DGAP-News
International Lithium Corp. and Pioneer Resources Intersect Spodumene Bearing Pegmatite at the Mavis Lithium Pegmatite Project, Ontario, Canada - Seite 2
highlighted intersection; however the reader should be cautioned that
neither the qualified person nor the Company make any assumptions or
inferences as to the degree of mineralisation or grade.
Table 1. Drill Hole Collar Details
Hole ID Datum | East | North | RL | Azimuth | Dip | Depth | Core |
(m) | (m) | (m) | (o) | (o) | (m) | (m) |
MF-17-39 UTM15N/NAD83 524384 5518027 420 80 -70 179 171.5
The coordinates have been determined using a hand-held GPS and therefore
typically have an accuracy of within 5m.
THE 2017 Mavis Lake Drilling Programme
MF-17-39 is the first hole of a programme of up to 1,500 metres of oriented
diamond core drilling on the Mavis Lithium Pegmatite Project. Additional
details regarding the drill programme can be referred to in the Company's
news release dated February 6.
Hole MF-17-39 was specifically designed to intersect the high-grade lithium
pegmatite in the vicinity of the major intersections encountered in holes
MF-11-12 and MF-12-24, down dip from Pegmatite 6 observed in outcrop. The
objective was to drill at an oblique angle to historic drilling to assist
in determining the attitude of Pegmatite 6 at depth.
The following are major drill intersections down dip from Pegmatite 6 in
vicinity to the highlighted intersection in Hole MF-17-39:
Lesen Sie auch
-
MF-11-12: 26.25m at 1.55% Li2O from 152.0m; and
-
MF-12-24: 16.40m at 1.86% Li2O from 161.9m