checkAd

     118  0 Kommentare Nuinsco Announces the Ninth Consecutive Intersection of More than 100m of Continuous Critical Elements & Phosphate Mineralization at Prairie Lake

    TORONTO, ON / ACCESSWIRE / September 16, 2021 / Nuinsco Resources Limited ("Nuinsco" or the "Company") (CSE:NWI) today announced that a ninth consecutive drill hole has produced an intersection of 100m or more of Critical Elements and phosphate …

    TORONTO, ON / ACCESSWIRE / September 16, 2021 / Nuinsco Resources Limited ("Nuinsco" or the "Company") (CSE:NWI) today announced that a ninth consecutive drill hole has produced an intersection of 100m or more of Critical Elements and phosphate mineralization at its 100%-owned Prairie Lake project near Terrace Bay, Ontario with the receipt of analyses producing a 118.7m intersection in DDH NP0808.

    "The continued exceptional mineralized widths of rare earth elements, niobium, tantalum and phosphate encountered at the Prairie Lake project is more remarkable considering that the intersections commence at surface, with obvious positive implications for potential exploitation," said Paul Jones, Nuinsco's CEO. "The Prairie Lake project is exceptionally located from a logistical perspective further enhancing its value to the Company and shareholders; we will continue to aggressively evaluate the potential."

    The mineralization of economic interest contained within the Prairie Lake intrusion occurs at surface and extends to unknown depths below the deepest drilling conducted to date (circa 500m vertically). There is no indication that mineralization diminishes with depth and the nine intersections from the program reported to date occur over an interval of 530m, oriented southeast-northwest, in the Southwest ("SW") Area (see map below). The Prairie Lake complex hosts a suite of elements of economic interest identified as Critical Elements defined under the Canadian Minerals and Metals Plan ("CMMP") contained within the very large domain of mineralized rock that is extremely favourably located from a logistical perspective with rail, road, shipping, and power infrastructure already established. Prairie Lake hosts a number of elements and compounds of economic interest including those for which demand is projected to substantially increase and for which secure supply chains are sought.

    Analytical results from the 118.7 metres of continuous mineralization (from 6.3-125m) of niobium (Nb), tantalum (Ta), phosphate (P2O5), and rare earth elements (REE) including lanthanum (La), cerium (Ce), samarium (Sm), neodymium (Nd) and yttrium (Y) - analytical results are tabulated below. Eighteen drill-holes have been sampled to date as part of the program, focussing on drill-holes collared to intercept the SW area which measures 1km in length and is between 150m and 750m wide at surface. The SW area alone hosts 435-530 million tonnes of the total 515-630 million tonne ET, with grades as tabulated in the "Prairie Lake ET" table below.

    Hole ID

    From
    (m)

    To
    (m)

    Width
    (m)

    Rock
    Type*

    P2O5
    (%)

    Nb2O5
    (%)

    Ta2O5
    (%)

    Y
    (g/t)

    La 
    (g/t)

    Ce 
    (g/t)

    Nd 
    (g/t)

    Sm 
    (g/t)

    ∑REE
    (g/t)

                               
    New intersections:

    NP0808

    27.27

    44

    16.73

    CRBT

    4.25

    0.053

    0.003

    113

    404

    979

    534

    95

    2125

    48.06

    59

    10.94

    CRBT

    4.92

    0.023

    0.002

    118

    415

    1015

    566

    103

    2217

    65

    75

    10

    CRBT

    3.20

    0.055

    0.002

    88

    312

    671

    330

    59

    1460

    88.2

    103.18

    14.98

    PYX

    1.25

    0.086

    0.005

    44

    203

    475

    246

    46

    1014

    116.67

    125

    8.33

    CRBT

    3.25

    0.025

    0.002

    72

    294

    613

    290

    49

    1317

                               
    Combined extended intersection:

    NP0808

    6.3

    125

    118.7

     

    3.70

    0.073

    0.0031

    94

    345

    832

    397

    75

    1743

    Principal rock type: CRBT=carbonatite; IJ-PYX BX = breccia with crbt matrix & ijolite or pyroxenite clasts; MEL-IJ = melano-ijolite.
    ∑REE = Sum of Y, La, Ce, Nd, Sm; Y - yttrium, La - lanthanum, Ce - cerium, Nd - neodymium, Sm - samarium.
    P2O5 - phosphate, Nb2O5 - niobium oxide, Ta2O5 - tantalum oxide, 1g/t = 1 ppm

    The Prairie Lake project consists of 46 mineral claims covering an area of ~630 ha. Prairie Lake is superbly located, easily accessed by an all-weather road from the TransCanada Highway located 28 kilometres to the south. The ET is defined by 59 diamond drill holes.

    All samples were analysed by Activation Laboratories (ActLabs) in Ancaster, Ontario. Samples were analysed for a whole rock and trace element ICP analytical package as well as for niobium, tantalum, and zirconium oxides using a fusion XRF method. An internal Quality Control Quality Assurance (QAQC) program was implemented with four QAQC samples (blanks and reference standards) added into the sampling stream.

