Parliament (Asamblea Legislativa Plurinacional / Bolivian Congress) approval is required under Bolivian law for Mining Production Contracts (MPCs) like Silver Elephant’s with COMIBOL to become fully formalized, enforceable, and secure long-term.
Silver Elephant (via its Bolivian subsidiary Apogee) signed the MPC with COMIBOL on October 3, 2019. It grants exclusive rights to develop and mine the Pulacayo-Paca silver project (about 2,803 hectares) for up to 30 years. The recent Bolivian Supreme Tribunal of Justice ruling (notified around November 5, 2026) annulled COMIBOL’s December 2024 cancellation of the contract (which had cited alleged illegal mining) and nullified related administrative actions. This restores the contract’s validity against that cancellation.
However, company disclosures have consistently noted that the MPC “remained subject to ratification by the Bolivian congress” (or Bolivian Legislative Assembly). This is a standard legal requirement, not unique to this deal.
Why parliamentary approval matters
Under Bolivia’s Mining and Metallurgy Law (Ley 535 of 2014, as amended, including provisions related to production contracts under Law 845 of 2016) and the Constitution (Article 158):
• Most mining contracts (including administrative mining contracts and Mining Production Contracts with entities like COMIBOL) require approval by the Asamblea Legislativa Plurinacional.
• Approval typically occurs after executive/AJAM processes; the Assembly has a set period (e.g., 90 days in some provisions) to approve or return the contract for corrections.
• Full formalization involves notarization/public deed and registration in the Mining Registry after legislative approval. Without it, the contract lacks complete legal perfection and long-term enforceability.
Key reasons this is important:
• Legal security and tenure: Approval confirms the state’s grant of rights over mineral resources (which belong to the Bolivian people under the Constitution). It reduces the risk of later challenges, unilateral actions by COMIBOL/Ministry, or claims of invalidity. The recent court win addresses the cancellation but does not replace the ratification step.
• Enforceability and operations: It enables full registration, clearer permitting, investment protection, and smoother ability to mine, develop, or finance the project. Without it, activities can face limits or disputes (as seen when the contract was cancelled and third parties like Andean Precious Metals became involved in parts of the area).
• Political and institutional legitimacy: Bolivia’s system emphasizes state control over mining. Legislative approval provides democratic oversight, especially for longer-term or significant contracts. Delays are common—reports note thousands of contract requests over years with only a few hundred approved by the Assembly, leading to backlog and issues like informal/illegal mining. Proposed reforms (as of late 2026) aim to ease this for smaller contracts via administrative routes while keeping legislative approval for strategic/large-scale ones.
• Practical impact for Silver Elephant: The court restoration is a major positive step for the company’s flagship asset (with substantial reported silver resources). Full parliament ratification would further solidify exclusive rights, support resumption/expansion of operations, improve bankability for investors, and help prevent future interference. Implementation by COMIBOL and authorities, plus any remaining ratification process, remains key.
Marcel, if you’d taken my hint seriously, you’d have made 120% on Friday. But nothing’s been missed – there’s still 500% waiting for you soon.
ELEF- PP closing by October 9th
Komisch, seitdem sie das letzte PP zu 10 ct. je Aktie angeboten haben, geht der Kurs nach oben.
Wer sonst sollte diese Zahlen so detailliert kennen?
Er sagt ja auch am Schluss, dass mehr Material und gleichzeitig erhebliche Erweiterung der Verarbeitungskapazität eine Lösung wären.
Nichtsdestotrotz...ein Fass ohne Boden. Mal wieder.
Sollten die Angaben von "Alex7759" korrekt sein, wird Fluorspar / Fluorit der nächste Rohrkrepierer von Lee.
Viel zu kleine Lagerstätte (700.000 t), kaum rentabel (IRR 5-7%). Erweiterung durch vorhandenes minderwertiges Material möglich, was das Projekt jedoch automatisch unwirtschaftlich macht.
Erklärt auch die krampfhafte Kapitalerhöhung die 2x nach unten korrigiert werden musste (13 - 11 - 10 Cent), um überhaupt frisches Kapital zu generieren. Was Lee mit der Million "reißen" möchte, bleibt ein Rätsel.
Das Schlimmste an der Geschichte, es werden durch Videos und Interviews wieder naive Kleininvestoren geködert die dann ihr Geld verlieren, weil sie Lee's Märchen Glauben schenken.
https://ceo.ca/@newsfile/cleantech-announces-1-million-non-b…
Ja, alles brandneue Infos.
@alex7759
"Campbell-Crotser Fluorspar Project – Base Case NPV Analysis
(CleanTech Vanadium Mining Corp.)Project Overview
The Campbell-Crotser underground fluorspar deposit contains a historical resource of approximately 800,000 short tons grading 37% CaF₂. The Company plans a 500 tpd flotation plant producing 97% acid-grade fluorspar (acidspar). Base Case Assumptions Ore throughput: 500 tpd × 330 operating days = 165,000 tpa
Mine life: ~4.85 years (rounded to 5 years for modelling)
Metallurgical recovery: 80%
Annual acidspar production: ~50,350 tonnes
Long-term acidspar price: US$550 / tonne
Operating cost (mining + processing + G&A): US$110 / tonne of ore
Initial CAPEX (mine development + 500 tpd plant + infrastructure): US$30 million
Sustaining CAPEX: US$1 million per year
Corporate tax rate: 25%
Discount rate: 10%
Key Financial Results (Base Case) Metric
Value
Annual Revenue
US$27.7 million
Annual Operating Costs
US$18.2 million
Annual Free Cash Flow (after tax)
US$6.4 million
Total CAPEX
US$30 million
NPV (10%)
–US$5.7 million
Approximate IRR
5–7%
Payback period
>5 years
Conclusion
Under the base-case assumptions (US$550/t acidspar and US$110/t operating costs), the project generates a slightly negative NPV of approximately –US$5.7 million at a 10% discount rate. The economics are highly sensitive to operating costs and capital expenditure. A reduction in OPEX to ≤ US$90–100/t or CAPEX to ≤ US$25 million would move the NPV into positive territory. Higher realised prices (US$580–600/t) would also deliver a positive return. These figures are preliminary and conceptual. They do not constitute a NI 43-101 compliant Preliminary Economic Assessment. Actual results will depend on the outcomes of the 2026–2027 drill programme, detailed engineering, and final capital and operating cost estimates.
