Americas Silver Corp: Junior Gold- und Silberproduzent (Seite 4)
eröffnet am 08.06.15 16:50:26 von
neuester Beitrag 10.04.24 19:33:56 von
neuester Beitrag 10.04.24 19:33:56 von
Beiträge: 717
ID: 1.213.827
ID: 1.213.827
Aufrufe heute: 0
Gesamt: 162.462
Gesamt: 162.462
Aktive User: 0
ISIN: CA03062D1006 · WKN: A2PRX2 · Symbol: USAS
0,2777
USD
+4,87 %
+0,0129 USD
Letzter Kurs 02:04:00 AMEX
Neuigkeiten
21.03.24 · globenewswire |
20.03.24 · globenewswire |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
2,6900 | +23,96 | |
5,1500 | +21,75 | |
15,890 | +21,67 | |
0,8900 | +17,11 | |
0,9000 | +16,13 |
Wertpapier | Kurs | Perf. % |
---|---|---|
1,1200 | -6,67 | |
0,5180 | -7,09 | |
10,040 | -7,89 | |
0,5700 | -8,06 | |
46,88 | -97,99 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 74.367.410 von elsifee am 23.08.23 15:49:03Do hätsch besser no gwardet.
Was geht...
Wir bewegen uns langsam in die richtige Richtung, nur noch ein Verlust von 2 Cent, ein weiteres Quartal, um profitabel zu werden und der Silberpreis über $ 30,00 liegt, dann brennt hier die Hüte. Heute zu 0,37 Nachgekauft.
Antwort auf Beitrag Nr.: 73.615.990 von Max_Investor am 04.04.23 19:21:04
und? was sagen uns die Daten? Wünschte die Frittenbude würde einmal was über ihre brach liegende Mine melden....
Zitat von Max_Investor: Americas Gold and Silver Provides Galena Complex Update
TORONTO, ONTARIO - April 4, 2023 - Americas Gold and Silver Corporation (TSX: USA) (NYSE American: USAS) ("Americas" or the "Company"), a growing North American precious metals producer, is pleased to provide an update for its Galena Complex Joint Venture (60% Americas / 40% Eric Sprott).
Highlights
Recent drilling at the Galena Complex has focused on deep extensions to the far east of the operation at the Caladay Zone and infilling a drilling gap at the 360 Complex, with significant drill results highlighting the potential to expand currently modelled resources to the east and increase mineral resource at depth.
Hole 46-324: 299 g/t silver and 12.0% lead (731 g/t silver equivalent [[1]]) over 7.3 m [[2]]
including: 415 g/t silver and 14.4% lead (934 g/t silver equivalent) over 1.1 m
including: 521 g/t silver and 24.5% lead (1,404 g/t silver equivalent) over 1.1 m
Hole 49-626: 650 g/t silver and 11% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Development on the 3700 Level in late 2022 allowed access to high-grade silver stopes and development has started on the 4300 Level to access additional stopes to coincide with the completion on the Galena Hoist which is expected to boost tonnage and overall production in H2-2023.
The Galena Hoist project remains on track to be completed and become fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and overall operational economics due to the benefits of scaling on the existing cost base.
"The Galena Complex has had a solid production start to 2023 and we anticipate providing Q1-2023 production results towards the middle of April. The anticipated completion of the Galena Hoist by the end of the second quarter is expected to build on this early performance with the additional hoisting capacity and operational flexibility," stated Americas President and CEO Darren Blasutti. "We are also very encouraged by the drill results from the 4600 Level and 4900 Level. The 4600 Level results could add and expand near-term mining areas in the 360 Complex while the deeper drilling from the 4900 Level could add new mining zones that are not included in our current mineral reserve or mineral resource."
Galena Complex Update
The Galena Complex has had a strong start to the year. The Company began mining the 3700 Level high-grade silver ore in mid-December 2022 and recently started development on the 4300 Level to access the Upper 360 Complex reserve area. The 4300 Level mining front will increase the number of producing stopes and boost production output to coincide with the completion of the Galena Hoist. The Galena Hoist project remains on track to be completed and be fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and improve operational economics due to the benefits of scaling on the existing cost base.
A diamond drill was relocated during the first quarter to the 4900 Level, while development to the final planned drill station on the 5500 Level is completed, to drill the projected down dip extension of the 360 Complex. This drill is also targeting the Caladay Zone which has historically been underexplored and is located east of all existing production workings. Hole 49-626 encountered high-grade mineralization approximately 10 meters above the 5500 Level and approximately 350 meters east of the nearest development on the 5500 Level. This area contains no current mineral reserve or mineral resource and has potential to be a new high-grade zone production zone for the property.
Hole 49-626: 650 g/t silver and 11.0% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Hole 49-627: 203 g/t silver and 12.5% lead (653 g/t silver equivalent) over 1.8 m
and: 335 g/t silver and 12.3% lead (777 g/t silver equivalent) over 0.9 m
and: 185 g/t silver and 8.3% lead (484 g/t silver equivalent) over 1.3 m
and: 744 g/t silver and 35.8% lead (2,033 g/t silver equivalent) over 0.7 m
A full table of drill results can be found at:
https://americas-gold.com/site/assets/files/4297/dr20230404.…
und? was sagen uns die Daten? Wünschte die Frittenbude würde einmal was über ihre brach liegende Mine melden....
