checkAd

     168  0 Kommentare Nokia completes Ceneri and Gotthard Base Tunnels communications infrastructure project - Seite 2

    Raoul Harlacher, General Project Manager, Nokia, said: “On behalf of the entire delivery team it makes us proud to be part of this ‘project of the century’ and to support AlpTransit Gotthard, SBB and Switzerland in its goal to enhance the environmentally compatible transport of goods by rail. And in addition, cutting the total journey time for passenger traffic between Zurich and Milano by up to an hour”.

    Nokia has previously deployed communications infrastructure to support mission-critical operational and passenger services at the Gotthard Base Tunnel project. As part of this latest project, Nokia integrated Ceneri Base Tunnel communications infrastructure into the Gotthard Tunnel operation control system.

    Anzeige 
    Handeln Sie Ihre Einschätzung zu Nokia Corporation!
    Long
    2,95€
    Basispreis
    0,31
    Ask
    × 10,41
    Hebel
    Short
    3,50€
    Basispreis
    0,31
    Ask
    × 10,41
    Hebel
    Präsentiert von

    Den Basisprospekt sowie die Endgültigen Bedingungen und die Basisinformationsblätter erhalten Sie bei Klick auf das Disclaimer Dokument. Beachten Sie auch die weiteren Hinweise zu dieser Werbung.

    The Ceneri and Gotthard Base Tunnels feature state-of-the-art control technologies and monitoring devices connected to the operations center via fiber optic cables, with around 70,000 data points and more than 200,000 sensors registering variables such as entry access, air quality, ventilation, fire detection and much more. In addition, a multitude of systems manage tunnel lighting, fire and smoke alarms, power supply, fire extinguishing, hazardous materials recognition, ventilation and emergency call systems.

    The Ceneri Base Tunnel
    The Ceneri Base Tunnel, which has been handed over to Swiss Federal Railways will commence service in December 2020. As part of the New Railway Link through the Alps project it is designed to deliver faster rail links across the Swiss Alps with the tunnel representing a key part of the Swiss policy to transfer freight traffic from road to rail.

    When in full operation, the Ceneri Base Tunnel will become an important southern feeder for the Gotthard Base Tunnel, as existing track over Monte Ceneri is not suitable for high-speed rail or heavy freight trains. Composed of two single-track tunnels, each 15.4 km (9.6 miles) long it bypasses the former high-altitude rail route through the Monte Ceneri Tunnel.

    About Nokia
    We create the technology to connect the world. Only Nokia offers a comprehensive portfolio of network equipment, software, services and licensing opportunities across the globe. With our commitment to innovation, driven by the award-winning Nokia Bell Labs, we are a leader in the development and deployment of 5G networks. 

    Our communications service provider customers support more than 6.4 billion subscriptions with our radio networks, and our enterprise customers have deployed over 1,300 industrial networks worldwide. Adhering to the highest ethical standards, we transform how people live, work and communicate. For our latest updates, please visit us online www.nokia.com  and follow us on Twitter @nokia.

    Media Inquiries:

    Nokia

    Communications

    Phone: +358 10 448 4900

    Email: press.services@nokia.com

     


    Seite 2 von 2


    Diskutieren Sie über die enthaltenen Werte


    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Nokia completes Ceneri and Gotthard Base Tunnels communications infrastructure project - Seite 2 Press Release Nokia completes Ceneri and Gotthard Base Tunnels communications infrastructure project Nokia responsible for project management and tunnel control system delivery for Ceneri and Gotthard Base Tunnels  Nokia’s operations …

    Schreibe Deinen Kommentar

    Disclaimer