Komet Announces First Drilling Results From Dabia South in Mali
QUEBEC CITY, QUEBEC--(Marketwired - March 27, 2017) - Komet Resources Inc. ("Komet" or the "Company") (TSX VENTURE:KMT) is pleased to announce the first drilling results on its Dabia South permit (formerly known as Moussala) located in Mali. The first shallow six holes were drilled on the south portion of the Kabaya gold zone. The RC drilling sections are located within a north-south oriented corridor and cover a 50 meters width, drill hole true width is not determined. Among results, hole 06 reported 12.23 g/t over 3 meters. These new results complement the preceding historical intersections announced in the June 21, 2016, press release.
Table of the results:
Drill hole |
From (m) |
To (m) |
Length (m) |
Au (g/t) |
Km2016rc01 | 33 | 44 | 11 | 1.65 |
including | 37 | 39 | 2 | 5.56 |
Km2016rc01 | 70 | 80 | 10 | 0.73 |
Km2016rc02 | 23 | 27 | 4 | 0.49 |
Km2016rc03 | 48 | 56 | 8 | 2.29 |
including | 51 | 53 | 2 | 6.74 |
Km2016rc03 | 66 | 81 | 14 | 0.59 |
Km2016rc04 | 5 | 9 | 4 | 0.60 |
Km2016rc05 | 40 | 48 | 8 | 0.39 |
Km2016rc06 | 39 | 47 | 8 | 1.61 |
Km2016rc06 | 51 | 62 | 11 | 3.72 |
including | 53 | 56 | 3 | 12.23 |
Samples were analyzed by merger fusion on a grip of 50g pulp and ppm finish for the gold at the independent SGS Laboratory, Bamako, Mali. Sampling on site is done by professional geologists and Quality Assurance/Quality Control and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices, including the introduction of standards, blanks and duplicates with every batch of 20 samples analyzed.