7C Solarparken AG
7C Solarparken AG announces 9M figures 2017
Business news for the stock market
Bayreuth (pta034/20.11.2017/17:00) - * 21% INCREASE IN ELECTRICITY PRODUCTION COMPARED TO 9M 2016
* 9M- CLEAN-EBITDA ROSE BY 11% TO EUR 25.4m YEAR-ON-YEAR
OPERATIONAL ACTIVITY
POWER PRODUCTION
In the first nine months of 2017 electricity production rose by 21% to 92 GWh compared to the same period last year, underpinned by an expansion of the weighted average capacity base by 18% and an
increase in production per unit of installed capacity (i.e. specific yield) by 2%, due to slightly better weather conditions.
2017 9M | 2016 9M | |||
Weighted average capacity | MWp | 103 | 88 | 18% |
Production | GWh | 92 | 76 | 21% |
Specific yield | kWh/kWp | 884 | 865 | 2% |
Although weather conditions in the first half of 2017 were very positive (+11 % period on period), the very poor irradiation during September 2017 has plunged the production in the third quarter of 2017 by 9% compared to the third quarter of 2016. As a result the specific yield over the full nine months of 2017 went up only slightly by 2% when compared to the first three quarters of 2016.
2017Q3 | 2016Q3 | 2017H1 | 2016H1 | ||||
Weighted average capacity | MWp | 106 | 90 | 18% | 103 | 86 | 20% |
Production | GWh | 36 | 33 | 8% | 56 | 42 | 35% |
Specific yield | kWh/kWp | 337 | 372 | -9% | 547 | 492 | 11% |
ASSET PORTFOLIO
At the time of the publication of this trading update, the capacity of the solar asset portfolio has reached 118.8 MWp (year-end 2016: 100.5 MWp). In the first half of 2017, the group has
commissioned the solar asset in Großfurra (4.082 kWp) and acquired the Belgian rooftop portfolio 'Swan Energy' with a capacity of 1.236 kWp.
INVESTMENTS | 2017 9M | 2016 9M | |||
Project | Capacity (kWp) | Projekt | Capacity (kWp) | ||
Q1 | Großfurra | 4.082 | Fahrenholz | 2.005 | |
Q2 | Swan Energy | 1.236 | Wandersleben | 1.423 | |
Groß-Stieten | 1.434 | ||||
Neubukow | 857 | ||||
Q3 | Grafentraubach III | 746 | Halberstadt | 240 | |
Nettgau (under construction) | 750 | Goldberg (under construction) | 1.750 | ||
Goldberg 2 (under construction) | 257 | Schönebeck | 3.496 | ||
Bitterfeld (under construction) | 4.606 | ||||
Q4 | Rüsselsheim | 6.661 | Mühlgrün | 1.000 | |
Ludwigsfelde (under construction) | 1.316 | ||||
Großfurra (ready-to-build) | 4.082 |
In the third quarter an additional solar asset at the site in Grafentraubach (746 kWp) was taken into operation, whereas the new-build project Nettgau (750 kWp), Goldberg 2 (257 kWp) and Bitterfeld (4,606 kWp) were under construction during the third quarter 2017. The projects Nettgau and Goldberg have been commissioned at the time of this publication. In the last quarter of 2017, the group has also acquired the largest solar project in its history, the rooftop installation in Rüsselsheim with a capacity of 6,661 kWp.