      schrieb am 13.06.01 11:54:14
      Beitrag Nr. 1 ()
      POPLAR RESOURCES LTD. ("PPX-V") - Progress Report: Bottenbacken Project
      Sweden

      W. Gennen McDowall, President of Poplar Resources Ltd., the "Company"
      reports:

      The Bottenbacken Project is a polymetallic exploration project with palladium,
      copper and gold credits, located within the Storsjo Precambrian window in central
      Sweden. It is 100% owned and operated by North Star Diamonds AS. (North Star
      Diamonds is Poplar Resources` 65%-owned subsidiary. A Letter of Intent has
      been signed that would see Poplar Resources acquire 100% of North Star
      Diamonds.) The Bottenbacken license area has recently been increased and now
      covers approximately 7000 hectares.

      Preliminary results of a gravity survey at Bottenbacken have revealed a gravity
      high of some 6 milligals coincident with a distinct magnetic anomaly located in
      the central portion of the license area. Potential field (gravity and magnetic)
      modeling of the data over this anomaly indicate the existence of a large,
      flat-lying, dense, magnetic body. The results of this modeling have indicated that
      further gravity and magnetic work is warranted.

      With the above in mind, a contract has been signed with the geophysical
      department of the Geological Survey of Norway (NGU) to carry out a detailed
      helicopter geophysical survey over the Storsjo Precambrian window.
      Approximately 1500 line kms of data will be acquired. This data will consist of
      magnetics, radiometrics and VLF. This helicopter survey will commence on June
      18, 2001, and will identify and delineate other "magnetic" bodies known to exist
      in the license area. The airborne survey will also assist with the overall structural
      interpretation of the Bottenbacken Project. A further 300 gravity readings will also
      be acquired. This Phase Two gravity survey has already commenced and should
      be completed in approximately two weeks.

      Existing mineralization at Bottenbacken consists mainly of disseminated
      sulphides (chalcopyrite, bornite and chalcocite with rare pyrite). This type of
      mineralization makes an excellent Induced Polarization (IP) target. It was,
      therefore, decided that an IP survey would also be carried out. This IP survey has
      already commenced and is progressing well. To date, some 25 kms of data have
      been acquired. The IP Survey is being carried out by Scott Geophysics of
      Vancouver, Canada. A pole-dipole array is being used with an "a" spacing of 50
      meters and n = 1 to 5. Processing of the data is carried out on a daily basis and
      preliminary pseudosections are being supplied at the end of each day`s work.

      IP results to date show an excellent correlation with the gravity and magnetic
      data. It would, therefore, appear that the dense, magnetic body outlined by the
      gravity and magnetic data also has a distinct chargeability anomaly associated
      with it. An initial IP line separation of 500 meters has been used. Once the lateral
      extent of the IP anomaly has been determined this line separation will be reduced
      to 125 meters and the "anomalous" area will be "in-filled". This "detailed" IP data
      will assist in the delineation of the causative body and in the location of suitable
      drill hole sites. Drilling on the project is planned for August/September this year.
      TEL: (604) 718-5454 William Gennen McDowall, President & CEO FAX: (604)
      646-2054 E:mail: poplar@axion.net Internet: www.poplar-res.com
      Avatar
      schrieb am 09.07.01 20:50:51
      Beitrag Nr. 2 ()
      Folgend die juengsten Ergebnisse von dem schwedischen Pd-Projekt. Da bin ich aber jetzt auf die Bohrergebnisse gespannt. Im August soll mit den Bohrungen begonnen werden.
      Progress Report: Bottenbacken Project Sweden
      7/9/01


      POPLAR RESOURCES LTD. ("PPX-V") - Progress Report: Bottenbacken Project
      Sweden

      W. Gennen McDowall, President of Poplar Resources Ltd., reports:

      The Bottenbacken Project is a polymetallic exploration project with palladium,
      copper and gold credits located within the Storsjo Precambrian window in central
      Sweden. It is 100% owned and operated by North Star Diamonds AS. (North Star
      Diamonds is Poplar Resources 65%-owned subsidiary. A Letter of Intent has
      been signed that would see Poplar Resources acquire 100% of North Star
      Diamonds). The Bottenbacken license area covers approximately 7000 hectares.
      As a result of the field work described below it has been decided to increase the
      size of the current license area.

