checkAd

     113  0 Kommentare Temas Files Preliminary Economic Assessment Report for La Blache and Clarifies February 7th Release - Seite 2

    CAD $ Billion

    15.9

    14.9

    Post-Tax IRR

    %

    55.1

    60.8

    Post-Tax Net Present Value (NPV8)

    CAD $ Billion

    6.8

    6.6

    Tim Fernback, President of Temas comments, "We are extremely pleased with the strong economics presented in this PEA on the La Blache Titanium-Vanadium-Iron Project in Quebec. Titanium has been trading well above our assumptions of USD $2,200 per tonne for over three years and at over USD $3,000 per tonne since August 2022. We believe this trend will continue due to the increasing demand for TiO2, major global supply coming to end of life, and lack of both brownfield expansion and new projects coming online in North America. The PEA further increases our confidence in the Project and showcases our proprietary, environmentally friendly extraction technology. With a current market cap of CAD $5M, I am excited to engage with all our stakeholders to unlock the value of this highly robust Project as we advance the asset forward."

    Summary of Preliminary Economic Assessment

    The PEA report posted to SEDAR+ was prepared independently by ERM, under the supervision of QP Garth Liukko, P.Eng. (PEO); and the mineral resource estimate was prepared under the supervision of Jacques Dumouchel, P.Geo (OGQ).

    The PEA was prepared in accordance with the requirements of National Instrument 43-101 and is based on the Mineral Resource Estimate for La Blache with an effective date of March 27, 2024.

    Cautionary Note

    Lesen Sie auch

    The PEA summarized in this news release is considered preliminary in nature, contains numerous assumptions and includes Inferred Mineral Resources that are considered too speculative, geologically, to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the results of the PEA will be realized. No Mineral Reserves have been estimated for La Blache. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Inferred Mineral Resources are that part of the Mineral Resource for which quantity and grade, or quality are estimated based on limited geologic evidence and sampling, which is sufficient to imply but not verify grade or quality continuity. Inferred Mineral Resources may not be converted to mineral reserves. It is reasonably expected, though not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. Mineral Resources are captured within an optimized mine plan (within the constraints of a PEA) and meet the test of reasonable prospects for economic extraction.

    Seite 2 von 5



    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Temas Files Preliminary Economic Assessment Report for La Blache and Clarifies February 7th Release - Seite 2 VANCOUVER, BC / ACCESSWIRE / March 28, 2024 / Temas Resources Corp. ("Temas" or the "Company") (CSE:TMAS) is pleased to report the filing of an Independent Technical Report and Preliminary Economic Assessment ("PEA") on SEDAR+ for the wholly-owned …