    Prairie Lake Drilling & Trenching by Target Area1:

       

    SW

    Jim's Showing

    East

    NE

    Other Areas

    Total

    Historic Drill Holes (1969-1983)

    Drill Holes

    16

    11

    1

    0

    17

    45

    Metres

    1351.7

    938.4

    34.1

    0

    1528.5

    3852.7

    Drill Holes (2007-2010)

    Drill Holes

    21

    10

    0

    0

    1

    32

    Metres

    6632

    1692.4

    0

    0

    101

    8425.4

    Trenches (2010)

    Trenching

    1

    0

    2

    2

    0

    5

    Metres

    377.7

    0

    433.0

    754.55

    0

    1562.2

    1 Trench lengths are calculated as cumulative length of samples along trench.

    Prairie Lake ET2:

     

    SW

    Jim's Showing

    East

    NE

    Total

    REEs          
    La (ppm) Lanthanum

    275 - 340

    295 - 360

    305 - 370

    200 - 250

    280 - 340

    Ce (ppm) Cerium

    650 - 790

    670 - 820

    670 - 820

    450 - 550

    650 - 790

    Sm (ppm) Samarium

    55 - 70

    55 - 70

    55 - 70

    50 - 60

    55 - 70

    Nd (ppm) Neodymium

    295 - 360

    290 - 360

    320 - 390

    235 - 290

    300 - 360

    Y (ppm) Yttrium

    85 - 100

    90 - 110

    80 - 100

    135 - 170

    85 - 100

    La+Ce+Sm+Nd+Y (ppm)

    1360 - 1660

    1400 - 1720

    1430 - 1750

    1070 - 1320

    1370 - 1660

    Additional Elements (as oxides)          
    P2O5 (%) Phosphate

    3.0 - 4.0

    3.5 - 4.5

    2.5 - 3.0

    2.5 - 3.5

    3.0 - 4.0

    Nb2O5 (%) Niobium

    0.095 - 0.115

    0.100 - 0.120

    0.040 - 0.050

    0.085 - 0.105

    0.090 - 0.110

    Ta2O5 (ppm) Tantalum

    18 - 25

    25 - 30

    5 - 7

    10 - 12

    18 - 21

    Volume - m3 (million)

    140 - 175

    12 - 14

    13 - 16

    2 - 3

    170 - 210

    Tonnes (million)

    435 - 530

    35 - 45

    40 - 50

    7 - 8

    515 - 630

    2 A full description of methodology used to estimate the Prairie Lake Project Exploration Target is contained in the Technical Report dated 30 November 2018 prepared by P&E Mining Consultants Inc. that is filed on SEDAR. The potential quantity and grade of the ET is conceptual in nature and there has been insufficient exploration to define a mineral resource. It is uncertain if further exploration will result in the discovery of a mineral resource. There is no National Instrument 43-101 - Standards of Disclosure for Mineral Projects preliminary economic assessment in respect of the Prairie Lake ET.

    Laura Giroux, P.Geo, Chief Geologist, acts as Nuinsco's Qualified Person under National Instrument 43-101. Ms. Giroux has reviewed and approved the technical contents of this news release.

    About Nuinsco Resources Limited

    Nuinsco Resources has over 50 years of exploration suc­cess and is a growth-oriented, multi-commodity mineral explora­tion and development company focused on prospective oppor­tunities in Canada and internationally. Currently the Company has four properties in Ontario - the high-grade Sunbeam gold property near Atikokan, the Dash Lake gold property near Terrace Bay, the large multi-commodity (rare-earths, niobi­um, tantalum, phosphate) Prairie Lake project near Terrace Bay, and the Zig Zag Lake property (lithium, tantalum) near Armstrong. In addition, Nuinsco has an agreement for gold exploitation at the El Sid project in the Eastern Desert of Egypt.

    Forward-Looking Statements

    This news release contains certain "forward-looking statements." All statements, other than statements of historic fact, that address activities, events or developments that Nuinsco believes, expects or anticipates will or may occur in the future are forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek," "anticipate," "believe," "plan," "estimate, "expect," and "intend" and statements that an event or result "may," "will," "can," "should," "could," or "might" occur or be achieved and other similar expressions. These forward-looking statements reflect the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of Nuinsco to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings, capital and other costs varying significantly from estimates, production rates varying from estimates, changes in world copper and/or gold markets, changes in equity markets, uncertainties relating to the availability and costs of financing needed in the future, equipment failure, unexpected geological conditions, imprecision in resource estimates, success of future development initiatives, competition, operating performance of facilities, environmental and safety risks, delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Nuinsco disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although Nuinsco believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

    To learn more, please visit www.nuinsco.ca or contact:

    Paul Jones, CEO
    paul.jones@nuinsco.ca

    Sean Stokes, Executive VP
    sean.stokes@nuinsco.ca

    Cathy Hume, Consultant
    cathy@chfir.com

    Instagram: @nuinscoresources
    Twitter: @NWIResources

    SOURCE: Nuinsco Resources Limited



    View source version on accesswire.com:
    https://www.accesswire.com/664373/Nuinsco-Announces-the-Ninth-Consecut ...



    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Nuinsco Announces the Ninth Consecutive Intersection of More than 100m of Continuous Critical Elements & Phosphate Mineralization at Prairie Lake TORONTO, ON / ACCESSWIRE / September 16, 2021 / Nuinsco Resources Limited ("Nuinsco" or the "Company") (CSE:NWI) today announced that a ninth consecutive drill hole has produced an intersection of 100m or more of Critical Elements and phosphate …