checkAd

    Think big - think ZINC! Trevali Resources Produzent in 6 Monaten (Seite 379)

    eröffnet am 18.02.08 21:57:43 von
    neuester Beitrag 22.08.22 15:42:57 von
    Beiträge: 4.273
    ID: 1.138.653
    Aufrufe heute: 0
    Gesamt: 409.023
    Aktive User: 0

    ISIN: CA89531J1093 · WKN: A1H9CE
    0,1140
     
    EUR
    -3,72 %
    -0,0044 EUR
    Letzter Kurs 30.11.21 Tradegate

    Werte aus der Branche Stahl und Bergbau

    WertpapierKursPerf. %
    1,0200+13,33
    21,000+10,53
    40,81+10,30
    2,8300+10,12
    2.500,00+8,70
    WertpapierKursPerf. %
    27,00-6,90
    1.435,10-7,29
    0,5650-11,77
    264,05-13,14
    8,2501-13,16

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 379
    • 428

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 08.05.08 20:05:11
      Beitrag Nr. 493 ()
      Antwort auf Beitrag Nr.: 34.059.225 von KKCS am 08.05.08 20:03:50
      Jo, heute geht gut was. :)
      Avatar
      schrieb am 08.05.08 20:04:21
      Beitrag Nr. 492 ()
      Antwort auf Beitrag Nr.: 34.058.839 von sparplan_b am 08.05.08 19:18:21Hallo sparplan-b
      Danke für deine Mühe, Homepage hatte ich ja schon und bin über einen Verweis in einer Mail von Phylis Alexander auf die Nummer gekommen, bin da auf der Leitung gestanden, nochmals Dank für den Aufwand.
      Gruß Fritz
      Avatar
      schrieb am 08.05.08 20:03:50
      Beitrag Nr. 491 ()
      1,95 +8.33% 29,2kVol :)
      Avatar
      schrieb am 08.05.08 19:18:21
      Beitrag Nr. 490 ()
      Antwort auf Beitrag Nr.: 34.049.925 von Fritz77 am 07.05.08 20:25:04kann mir jemand sagen was TRC-NR-08-03

      TRC - Trevali Resources Corp.

      NR - news Release

      08 - 2008

      03 - 3. News in dem Jahr

      findet Du hier

      Homepage hier
      Avatar
      schrieb am 08.05.08 18:28:17
      Beitrag Nr. 489 ()
      SILBER - Nanu? Plötzlich ist Kaufdruck zu spüren...
      Datum 08.05.2008 - Uhrzeit 16:00 (© BörseGo AG 2007, Autor: Rain André, Technischer Analyst, © GodmodeTrader - http://www.godmode-trader.de/)
      WKN: 965310 | ISIN: XC0009653103 | Intradaykurs:

      SILBER - ISIN: XC0009653103
      Kursstand: 16,77 $ pro Feinunze

      Kurz-Kommentierung: Der Silberpreis zieht seit über einer Stunde deutlich an und erreicht die Nackenlinie einer bullischen, inversen SSKS als Bodenformation am EMA200 (Tagesbasis). Unten sehen Sie den Stundenchart dargestellt, wo die Formation eingezeichnet ist.

      Geling nun ein nachhaltiger Anstieg über 16,90 $, wäre diese SSKS Bodenformation vollendet. Dann könnte weiterer Kaufdruck aufkommen und Silber bis an den Widerstandsbereich bei 17,33 - 17,47 $ ansteigen.

      Kippt SILBER hingegen wieder signifikant unter 1,60 $ zurück, wären weitere Rücksetzer bis zunächst 16,35 - 16,43 und darunter ggf. 15,96 $ möglich.

