Calibre Mining Further Expands Gold-Silver Vein Systems and Discovers New Zone at Eastern Borosi Project, Northeast Nicaragua
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 15, 2016) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce the third set of results from the 2016 drilling program on the Eastern Borosi Project, Nicaragua which is being funded by Calibre's partner IAMGOLD Corporation ("IAMGOLD").
Highlights
- Drilling to date in 2016 consists of 30 diamond drill holes for a total of 6,008 metres, with results for 8 new holes reported in this news release
- A step out hole on the East Dome Structure has intersected 15.35 metres grading 1.21 g/t gold and 120.9 g/t silver, including 3.00 metres grading 3.61 g/t gold and 348.7 g/t silver, and a second step out hole intersected of 16.50 metres grading 2.27 g/t gold and 127.9 g/t silver, including 3.38 metres grading 9.64 g/t gold and 404.4 g/t silver
- The first drilling on the Veta Loca gold target has intersected 6.31 metres grading 10.15 g/t gold and 6.9 g/t silver, including 0.79 metres grading 46.20 g/t gold and 10.5 g/t silver
- Diamond drilling of the Blag Gold-Silver Vein System continues to extend the defined mineralization at the Main Blag Structure with an intercept of 6.23 metres grading 2.60 g/t gold and 10.5 g/t silver
Recent Drill Highlights from Eastern Borosi Gold-Silver Project
Hole ID | Target |
From m |
To m |
Length (m) |
Au (g/t) |
Ag (g/t) |
Pb (ppm) |
Zn (ppm) |
BL16-042 | Main Blag | 307.77 | 314.00 | 6.23 | 2.60 | 10.5 | 5,346 | 9,228 |
BL16-043 | East Dome | 97.65 | 113.00 | 15.35 | 1.21 | 120.9 | 53 | 74 |
including | East Dome | 110.00 | 113.00 | 3.00 | 3.61 | 348.7 | 93 | 78 |
BL16-044 | East Dome | 194.00 | 210.50 | 16.50 | 2.27 | 127.9 | 620 | 414 |
including | East Dome | 206.17 | 209.55 | 3.38 | 9.64 | 404.4 | 2,868 | 1,222 |
GP16-046 | Veta Loca | 88.00 | 94.31 | 6.31 | 10.15 | 6.9 | 17 | 53 |
including | Veta Loca | 88.00 | 88.79 | 0.79 | 46.20 | 10.5 | 77 | 57 |
Notes: | - Intervals are core lengths / true width are estimated to be 70-80% of lengths |
- Length weighted averages from uncut assays. |
IAMGOLD Option - Eastern Borosi Project
Lesen Sie auch
Diskutieren Sie über die enthaltenen Werte
Aktuelle Themen
1 im Artikel enthaltener WertIm Artikel enthaltene Werte