@alex7759Campbell-Crotser Fluorspar Project – Expanded Resource Scenario
CleanTech Vanadium Mining Corp.Resource Base Historical Campbell-Crotser resource: 800,000 tonnes grading 37% CaF₂
Additional resources: 7,000,000 tonnes grading an average of 20% CaF₂
Total mineral inventory: 7,800,000 tonnes at a blended grade of 21.74% CaF₂
Contained CaF₂: 1,696,000 tonnes
Recoverable CaF₂ (80% recovery): 1,356,800 tonnes
Total acid-grade (97% CaF₂) product: approximately 1.40 million tonnes
Operating Parameters Processing plant capacity: 500 tonnes per day (165,000 tonnes of ore per year)
Mine life: approximately 47.3 years
Average annual acid-spar production: ~29,600 tonnes
Key Assumptions (Base Case) Long-term acid-spar price: US$550 per tonne
Operating cost: US$110 per tonne of ore
Initial CAPEX: US$30 million
Sustaining capital: US$1 million per year
Corporate tax rate: 25%
Financial Results Metric
Value
Annual Revenue
US$16.3 million
Annual Operating Costs
US$18.2 million
Annual Free Cash Flow (after tax)
–US$2.16 million
NPV at 10% discount rate
–US$51 million
NPV at 8% discount rate
–US$56 million
Conclusion
Blending a large volume of lower-grade (20%) material with the higher-grade historical resource significantly dilutes the overall head grade to 21.74%. At the fixed 500 tpd plant capacity, annual acid-spar production declines to approximately 29,600 tonnes. As a result, annual revenue falls below operating costs, generating persistent negative free cash flow. The project delivers a strongly negative NPV under both 8% and 10% discount rates. Recommendation
This expanded low-grade inventory is not economically viable at the current plant scale. Positive economics would require either: Significant expansion of processing capacity, or
Selective mining focused primarily on the higher-grade (37%) zones.
These results are conceptual and preliminary. They do not constitute a NI 43-101 compliant economic study."
Quellen:
https://ceo.ca/ctv?id=c9b5a80b8ce6
https://ceo.ca/ctv?id=f0d387318b2a
Ich habe "Deinen Beitrag nicht beantwortet" und John Lee ist ein erfolgreicher Geschäftsmann.
😉
Marcel, Du hast meinen Beitrag nicht beantwortet. Aber lass mal. Es lohnt es sich wohl gar nicht mehr, hier noch lange Diskussionen zu führen. Wer bisher noch nicht verkauft hat, kann auf das
Wunder von Kentucky hoffen.
Vancouver, British Columbia--(Newsfile Corp. - June 16, 2026) - CleanTech Vanadium Mining Corp. (TSXV: CTV) (OTCQB: CTVFF) ("CleanTech" or the "Company") is pleased to announce a non-brokered private placement (the "Offering") to raise gross proceeds of up to $1,560,000 through the sale of up to 12,000,000 units (the "Units") at a price of $0.13 per unit.
weil man bis Mitte Juli mickrige $84.000 von extern erhalten hat, musste "Motz" einspringen - d.h. seine ELEF-Verkäufe sind kein "anderes Thema" sondern hängen indirekt mit dieser Finanzierung zusammen
CleanTech Vanadium Mining Corp. (TSXV: CTV) (OTCQB: CTVFF) ("CleanTech" or the "Company") announces that it has amended the terms of its previously announced non-brokered private placement (the "Offering") to raise gross proceeds of up to $1,320,000 through the sale of up to 12,000,000 units (the "Units") at a price of $0.11 per unit.
die angekündigte Finanzierung belief sich auf $1.56 Mio
weil sich keiner gefunden hat der Lee Geld anvertrauen wollte, hat man den Ausgabepreis von 0.13 auf 0.11 pro Aktie gesenkt
Oracle und "Motz" mussten einspringen damit überhaupt etwas Geld generiert wurde, da nur lächerliche $84.000 "von Außen" geflossen sind
lt. Sedar hat"Motz" Mitte Juli (9.-20.) vermehrt ELEF abgestoßen, wahrscheinlich um das Geld für diese Finanzierung "umzuleiten"... das ist alles SEHR SUSPEKT!!!
Vielleicht solltest Du es korrekt schildern.
CTV hatte eine Finanzierungsrunde angekündigt über 1.320.000 $. Davon sollten Insider bis zu 330.000 $ übernehmen.
https://ceo.ca/@newsfile/cleantech-closes-first-tranche-of-n…
Interessante Diskussionen für Sie
Investoren beobachten auch:
| Wertpapier | Perf. % |
|---|---|
| -0,82 | |
| -1,74 | |
| -4,43 | |
| +6,48 | |
| 0,00 | |
| +2,73 | |
| +18,88 | |
| 0,00 | |
| +20,00 | |
| +2,82 |
Meistdiskutiert
| Wertpapier | Beiträge | |
|---|---|---|
| 77 | ||
| 47 | ||
| 31 | ||
| 20 | ||
| 20 | ||
| 17 | ||
| 16 | ||
| 10 | ||
| 10 | ||
| 9 |