      All geophysical fieldwork on the project has been completed. The Geological
      Survey of Norway (NGU) has completed the airborne geophysical survey. Some
      1600 line kms of airborne data were acquired. Scott Geophysics (Vancouver,
      Canada) has completed the induced polarization (IP) survey. A total of 97.9
      kilometers of IP were acquired in 38 continuous days. Geovista (Sweden) has
      completed the gravity survey, a total of 360 gravity points were acquired.

      A preliminary interpretation of the airborne data supplied to Poplar by the NGU
      has identified a number of anomalous areas. Some of these areas are outside of
      the existing license. As a result of this a number of new license applications have
      been made.

      The IP data collected at Bottenbacken has revealed a number of distinct and
      continuous chargeability anomalies. There appears to be two separate
      "anomalous-zones", the northern magnetic zone (Storuggen) and the southern
      non-magnetic zone (Scapa). Distance between these zones is approximately 2
      kms. Both zones have a rough NW-SE strike. These anomalous zones have
      strike lengths in the order of 2 - 3 kms and appear to be approximately four to five
      hundred meters wide. The depth to the top of these zones is in the order of 25-50
      meters. At this stage the thickness of the units is difficult to estimate, however
      the IP data is currently being inverted using an inversion technique provided by
      Scott Geophysics, this is called "image2DTM ". This process is effectively an
      inverse imaging technique or "retroprojection" process. The process does not
      require a starting model and is not a filter. The method produces true-depth
      chargeability and resistivity cross-sections.

      In a very broad sense, the IP phenomena effectively measures the chargeability
      of a rock unit. Chargeability is directly related to the sulphide (copper, iron etc.)
      content of the rock. Background chargeability values at Bottenbacken are in the
      3 to 4 mV/V (chargeability units, sometimes called IP percent or milliseconds)
      range.

      Large (1 to 2 cubic meters) mineralized boulders interpreted to be of local origin
      have been identified in the Storuggen area. Samples from these boulders have
      been collected and are currently being assayed by Acme Laboratories
      (Vancouver, Canada); results are expected within five days. The IP data from the
      Storuggen area indicates chargeability values of around 25 to 32 mV/V. The
      apparent resistivity data ranges from 10,000 to 25,000 ohm-meters.

      Mapping over the Scapa anomaly, has identified a large number of breccia
      boulders; these boulders are clustered down ice of the main IP anomaly. The
      matrix of these boulders consists of hematite with trace chalcopyrite. The
      boulders are non magnetic. The IP data over Scapa indicates a cigar shaped
      body dipping to the southeast. Chargeability values range from 20 to 30 mV/V.
      This anomalous zone has a resistivity low associated with it, values range from
      2000 to 5000 ohm-meters. New airborne magnetic data over the anomaly
      indicates a magnetic low. The previous ground electromagnetic survey (Slingram)
      carried out at Bottenbacken by the Swedish Geological Survey (SGU) identified a
      number of anomalies. One of these EM anomalies corresponds to the Scapa IP
      anomaly.

      Final gravity results (terrain corrected) have not yet been received. Once this data
      has been received, modelling over the area will be carried out.

      Quotations for drilling have been requested from a number of local drilling
      contractors. It is expected that drilling at Bottenbacken will commence in
      August. Approximately 2000 to 3000 meters of drilling has been budgeted for the
      project.

      ON BEHALF OF THE BOARD OF DIRECTORS

      POPLAR RESOURCES LTD.

      "W. G. McDowall"

      W. Gennen McDowall, President TEL: (604) 718-5454

      W. Gennen McDowall, President FAX: (604) 646-2054 Email: poplar@axion.net
      Internet: www.poplar-res.com
      Avatar
      schrieb am 16.07.01 19:42:34
      Beitrag Nr. 3 ()
      Wenn die im August in ihren Bohrkernen aehnliche Gehalte finden sollten, duerfte es sicher interessant werden.
      Bottenbacken Sample Results
      7/16/01


      POPLAR RESOURCES LTD. ("PPX-V") - Bottenbacken Sample Results

      W. Gennen McDowall reports:

      The Bottenbacken project is a polymetallic exploration project with palladium,
      copper and gold credits located within the Storsjo Precambrian window in central
      Sweden. It is 100 per cent owned and operated by North Star Diamonds AS.
      (North Star Diamonds is Poplar Resources 65-per-cent owned subsidiary. A letter
      of intent has been signed that would see Poplar Resources acquire 100 per cent
      of North Star Diamonds).

      Large (one to two cubic meters) mineralized (metavolcanic) boulders were
      identified in the northern area (Storuggen). Samples of these boulders were
      collected and sent to Acme Analytical Labs Ltd (Vancouver, Canada) for
      analysis. These samples have been assayed and the results obtained are given
      in Table 1.



