechne mit ca 1000 drills.
Was wird dies bringen?
Ausgang bezüglich grade und oz aufgrund der Nuggetskonglomerate ungewiss. Entscheidend wird vor allem sein ob die hochgradigen inferred fresh mineralization oz zu 3.1 g/t 250k) in indicated umgewandelt werden können. Der Millfeed grade wird sinken da man auch einiges an low grade oxide ore mitnehmen wird können. Das ist nicht per se negative weil die Mühle ja noch Spielraum von ca 0.4m/t p.a. Kapazität hat.
Für mich hat sich das Risk Profil dramatisch geändert.
20% investment - 80% speculation.
Peter
Quelle: https://ceo.ca/@yetihopps
Here's a note from Leo in answer to some of questions. Here it is: BC: Agreements secured, as your aware production is slated to start 1stQ of 2021Karratha:Ngarluma have provided their approval for the ore sorter trial mining program. Mining Agreement discussions will commence if the trial mining program provides confidence that an economic resource is present at the Karratha Project. Ngarluma Aboriginal Corporation have verbally stated that they are interested in pursuing a Mining Agreement with Novo for the Karratha Project.Egina:Kariyarra have provided Novo with Heritage Agreements for all Novo tenements on Kariyarra Country and have undertaken three heritage surveys with Novo, allowing ~25km2 of ground to be explored with ground disturbing exploration activities. Where Novo tenements intersect the Yandeyarra Aboriginal Reserve, Novo must gain permission (an Entry Permit to the Yandeyarra Reserve) from a separate Aboriginal Group called Mugarinya. Kariyarra and Mugarinya are currently attempting to resolve a path forward for both groups to agree on providing Novo Entry Permits." Leo Karabelas
Peter
Here's a note from Leo in answer to some of questions. Here it is: BC: Agreements secured, as your aware production is slated to start 1stQ of 2021Karratha:Ngarluma have provided their approval for the ore sorter trial mining program. Mining Agreement discussions will commence if the trial mining program provides confidence that an economic resource is present at the Karratha Project. Ngarluma Aboriginal Corporation have verbally stated that they are interested in pursuing a Mining Agreement with Novo for the Karratha Project.Egina:Kariyarra have provided Novo with Heritage Agreements for all Novo tenements on Kariyarra Country and have undertaken three heritage surveys with Novo, allowing ~25km2 of ground to be explored with ground disturbing exploration activities. Where Novo tenements intersect the Yandeyarra Aboriginal Reserve, Novo must gain permission (an Entry Permit to the Yandeyarra Reserve) from a separate Aboriginal Group called Mugarinya. Kariyarra and Mugarinya are currently attempting to resolve a path forward for both groups to agree on providing Novo Entry Permits." Leo Karabelas
Peter
B.C. Update
https://stockhouse.com/news/press-releases/2021/04/29/novo-p…
Sollte den Markt beruhigen.
Peter
https://stockhouse.com/news/press-releases/2021/04/29/novo-p…
Sollte den Markt beruhigen.
Peter
Aber Egina und co jetzt mal Wurscht.
B.C. muss Q.H. auf die Reihe bekommen, ist vital !!
Peter
B.C. muss Q.H. auf die Reihe bekommen, ist vital !!
Peter
Antwort auf Beitrag Nr.: 67.943.840 von peterhuber91 am 25.04.21 20:48:32Durchlesen!
https://stockhouse.com/companies/bullboard?symbol=v.nvo&post…
https://stockhouse.com/companies/bullboard?symbol=v.nvo&post…
Antwort auf Beitrag Nr.: 67.941.821 von peterhuber91 am 25.04.21 14:52:32Tx Antwort mit 101 Dalmatiner trifft es gut. Dann lasst uns mal hoffen das Novo die Punkte findet.
Peter
Peter
Big scale alluvial mining is the business case at Egina. They have to dig up 2-3m without ni43-101. they close the pit instantly and replant it.
4km2 (current Mining license with 0,7 g/m3 and 1,5m depth will host only about 140k oz. If you want to have constant production you have to mine all the time.
My opinion is that they need about 1,5 g/m3 AVERAGE which would host about 7m oz for digging up 100km2. That's HUGE. 40% go to sumitomo.
current g/m3 in the swale is about 1,5/m3. But the the current 'high grade' swales are very thin.
sure; it's possible they will find a bigger swale with much higher grade. Otherwise it is going to hard to work.
Netherless:
Is it probable that they get a mining license for 100km2?
thanks for your assumptions.
peter
Fazit: Ich habe schon mit 100km2 Mining Fläche gerechnet. Das ist schon sehr sehr großzügig. Unabhängig von der Problematik der großflächigen Genehmigungen, ist sumitomo ist nicht wegen 1m oz Anteil da. Falls sumitomo aussteigt ist die Nugget Phantasie für längere Zeit gegessen. Die Nuggetgrösse der letzten bulk samples war sehr klein. Für bessere gold specs braucht es grössere Mini Nuggets über 5mm. Es ist auch nicht unwahrscheinlich das Q.H. daher den Schritt als Produzent gewagt hat; eventuell etwas vorschnell und jetzt einige Probleme zu lösen hat.
Ich hoffe auf eure Meinungen
4km2 (current Mining license with 0,7 g/m3 and 1,5m depth will host only about 140k oz. If you want to have constant production you have to mine all the time.
My opinion is that they need about 1,5 g/m3 AVERAGE which would host about 7m oz for digging up 100km2. That's HUGE. 40% go to sumitomo.
current g/m3 in the swale is about 1,5/m3. But the the current 'high grade' swales are very thin.
sure; it's possible they will find a bigger swale with much higher grade. Otherwise it is going to hard to work.
Netherless:
Is it probable that they get a mining license for 100km2?
thanks for your assumptions.
peter
Fazit: Ich habe schon mit 100km2 Mining Fläche gerechnet. Das ist schon sehr sehr großzügig. Unabhängig von der Problematik der großflächigen Genehmigungen, ist sumitomo ist nicht wegen 1m oz Anteil da. Falls sumitomo aussteigt ist die Nugget Phantasie für längere Zeit gegessen. Die Nuggetgrösse der letzten bulk samples war sehr klein. Für bessere gold specs braucht es grössere Mini Nuggets über 5mm. Es ist auch nicht unwahrscheinlich das Q.H. daher den Schritt als Produzent gewagt hat; eventuell etwas vorschnell und jetzt einige Probleme zu lösen hat.
Ich hoffe auf eure Meinungen
Antwort auf Beitrag Nr.: 67.877.150 von Weekendwarrior am 20.04.21 09:05:59Sehr gutes Interview; bringt wieder etwas vertrauen
Peter
Peter
NFG 😳😳
Keats Infill Drilling Returns 261.3 g/t Au over 7.2m, Queensway Program Expanded to 10 Drills
Keats Infill Drilling Returns 261.3 g/t Au over 7.2m, Queensway Program Expanded to 10 Drills
26.03.24 · globenewswire · Novo Resources |
26.03.24 · globenewswire · Novo Resources |
28.02.24 · globenewswire · Novo Resources |
13.02.24 · globenewswire · Novo Resources |
08.02.24 · globenewswire · Novo Resources |
29.12.23 · globenewswire · Novo Resources |
21.12.23 · globenewswire · Novo Resources |
20.12.23 · globenewswire · Novo Resources |
20.12.23 · globenewswire · Novo Resources |
18.12.23 · globenewswire · Novo Resources |