Americas Gold and Silver Provides Galena Complex Update
TORONTO, ONTARIO - April 4, 2023 - Americas Gold and Silver Corporation (TSX: USA) (NYSE American: USAS) ("Americas" or the "Company"), a growing North American precious metals producer, is pleased to provide an update for its Galena Complex Joint Venture (60% Americas / 40% Eric Sprott).
Highlights
Recent drilling at the Galena Complex has focused on deep extensions to the far east of the operation at the Caladay Zone and infilling a drilling gap at the 360 Complex, with significant drill results highlighting the potential to expand currently modelled resources to the east and increase mineral resource at depth.
Hole 46-324: 299 g/t silver and 12.0% lead (731 g/t silver equivalent [[1]]) over 7.3 m [[2]]
including: 415 g/t silver and 14.4% lead (934 g/t silver equivalent) over 1.1 m
including: 521 g/t silver and 24.5% lead (1,404 g/t silver equivalent) over 1.1 m
Hole 49-626: 650 g/t silver and 11% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Development on the 3700 Level in late 2022 allowed access to high-grade silver stopes and development has started on the 4300 Level to access additional stopes to coincide with the completion on the Galena Hoist which is expected to boost tonnage and overall production in H2-2023.
The Galena Hoist project remains on track to be completed and become fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and overall operational economics due to the benefits of scaling on the existing cost base.
"The Galena Complex has had a solid production start to 2023 and we anticipate providing Q1-2023 production results towards the middle of April. The anticipated completion of the Galena Hoist by the end of the second quarter is expected to build on this early performance with the additional hoisting capacity and operational flexibility," stated Americas President and CEO Darren Blasutti. "We are also very encouraged by the drill results from the 4600 Level and 4900 Level. The 4600 Level results could add and expand near-term mining areas in the 360 Complex while the deeper drilling from the 4900 Level could add new mining zones that are not included in our current mineral reserve or mineral resource."
Galena Complex Update
The Galena Complex has had a strong start to the year. The Company began mining the 3700 Level high-grade silver ore in mid-December 2022 and recently started development on the 4300 Level to access the Upper 360 Complex reserve area. The 4300 Level mining front will increase the number of producing stopes and boost production output to coincide with the completion of the Galena Hoist. The Galena Hoist project remains on track to be completed and be fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and improve operational economics due to the benefits of scaling on the existing cost base.
A diamond drill was relocated during the first quarter to the 4900 Level, while development to the final planned drill station on the 5500 Level is completed, to drill the projected down dip extension of the 360 Complex. This drill is also targeting the Caladay Zone which has historically been underexplored and is located east of all existing production workings. Hole 49-626 encountered high-grade mineralization approximately 10 meters above the 5500 Level and approximately 350 meters east of the nearest development on the 5500 Level. This area contains no current mineral reserve or mineral resource and has potential to be a new high-grade zone production zone for the property.
Hole 49-626: 650 g/t silver and 11.0% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Hole 49-627: 203 g/t silver and 12.5% lead (653 g/t silver equivalent) over 1.8 m
and: 335 g/t silver and 12.3% lead (777 g/t silver equivalent) over 0.9 m
and: 185 g/t silver and 8.3% lead (484 g/t silver equivalent) over 1.3 m
and: 744 g/t silver and 35.8% lead (2,033 g/t silver equivalent) over 0.7 m
A full table of drill results can be found at:
https://americas-gold.com/site/assets/files/4297/dr20230404.…
TORONTO, ONTARIO - April 4, 2023 - Americas Gold and Silver Corporation (TSX: USA) (NYSE American: USAS) ("Americas" or the "Company"), a growing North American precious metals producer, is pleased to provide an update for its Galena Complex Joint Venture (60% Americas / 40% Eric Sprott).
Highlights
Recent drilling at the Galena Complex has focused on deep extensions to the far east of the operation at the Caladay Zone and infilling a drilling gap at the 360 Complex, with significant drill results highlighting the potential to expand currently modelled resources to the east and increase mineral resource at depth.
Hole 46-324: 299 g/t silver and 12.0% lead (731 g/t silver equivalent [[1]]) over 7.3 m [[2]]
including: 415 g/t silver and 14.4% lead (934 g/t silver equivalent) over 1.1 m
including: 521 g/t silver and 24.5% lead (1,404 g/t silver equivalent) over 1.1 m
Hole 49-626: 650 g/t silver and 11% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Development on the 3700 Level in late 2022 allowed access to high-grade silver stopes and development has started on the 4300 Level to access additional stopes to coincide with the completion on the Galena Hoist which is expected to boost tonnage and overall production in H2-2023.
The Galena Hoist project remains on track to be completed and become fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and overall operational economics due to the benefits of scaling on the existing cost base.