      TABLE 1

      Recent analytical results

      for selected samples taken from the Storuggen Area

      Sample No Cu % Pd g/t Au g/t Pt g/t

      10 2.50 2.740 1.243 0.016

      13 1.90 0.450 0.546 <0.010

      19 4.10 2.291 1.985 0.012

      20 4.30 4.595 0.680 <0.010


      Three of these samples (13,19 and 20) were located within fifty (50) meters of
      borehole B 86005. This inclined hole was drilled to a depth of 121 meters by the
      Swedish Geological Survey (SGU) in 1986. The hole intersected weak copper
      mineralization from 14 to 88 meters within a metavolcanic host. Assayed values
      (SGU) ranged from 0.07 % to 0.35 % copper, with an average value of 0.16 %.
      The location of this hole has been confirmed by Poplar and it appears to have
      been drilled on the very western edge of the recently discovered Storuggen
      induced polarization (IP) anomaly. IP Line 1359250E runs directly over this
      borehole. An IP anomaly at this borehole location was observed and was
      classified by Poplar as weak to medium (chargeability - 10 to 12 mV/V) with a
      limited depth extent in comparison to the very strong (chargeability - 25 to 32
      mV/V) IP anomalies located to the northeast of this borehole. Continuity between
      these anomalies can be seen on the IP data.

      The Storuggen IP results indicate an anomalous zone with an east-west strike
      length of approximately 2 kilometers and a width of some 400 meters. The depth
      to the top of the anomalous zones appears to be in the order of 25 to 50 meters.

      A second "anomalous zone," Scapa, is located two kilometers south east of
      Storuggen. The Scapa anomaly has a northwest to southeast strike and the IP
      data indicates that the anomaly can be traced over a distance of approximately
      three kilometers. The zone has a width of around 500 meters.

      Drilling at Bottenbacken is scheduled for August at which time both "anomalous
      zones" (Storuggen and Scapa) will be drilled. Approximately 2000 to 3000 meters
      of drilling has been budgeted for the project. TEL: (604) 718-5454 William Gennen
      McDowall, President & CEO FAX: (604) 646-2054 E:mail: poplar@axion.net
      Avatar
      schrieb am 09.08.01 17:45:14
      Beitrag Nr. 4 ()
      Private Placement Closed
      8/9/01


      POPLAR RESOURCES LTD. ("PPX-V") - Private Placement Closed

      Further to the Canadian Venture Exchange notice of August 3, 2001, Poplar
      Resources Ltd. (the "Company") wishes to announce that it has closed a private
      placement for gross proceeds of approximately $1 million through the issuance of
      6,666,666 units at $0.15. Each unit consists of one common share and one
      non-transferable common share purchase warrant, with each warrant entitling the
      holder to purchase one additional common share until August 8, 2003, at a price
      of $0.20 per share. Union Securities Ltd. was paid a cash finder`s fee of $88,750
      and granted 1,479,166 warrants with the same terms as those issued to
      subscribers. Securities issued pursuant to the private placement will be subject
      to a hold period expiring Dec 8, 2001.

      The net proceeds from the private placement will be used for continuing
      exploration in Sweden and for general working capital and corporate purposes.
      The principal use of the funds is for drilling on the Bottenbacken Polymetallic
      Project in central Sweden, that includes palladium, copper, silver and gold
      credits. This drilling programme is to commence shortly on two separate
      anomalies within the 100 sq. km license area.

      Norman F. Thompson ("NFT") announces that, as a result his purchase of
      1,583,335 of the foregoing units, he now owns 2,571,016 common shares of the
      Company and, directly and indirectly, warrants to purchase an additional
      4,023,057 common shares of the Company, representing to his knowledge, if all
      of the securities were exercised, 13.6 per cent of the then outstanding common
      shares of the Company. Prior to the foregoing purchase, NFT held 987,681
      common shares and, directly and indirectly, 1,879,722 warrants to purchase
      additional common shares of the Company which, if exercised, would have
      brought his shareholdings to 6.9 per cent of the then outstanding common shares
      of the Company. NFT has acquired the additional securities of the Company for
      investment purposes only, and other than through an exercise of the foregoing
      warrants, has no present intention to acquire further securities of the Company,
      but he may acquire additional securities in the market from time to time. TEL:
      (604) 718-5454 Poplar Resources Ltd. FAX: (604) 646-2054 William Gennen
      McDowall, President & CEO Email: poplar@axion.net Internet:
      www.poplar-res.com
      Avatar
      schrieb am 11.09.01 13:05:35
      Beitrag Nr. 5 ()
      In Schweden wird jetzt gebohrt. Die geophysikalischen Daten deuten einen groesseren Erzkoerper an. Wie reichhaltig das Erz sein wird, werden wir bald erfahren.
      Poplar Resources Ltd - News Release
      Poplar commences drilling on Bottenbacken
      Poplar Resources Ltd PPX
      Shares issued 34,599,535 Sep 10 2001 close $.360
      Monday Sep 10 2001 News Release

