Wenn der Elektrowandel so schnell kommt, wird Lithium benötigt.
eröffnet am 22.06.17 16:10:09 von
neuester Beitrag 19.04.24 16:11:54 von
neuester Beitrag 19.04.24 16:11:54 von
Beiträge: 3.559
ID: 1.255.793
ID: 1.255.793
Aufrufe heute: 2
Gesamt: 399.482
Gesamt: 399.482
Aktive User: 0
ISIN: CA8536061010 · WKN: A2DJQP · Symbol: S5L
1,5800
CAD
+3,27 %
+0,0500 CAD
Letzter Kurs 19.04.24 TSX Venture
Neuigkeiten
11.04.24 · Der Finanzinvestor |
07.04.24 · Felix Haupt Anzeige |
14.03.24 · IRW Press |
14.03.24 · ESG Aktien |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
31,90 | +18,10 | |
0,8000 | +17,65 | |
0,5500 | +14,61 | |
0,8200 | +12,33 | |
11,420 | +11,41 |
Wertpapier | Kurs | Perf. % |
---|---|---|
1,2100 | -7,63 | |
2,1800 | -9,17 | |
69,01 | -9,53 | |
4,2300 | -17,86 | |
47,85 | -97,99 |
Beitrag zu dieser Diskussion schreiben
Atemgeräte
Das wird wohl hier nichts mehr mit dem auftakeln. Der rostige Kahn ohne Ladung vergammelt am Strand bei hohen Zinsen. Es wird bereits über den Schrottpreis verhandelt. Oder?
Antwort auf Beitrag Nr.: 75.399.986 von Paullong am 05.03.24 19:45:27
mach doch was du willst
Zitat von Paullong: Hey Dionys wenn die schnelle Wunder Herstellung in Betrieb ginge würde
ich gerne siebenstellig einspringen .
mach doch was du willst
https://www.standardlithium.com/investors/news-events/press-releases/detail/169/standard-lithium-installs-commercial-dle-column-at
Standard Lithium Installs Commercial DLE Column at Demonstration Plant
Further Derisks DLE Process With Testing Planned Using Full-Scale Commercial Equipment Over the Next 6 Months
EL DORADO, Ark., March 13, 2024 (GLOBE NEWSWIRE) -- Standard Lithium Ltd. (“Standard Lithium” or the “Company”) (TSXV:SLI) (NYSE American:SLI) (FRA:S5L), a leading near-commercial lithium development company, is pleased to announce that it has successfully installed a commercial-scale Direct Lithium Extraction (“DLE”) column at its Demonstration Plant near El Dorado, Arkansas. The column is a LiPRO™ Lithium Selective Sorption (“LSS”) unit, supplied by Koch Technology Solutions, LLC (“KTS”).
The column has been installed and integrated with the Company’s existing Demonstration Plant to test and derisk the design for commercial applications of the LiPRO™ LSS technology. It is the same size and design as those that the Company intends to use (in multiple trains) in its commercial applications for the Phase 1A and South West Arkansas projects (as described in the Company’s recent Definitive Feasibility Study for the Phase 1A project and Preliminary Feasibility Study for the South West Arkansas project).
The commercial-scale LiPRO™ LSS column is currently being filled with Koch Engineered Solutions proprietary lithium-selective sorption with commissioning expected later this month. Extensive performance testing of the commercial-scale DLE technology will be performed over the following months under the supervision of Standard Lithium and KTS technical specialists.
Standard Lithium’s Director, President & COO, Dr. Andy Robinson commented, “this is an important derisking milestone for Standard Lithium and our partners. Our team has been successfully running the LiPRO™ LSS technology since October 2022, and we have already successfully completed scale-ups of the DLE equipment at the Demonstration Plant; this is our final stage of derisking the technology. The data gathered from this commercial-scale unit will provide crucial validation and derisking information for our ongoing project finance processes, as well as FEED and DFS studies for the South West Arkansas Project (see news release dated 24 January 2024). We’re very grateful for our partners Koch Technology Solutions and LANXESS who have helped to make this final derisking step possible.”
Standard Lithium's Demonstration Plant is the only large-scale, continuously operating DLE plant in North America. Initially commissioned in May 2020, the Plant has processed over 16.4 million gallons (62 million litres) of Smackover brine.
“The long-term operation of our Demo Plant has been crucial in replicating and understanding the real-world dynamic conditions of continuous commercial-scale operations,” said Dr. Robinson. “With our partner Koch Technology Solutions, we have been able to tailor and optimise the multi-step flowsheet that will allow the Plant to be scaled for commercial production. The knowledge we have on-hand from over four years of operations, combined with an optimised flowsheet and now a commercial-scale DLE column, puts us in a strong position as we continue to advance our projects.”
Standard Lithium Installs Commercial DLE Column at Demonstration Plant
Further Derisks DLE Process With Testing Planned Using Full-Scale Commercial Equipment Over the Next 6 Months
EL DORADO, Ark., March 13, 2024 (GLOBE NEWSWIRE) -- Standard Lithium Ltd. (“Standard Lithium” or the “Company”) (TSXV:SLI) (NYSE American:SLI) (FRA:S5L), a leading near-commercial lithium development company, is pleased to announce that it has successfully installed a commercial-scale Direct Lithium Extraction (“DLE”) column at its Demonstration Plant near El Dorado, Arkansas. The column is a LiPRO™ Lithium Selective Sorption (“LSS”) unit, supplied by Koch Technology Solutions, LLC (“KTS”).