"The Galena Complex has had a solid production start to 2023 and we anticipate providing Q1-2023 production results towards the middle of April. The anticipated completion of the Galena Hoist by the end of the second quarter is expected to build on this early performance with the additional hoisting capacity and operational flexibility," stated Americas President and CEO Darren Blasutti. "We are also very encouraged by the drill results from the 4600 Level and 4900 Level. The 4600 Level results could add and expand near-term mining areas in the 360 Complex while the deeper drilling from the 4900 Level could add new mining zones that are not included in our current mineral reserve or mineral resource."
Galena Complex Update
The Galena Complex has had a strong start to the year. The Company began mining the 3700 Level high-grade silver ore in mid-December 2022 and recently started development on the 4300 Level to access the Upper 360 Complex reserve area. The 4300 Level mining front will increase the number of producing stopes and boost production output to coincide with the completion of the Galena Hoist. The Galena Hoist project remains on track to be completed and be fully operational by the end of Q2-2023 which will support plans to increase production, improve operational flexibility and improve operational economics due to the benefits of scaling on the existing cost base.
A diamond drill was relocated during the first quarter to the 4900 Level, while development to the final planned drill station on the 5500 Level is completed, to drill the projected down dip extension of the 360 Complex. This drill is also targeting the Caladay Zone which has historically been underexplored and is located east of all existing production workings. Hole 49-626 encountered high-grade mineralization approximately 10 meters above the 5500 Level and approximately 350 meters east of the nearest development on the 5500 Level. This area contains no current mineral reserve or mineral resource and has potential to be a new high-grade zone production zone for the property.
Hole 49-626: 650 g/t silver and 11.0% lead (1,054 g/t silver equivalent) over 7.7 m
including: 1,209 g/t silver and 16.3% lead (1,815 g/t silver equivalent) over 0.6 m
including: 521 g/t silver and 6.4% lead (759 g/t silver equivalent) over 1.1 m
including: 1,797 g/t silver and 27.5% lead (2,817 g/t silver equivalent) over 1.0 m
including: 1,005 g/t silver and 25.1% lead (1,914 g/t silver equivalent) over 0.8 m
Hole 49-627: 203 g/t silver and 12.5% lead (653 g/t silver equivalent) over 1.8 m
and: 335 g/t silver and 12.3% lead (777 g/t silver equivalent) over 0.9 m
and: 185 g/t silver and 8.3% lead (484 g/t silver equivalent) over 1.3 m
and: 744 g/t silver and 35.8% lead (2,033 g/t silver equivalent) over 0.7 m
A full table of drill results can be found at:
https://americas-gold.com/site/assets/files/4297/dr20230404.…
Gestern an der NYSE Ausbruch aus der umgekehrten Kopf-Schulter Trendwendeformation bei satten Handelsumsätzen. Vorausgesetzt das ist keine inszenierte Bullenfalle sieht das richtig gut aus....
Zahlen finde ich katastrophal....:
https://www.goldseiten.de/artikel/558646--Americas-Gold-and-…
Der Ausblick ist aber schon verlockend...:
Further increases in silver production to a range of 3.4 - 3.8 million ounces and silver equivalent production to 7.0 - 7.4 million ounces are projected for 2024, representing increases of approximately 425% and 380%, respectively, compared with 2021 production.
Ich beobachte noch und schlage zu, falls die Silberpreise nach oben ausbrechen sollten (was gerade durchaus möglich scheint...).
viel Erfolg
SmallCap
https://www.goldseiten.de/artikel/558646--Americas-Gold-and-…
Der Ausblick ist aber schon verlockend...:
Further increases in silver production to a range of 3.4 - 3.8 million ounces and silver equivalent production to 7.0 - 7.4 million ounces are projected for 2024, representing increases of approximately 425% and 380%, respectively, compared with 2021 production.
Ich beobachte noch und schlage zu, falls die Silberpreise nach oben ausbrechen sollten (was gerade durchaus möglich scheint...).
viel Erfolg
SmallCap
jo, könnte eine werden
Antwort auf Beitrag Nr.: 72.671.257 von jacomo1 am 01.11.22 12:53:15Die letzten Monate ging es ja überall stark in den Keller, hier schaut's zumindest mal nach Bodenbildung aus.
Letztendlich sollte Silber wieder die Umkehr finden ...
Wo erkennst du die inverse S-K-S? Mit viel Fantasie ... meinst du dieses?
Letztendlich sollte Silber wieder die Umkehr finden ...
Wo erkennst du die inverse S-K-S? Mit viel Fantasie ... meinst du dieses?
Gut gefällt mir der Chart. Könnte eine grossangelegte Umkehr a la Kopf-Schulter werden
uuh, ist eine Klitsche. Ich bin vor 2 Jahren rein, weil der ehemalige Boss von FrancoNevada an Bord ist. Aber viel zu früh, bin 70 Prozent im Minus. Wenn sie ihre Mine in Nevada an den Start bekämen wäre das wohl ein game changer. Da gibt es technische Probleme.
Gut g
Gut g
21.03.24 · globenewswire · Americas Gold and Silver Corporation |
20.03.24 · globenewswire · Americas Gold and Silver Corporation |