checkAd

Azincourt Energy Commences Road/Camp Preparation at the East Preston Uranium Project

VANCOUVER, British Columbia, Dec. 08, 2021 (GLOBE NEWSWIRE) -- AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTCQB: AZURF), is pleased to announce that preparation of the winter road to allow access for the winter 2022 exploration program has commenced at the East Preston uranium project, located in the western Athabasca Basin, Saskatchewan, Canada.

Accurate Industries has been contracted to prepare and maintain the 60 km winter access road under the supervision of TerraLogic Exploration Inc.  The road allows access from Provincial Highway 955 along the Cree Lake Road to the planned camp site on the East Preston Project.  Several waterways and swampy areas are required to be crossed, so early preparation is essential to ensure that these areas are properly prepared and frozen to allow safe access for the winter season. 

East Preston Targets

The primary target area for the 2022 program continues to be the conductive corridors from the A-Zone through to the G-Zone (A-G Trend) and the K-Zone through to the Q-Zone (K-Q Trend) (Figures 1 and 2).  The selection of these trends is based on a compilation of results from the 2018 through 2020 ground-based EM and gravity surveys, property wide VTEM and magnetic surveys, and the 2019 through 2021 drill programs, the 2020 HLEM survey indicates multiple prospective conductors and structural complexity along these corridors.

The 2019-2021 drilling programs on the A-G Trend confirmed that geophysical conductors comprise structurally disrupted zones that are host to accumulations of graphite, sulphides, and carbonates. Anomalous radioactivity has been demonstrated to exist within these structurally disrupted conductor zones. The 2022 drilling program will target similar structurally disrupted zones prioritized on the presence and strength of corresponding electromagnetic, magnetic and gravity geophysical anomalies. 

Winter 2022 Diamond Drilling Program

Terralogic Exploration Inc. has been contracted to facilitate and execute a planned diamond drilling program, which will consist of a minimum of 6,000m of drilling in 30-35 drill holes.  Drilling will focus on the A-G and K-Q trends, commencing in the G Zone where the 2021 drill program ended.  The program will continue to test the G zone to the south and then move to test the K-Q trend.  The program may be modified as results warrant.

Seite 1 von 3


Wertpapier



0 Kommentare
Nachrichtenquelle: globenewswire
08.12.2021, 14:00  |  57   |   |   

Schreibe Deinen Kommentar

Bitte melden Sie sich an, um zu kommentieren. Anmelden | Registrieren

 

Disclaimer

Azincourt Energy Commences Road/Camp Preparation at the East Preston Uranium Project VANCOUVER, British Columbia, Dec. 08, 2021 (GLOBE NEWSWIRE) - AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTCQB: AZURF), is pleased to announce that preparation of the winter road to allow access for the winter 2022 …

Nachrichten des Autors

Titel
Titel
Titel
Titel