      Mr. William McDowall reports
      The company has commenced drilling at the Bottenbacken project in
      central Sweden as part of a 20-hole drill program. Bottenbacken is a
      polymettalic property with palladium, copper, gold and silver credits.
      The first hole is being drilled on the Bell zone, one of five anomalous
      areas identified at Bottenbacken to date. Assay results are expected
      in about 10 days to two weeks time.
      The company is expecting to have its new Web site operational later
      this week, with charts, maps, photographs and other information
      regarding the Bottenbacken project.

      Trading Spotlight

      Anzeige
      Nurexone Biologic
      0,3960EUR +3,66 %
      Analyst sieht aufregende Zukunft!mehr zur Aktie »
      Avatar
      schrieb am 11.09.01 14:31:48
      Beitrag Nr. 6 ()
      :laugh:
      "Bottenbacken project"
      Wenn bottenbacken das bedeutet, was ich denke, würde ich dort nicht bohren ...
      :laugh:
      Avatar
      schrieb am 21.09.01 02:26:52
      Beitrag Nr. 7 ()
      Bottenbacken oder andere Backen, der erste Bohrkern wird zur Analyse geschickt.
      POPLAR RESOURCES LTD (PPX-V") - First Drill Hole Completed On
      Bottenbacken Polymetallic - Project

      W. Gennen McDowall, President of Poplar Resources Ltd. (the "Company")
      wishes to announce the completion of the first drill hole at the Company`s 100%
      owned Bottenbacken polymetallic project, which has palladium, copper, and gold
      credits.

      Drill hole BB-1 is the first of a 20-hole drill programme. The hole was drilled on
      the Bell Zone, one of four main exploration targets within the project area. An
      additional two holes are planned for drilling on the Bell Zone. BB-l was drilled to a
      depth of 248.55 meters. It was drilled at an angle of 50 degrees towards the
      northwest to test an IP and magnetic anomaly. Besides the geophysical
      anomalies, a mineralized outcrop was discovered 20 meters from this hole.
      Mineralized boulders previously assayed (see news release dated July 16, 2001)
      also lie approximately 250 meters southwest from this drill hole.

      Preliminary drill-core logging of the complete length of the core at BB-1 shows
      that the main rock type is a medium grained, dark to grayish, porphyroblastic,
      basaltic "metavolcanic" rock. Abundant quartz and epidote veins are noted along
      the drill-core. A number of diabase dykes cut the drill-core. Sulphide
      mineralization has been noted throughout the hole, with chalcopyrite, bornite and
      pyrite being identified. Drilling was stopped while still in "metavolcanic" rock.

      Splitting of the core at BB-1 is currently underway and will be sent for assaying
      shortly. Assay results on BB-1 will be released upon completion of the analysis.

      Drilling on the second hole, BB-2, at the Bell Zone commenced yesterday.

      For further information on the Bottenbacken Project as well as the Company`s
      other properties, please visit our new website at http://www.poplarresources.com.
      The website is our primary conduit for the dissemination of all information on the
      Company`s projects. The website includes various charts, maps, photographs
      and a slide presentation. TEL: (604) 718-5454 William Gennen McDowall,
      President & CEO FAX: (604) 646-2054 Email: poplar@axion.net WEBSITE:
      www.poplarresources.com
      Avatar
      schrieb am 21.09.01 09:42:14
      Beitrag Nr. 8 ()
      Am 11.9. um 14:31 war die Welt noch lustiger.

      McNugget, was hältst Du von Cluff Mining?
      Avatar
      schrieb am 21.09.01 10:12:23
      Beitrag Nr. 9 ()
      Wenn ich gefragt wäre :cool:!!!!

      Machen gute Arbeit,es geht darum wie lange das cash hält.

      Aber Cluffy beherrscht das fundraising!

      cu DL


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.
      Poplar Resources, Fortschritte bei schwedischem Pd-Projekt