The column has been installed and integrated with the Company’s existing Demonstration Plant to test and derisk the design for commercial applications of the LiPRO™ LSS technology. It is the same size and design as those that the Company intends to use (in multiple trains) in its commercial applications for the Phase 1A and South West Arkansas projects (as described in the Company’s recent Definitive Feasibility Study for the Phase 1A project and Preliminary Feasibility Study for the South West Arkansas project).
The commercial-scale LiPRO™ LSS column is currently being filled with Koch Engineered Solutions proprietary lithium-selective sorption with commissioning expected later this month. Extensive performance testing of the commercial-scale DLE technology will be performed over the following months under the supervision of Standard Lithium and KTS technical specialists.
Standard Lithium’s Director, President & COO, Dr. Andy Robinson commented, “this is an important derisking milestone for Standard Lithium and our partners. Our team has been successfully running the LiPRO™ LSS technology since October 2022, and we have already successfully completed scale-ups of the DLE equipment at the Demonstration Plant; this is our final stage of derisking the technology. The data gathered from this commercial-scale unit will provide crucial validation and derisking information for our ongoing project finance processes, as well as FEED and DFS studies for the South West Arkansas Project (see news release dated 24 January 2024). We’re very grateful for our partners Koch Technology Solutions and LANXESS who have helped to make this final derisking step possible.”
Standard Lithium's Demonstration Plant is the only large-scale, continuously operating DLE plant in North America. Initially commissioned in May 2020, the Plant has processed over 16.4 million gallons (62 million litres) of Smackover brine.
“The long-term operation of our Demo Plant has been crucial in replicating and understanding the real-world dynamic conditions of continuous commercial-scale operations,” said Dr. Robinson. “With our partner Koch Technology Solutions, we have been able to tailor and optimise the multi-step flowsheet that will allow the Plant to be scaled for commercial production. The knowledge we have on-hand from over four years of operations, combined with an optimised flowsheet and now a commercial-scale DLE column, puts us in a strong position as we continue to advance our projects.”
Wann kommt der letzte Atemzug.
Hey Dionys wenn die schnelle Wunder Herstellung in Betrieb ginge würde ich gerne siebenstellig einspringen .
Wollt wider mal in den Chat sehen, es ist hier ja verdammt ruhig geworden.
Nach dem ich den Großteil meiner Gewinne realisiert hab, behielt ich einen kleinen Beitrag der jetzt leicht im roten Bereich ist.
Ehrlich gesagt, hab ich den Wert hier schon lange nicht mehr beobachtet.
Im Lithium Bereich sind momentan die Bären los - ggf könnte es langsam wieder interessant werden, denn nach jedem Bärenmarkt kommt i-wann wieder ein Bullenmarkt.
Hier war immer eine gute Story - wird langsam Zeit mich wieder damit zu beschäftigen.
Oder hat jemand ein kurzes Update?
Nach dem ich den Großteil meiner Gewinne realisiert hab, behielt ich einen kleinen Beitrag der jetzt leicht im roten Bereich ist.
Ehrlich gesagt, hab ich den Wert hier schon lange nicht mehr beobachtet.
Im Lithium Bereich sind momentan die Bären los - ggf könnte es langsam wieder interessant werden, denn nach jedem Bärenmarkt kommt i-wann wieder ein Bullenmarkt.
Hier war immer eine gute Story - wird langsam Zeit mich wieder damit zu beschäftigen.
Oder hat jemand ein kurzes Update?
Antwort auf Beitrag Nr.: 75.170.074 von simi123 am 26.01.24 13:16:07
Dann rein in Wirecard, die ist von bummelig 200€ auf 0,03€👍
Zitat von simi123: Du von 6 Euro auf 1 ... Sagt alles kann nicht immer mit runter gehen ....
Dann rein in Wirecard, die ist von bummelig 200€ auf 0,03€👍
Schaut gut aus 😀😀
U Lithium wird es brauchen...
Antwort auf Beitrag Nr.: 75.169.993 von viking92 am 26.01.24 13:06:34Du von 6 Euro auf 1 ... Sagt alles kann nicht immer mit runter gehen ....
Antwort auf Beitrag Nr.: 75.167.008 von simi123 am 25.01.24 22:03:29
🤣
Gewürfelt, oder auf welchen Fakten beruht die Prognose?
Zitat von simi123: So bin heute rein ...rechne mit einer Verdopplung im nächsten Monat
🤣
Gewürfelt, oder auf welchen Fakten beruht die Prognose?
11.04.24 · Der Finanzinvestor · First Majestic Silver Corporation |
14.03.24 · IRW Press · Standard Lithium |
14.03.24 · ESG Aktien · Standard Lithium |
13.03.24 · globenewswire · Standard Lithium |
11.03.24 · Sharedeals · Standard Lithium |
06.03.24 · Gold-Silber-Rohstofftrends · Barrick Gold Corporation |
05.03.24 · Gold-Silber-Rohstofftrends · Albemarle |
05.03.24 · wallstreetONLINE Redaktion · Albemarle |
04.03.24 · wallstreetONLINE Redaktion · Albemarle |
21.02.24 · globenewswire · Standard Lithium |