checkAd

     293  0 Kommentare Northern Gold Completes Geotechnical Study and Intersects 4.10 g/t Over 17 Metres at Garrison

    TORONTO, ONTARIO--(Marketwired - March 26, 2014) - NORTHERN GOLD MINING INC. (TSX VENTURE:NGM) ("Northern Gold" or the "Company") is pleased to announce the completion of the geotechnical assessment of the Garrcon Bulk sample project planned for May 2014. As announced on January 16, 2014, the Company plans to submit an advanced exploration closure plan to complete a bulk sample from the Garrcon deposit of its wholly owned Garrison Gold Property. Pending regulatory approval, the closure plan and related permits will allow the company to extract up to 150,000 tonnes from the Garrcon deposit. In the third quarter of 2014, the bulk sample stockpile will be toll milled. The test mining should allow the Company to gather the data necessary to complete a pre-feasibility study of the deposit.

    Pursuant to regulations in Part 2 and Part 8 of the Mine Rehabilitation Code of Ontario, Schedule 1, O.Reg.240/00, a geotechnical assessment for the Garrcon bulk sample pits was completed by Terrane Geoscience Inc. ("Terrane") of Halifax, Nova Scotia under the direction of Tony Gilman, P.Eng. Utilizing geotechnical field mapping and two oriented diamond drill holes in addition to compressive strength testing, Terrane completed geotechnical analysis to design stable slopes for the Garrcon Bulk sample open pits. The results of this analysis have given a slope that is considered safe with a bench face angle of 80° and overall slope angle of 66° for a total slope height of 15 m.

    The two diamond drill holes were drilled within the boundary of the East and West bulk sample pit domains and showed assay results consistent with Northern Gold's previous diamond drilling in the area. Each of the holes were 51m in length for a total of 102m.

    GGT-13-01 was drilled north into the west pit domain in shallow overburden and interested gold mineralization within the pit domain. GGT-13-02 was drilled east into the east pit domain and intersected shallow overburden and significant gold mineralization in the upper 15m of the east pit domain.

    Assay highlights from the drill holes include:

    • 2.40 g/t Au over 12.0m (7.0m-19.0m) GGT-13-01
    • 4.10 g/t Au over 17.0m (3.0-20.0m) GGT-13-02

    The Garrcon deposit is hosted in Temiskaming Type metasediments along the footwall of the Destor-Porcupine Fault. Brittle stockwork veins and vein arrays form a network of gold mineralization within the metasedimentary host. The deposit has a NI 43-101 compliant resource as announced on March 3, 2014 which contains a measured and indicated resource of 1.05 million ounces at 1.12 grams per tonne and an inferred mineral resource of 616,000 ounces at 2.80 grams per tonne.

    Seite 1 von 5





    Verfasst von Marketwired
    Northern Gold Completes Geotechnical Study and Intersects 4.10 g/t Over 17 Metres at Garrison TORONTO, ONTARIO--(Marketwired - March 26, 2014) - NORTHERN GOLD MINING INC. (TSX VENTURE:NGM) ("Northern Gold" or the "Company") is pleased to announce the completion of the geotechnical assessment of the Garrcon Bulk sample project planned for May …