Goliath Mobilizes for 18,000 Meters of Drilling Including Maiden Drill Program on Newly Discovered Goldswarm Zone at Golddigger Project, Golden Triangle, B.C.
- The 2023 drill campaign includes 70 holes from 21 separate drill pad locations with four diamond drill rigs for a planned 18,000 meters.
-
This drilling/exploration season will focus on new discoveries and further upside potential:
-
Expand the footprint and higher-grade mineralized areas of the Surebet Zone & Bonanza Shear.
- A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/ebfddf3a-3685-4e40 ...
-
Expand the footprint and higher-grade mineralized areas of the Surebet Zone & Bonanza Shear.
-
Expand the footprint of the Surebet Extension to the northeast and southeast.
-
Drill test Surebet’s extensive porphyry feeder source confirmed by Colorado School of Mines within the newly identified high-grade Golden Gate Feeder Zone where angular float samples
assayed up to 924.4 g/t Au (29.7 oz/t Au), 3023 g/t Ag (97.19 oz/t Ag), 0.05% Cu, 12.59% Pb, 4.11% Zn.
- A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/8d6bd965-632c-44ce ...
-
Follow up exploration within the newly discovered mineralized Surebet Corridor for the development of new high-grade 2024 drill targets; currently an area of 8 km x 3.5 km that remains
open.
Diskutieren Sie über die enthaltenen Werte
Aktuelle Themen
Weitere Artikel des Autors
3 im Artikel enthaltene WerteIm Artikel enthaltene Werte