checkAd

     604  0 Kommentare Paramount Gold and Silver Discovers New High Grade Structure on San Miguel Project in Mexico - Seite 2

    The current drill program at San Miguel has three objectives (see news release of September 2, 2014):

    1. Test new, recently identified targets like Dana.
    2. Convert inferred resources within the proposed underground mine plan to measured and indicated. About 18% of the underground minable material in our PEA is inferred. The aim is to have 100% of the resource as measured and indicated so that it will qualify as reserves in a Preliminary Feasibility Study.
    3. Acquire material for metallurgical testing and geotechnical studies.

    Paramount is continuing its drill program with four core rigs.

    About Paramount

    Paramount is a U.S.-based exploration and development company with multi-million ounce advanced stage precious metals projects in northern Mexico (San Miguel) and Nevada (Sleeper). Fully-funded exploration and engineering programs are now in progress at these two core projects which are expected to generate substantial additional value for our shareholders.

    The San Miguel Project consists of over 100,000 hectares (over 247,000 acres) in the Palmarejo District of northwest Mexico, making Paramount the largest claim holder in this rapidly growing precious metals mining camp. The San Miguel Project is ideally situated near established, low cost production where the infrastructure already exists for early, cost-effective exploitation. A second Preliminary Economic Assessment (PEA) for San Miguel was completed and announced on August 25, 2014.

    The Sleeper Gold Project is located off a main highway about 25 miles from the town of Winnemucca. In 2010, Paramount acquired a 100% interest in the project including the original Sleeper high-grade open pit mine operated by Amax Gold from 1986 to 1996 as well as staked and purchased lands now totaling 2,570 claims and covering about 47,500 acres which stretch south down trend to Newmont's Sandman project. This acquisition is consistent with the Company's strategy of district-scale exploration near infrastructure in established mining camps. A PEA was completed for Sleeper and announced on July 30, 2012.

    Cautionary Note to U.S. Investors Concerning Estimates of Indicated and Inferred Resources

    This news release uses the terms "measured and indicated resources" and "inferred resources." We advise U.S. investors that while these terms are defined in, and permitted by, Canadian regulations, these terms are not defined terms under SEC Industry Guide 7 and not normally permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves," as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into reserves. U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.

    Seite 2 von 3


    Diskutieren Sie über die enthaltenen Werte



    Verfasst von Marketwired
    Paramount Gold and Silver Discovers New High Grade Structure on San Miguel Project in Mexico - Seite 2 WINNEMUCCA, NEVADA--(Marketwired - Oct. 15, 2014) - Paramount Gold and Silver Corp. (NYSE MKT:PZG)(TSX:PZG)(FRANKFURT:P6G) on the first drill hole of the exploration program recently initiated on its 100%-owned San Miguel Project in northern Mexico …