checkAd

     664  0 Kommentare JV Inkai Restructuring Takes Effect January 1, 2018

    SASKATOON, SASKATCHEWAN--(Marketwired - Dec. 11, 2017) - Cameco Corporation (Cameco) (TSX:CCO)(NYSE:CCJ) announced that the restructuring of Joint Venture Inkai LLP (JV Inkai) outlined in the implementation agreement dated May 27, 2016 with Joint Stock Company National Atomic Company Kazatomprom (Kazatomprom) and JV Inkai closed today and will take effect on January 1, 2018.

    This restructuring was subject to obtaining all required government approvals including an amendment to JV Inkai's existing Resource Use Contract with the Republic of Kazakhstan, which have been obtained.

    "This agreement is positive for Cameco as it secures our access to a large, low-cost production source through 2045," said Tim Gitzel, president and CEO of Cameco. "Production decisions will depend on market conditions and the terms of our Resource Use Contract."

    The amendment to the Resource Use Contract provides as follows:

    • JV Inkai has the right to increase production to 10.4 million pounds of U3O8 per year (Cameco's share 4.2 million pounds), an increase from the current licensed production of 5.2 million pounds (Cameco's share 3.0 million pounds)
    • JV Inkai has the right to produce from blocks 1, 2 and 3 until 2045 (currently, the lease terms are to 2024 for block 1 and to 2030 for blocks 2 and 3)
    • The current boundaries of blocks 1, 2 and 3 have been adjusted to match the agreed production profile for JV Inkai to 2045.

    Under the implementation agreement, Cameco's ownership interest in JV Inkai will be adjusted to 40% and Kazatomprom's ownership interest in JV Inkai will be adjusted to 60% on January 1, 2018. As a result, Cameco will account for JV Inkai on an equity basis commencing on January 1, 2018. Also on January 1, 2018, a new governance framework for JV Inkai protecting the rights of Cameco as a minority owner will take effect.

    Finally, the loan previously funded by a Cameco subsidiary to JV Inkai to fund exploration and evaluation of block 3 was restructured to provide for priority repayment. Such priority repayment commenced in 2017 and the balance of the loan was US $124 million at the end of the third quarter of 2017.

    The amendment to the Resource Use Contract and the adjustment to Cameco's ownership interest in JV Inkai results in material changes to Cameco's mineral reserves and mineral resources reported for Inkai.

    Inkai Mineral Reserves and Mineral Resources as of January 1, 2018

    Cameco's
    TOTAL Share
    CATEGORY TONNES GRADE Lbs U3O8 Lbs U3O8
    (thousands) %U3O8 (millions) (millions)
    RESERVES
    Proven 211,852.5 0.036 167.5 67.0
    Probable 166,913.0 0.028 102.1 40.9
    Total 378,765.5 0.032 269.6 107.9
    RESOURCES
    Measured 36,680.9 0.026 21.3 8.5
    Indicated 21,132.2 0.023 10.7 4.3
    Inferred 116,394.6 0.029 75.0 30.0
    Notes:
    (1) Cameco reports mineral reserves and mineral resources separately. Reported mineral resources do not include amounts identified as mineral reserves. Totals may not add up due to rounding.
    (2) Cameco's share is 40% of total mineral reserves and mineral resources.
    (3) The geological model used for Inkai involves geological interpretations on section and plan derived from surface drillhole information.
    (4) Mineral resources have been estimated at minimum grade-thickness cut-offs per hole of 0.047 and 0.071 m%U3O8, using 2-dimensional block models.
    (5) Inferred mineral resources are estimated on the basis of limited geological evidence and sampling, sufficient to imply but not verify geological grade and continuity. They have a lower level of confidence than that applied to an Indicated mineral resource and cannot be directly converted to a mineral reserve.
    (6) There are no known environmental, permitting, legal, title, taxation, socio-economic, political, marketing or other relevant factors that could materially affect the above estimate of mineral resources.
    (7) Mineral resources that are not mineral reserves have no demonstrated economic viability and do not meet all relevant modifying factors.
    (8) Mineral resources and mineral reserves have been estimated based on the use of the ISR extraction method with allowance for the volume contacted by the solution. The production is planned to ramp up to 10.4 million pounds of U3O8. Annual production levels will be dependent on results of further delineation drilling and market conditions.
    (9) An average price over the mine life of US $53 per pound of U3O8 was used to estimate the mineral reserves with exchange rates of $1.00 US=$1.25 Cdn and 256 Kazakhstan Tenge to $1.00 Cdn.
    (10) Mineral reserves have been estimated at a grade-thickness cut-off of 0.13 m%U3O8.
    (11) Total pounds U3O8 contained in mineral reserves are not adjusted for the estimated metallurgical recovery of 85%.
    (12) There are no known mining, metallurgical, infrastructure, permitting or other relevant factors that could materially affect the above estimate of mineral reserves.

    Compared to mineral reserves reported as of December 31, 2016, Cameco's share of JV Inkai mineral reserves increases by approximately 62 million pounds U3O8. Measured and indicated mineral resources decrease by nearly 68 million pounds and inferred mineral resources decrease by nearly 56 million pounds. Cameco will detail the changes in a new NI 43-101 technical report for JV Inkai to be filed within 45 days.

    Seite 1 von 3


    Diskutieren Sie über die enthaltenen Werte



    Verfasst von Marketwired
    JV Inkai Restructuring Takes Effect January 1, 2018 SASKATOON, SASKATCHEWAN--(Marketwired - Dec. 11, 2017) - Cameco Corporation (Cameco) (TSX:CCO)(NYSE:CCJ) announced that the restructuring of Joint Venture Inkai LLP (JV Inkai) outlined in the implementation agreement dated May 27, 2016 with Joint …

    Schreibe Deinen Kommentar

    Disclaimer