      Eine Rohstoffübersicht finden sie hier: http://www.godmode-trader.de/rohstoffe

      Kursverlauf vom 22.04.2008 bis 08.05.2008 (log. Kerzenchartdarstellung / 1 Kerze = 1 Stunde)

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,2170EUR +3,33 %
      Unfassbare Studie – LPT-Therapie bewahrt Patient vor dem Tod!mehr zur Aktie »
      Avatar
      schrieb am 07.05.08 20:25:04
      Beitrag Nr. 488 ()
      Hi
      Ihr seit hier sicher besser informiert, als ich, kann mir jemand sagen was TRC-NR-08-03 ist bzw welche Bewilligungen noch ausstehen und ab wann Trevali den Grey Market Status auf den Pink Sheets hinter sich lassen wird?
      Gruß Fritz
      Avatar
      schrieb am 07.05.08 19:11:08
      Beitrag Nr. 487 ()
      Antwort auf Beitrag Nr.: 34.047.376 von silbernd am 07.05.08 15:39:21
      Danke. Immer schön die mine life verlängern.
      Von mir aus kann's hier (und bei einer Anderen
      noch) gern etwas ruhig(er) werden dank des
      allgemeien Focus auf CDY und WML. Nehmen,
      was andere geben. ;)

      Tasche :)
      Avatar
      schrieb am 07.05.08 16:06:22
      Beitrag Nr. 486 ()
      na da war silbernd schneller :laugh:

      ...The Company is committed to fast-tracking its Santander project to production by late 2008.....

      Q4 also!
      Avatar
      schrieb am 07.05.08 15:40:08
      Beitrag Nr. 485 ()
      Press Release Source: Trevali Resources Corp.


      Trevali Completes Santander Tailings Resource Definition Program
      Wednesday May 7, 9:30 am ET


      Outlining readily exploitable bulk-tonnage zinc resource


      VANCOUVER, BRITISH COLUMBIA--(MARKET WIRE)--May 7, 2008 -- Trevali Resources Corp. ("Trevali" or the "Company") (CNQ: ZINC)(Other OTC:TREVF.PK - News)(Frankfurt:4T1.F - News) is pleased to announce that outstanding borehole assay results from the tailings resource definition program at its Santander Zn-Pb-Ag project, located in the province of Huaral, west-central Peru, indicates the presence of a potentially large bulk-tonnage and low-cost zinc resource. The program has been successfully completed within budget and ahead of schedule.
      ADVERTISEMENT






      These highly positive results will greatly empower the Company to realize its plan of achieving initial cash flow through commercial concentrate production, in conjunction with low capital and operational expenditures, in late 2008 - preceding planned production from high-grade hard rock material.

      Results confirm initial interpretations indicating mineralization is thickest and higher grade in the north-western portion of the tailings impoundment -- thinning gradually towards the south-eastern area (see TRC-NR-08-04) (Table 1 & Figure 1). The average grade of the tailings is 2.09% Zn within which a higher-grade zone in the northwestern quadrant averaged 2.78% Zn (Figure 1).

      The Operations Team (Mining - Metallurgy - Geology) is currently finalizing the mining and process flow sheets but they envisage a very efficient and simple process greatly aided by the fact that the tailings are located only 150 metres from the concentrate plant and are predominantly comprised of dry material. The final flow sheets will be announced in due course.

      Additionally, a representative bulk tonnage sample has been collected and is en route to Resource Development Inc., of Denver, Colorado, for optimization of the metallurgical process. Previous testwork at the Company's on site laboratory utilizing only a 1.95% zinc head-grade produced a 49% zinc concentrate using a simple single stage cleaning and scavenging process (see TRC-NR-08-03 for details).



      Table 1: Summary of Initial Tailings borehole results
      -----------------------------------------------------------
      Interval(i) Coarseness %
      Borehole Number (metres) Zn% (+200#)(ii)
      -----------------------------------------------------------
      SAN-CR-01 2 1.44 78
      -----------------------------------------------------------
      SAN-CR-02 3 3.04 88
      -----------------------------------------------------------
      SAN-CR-03 6 1.75 88
      -----------------------------------------------------------
      SAN-CR-04 5.5 1.86 91
      -----------------------------------------------------------
      SAN-CR-05 6.8 1.9 89
      -----------------------------------------------------------
      SAN-CR-06 2.5 1.66 90
      -----------------------------------------------------------
      SAN-CR-07 2.5 1.51 83
      -----------------------------------------------------------
      SAN-CR-08 4.5 3.37 85
      -----------------------------------------------------------
      SAN-CR-09 14.5 3.04 63
      -----------------------------------------------------------
      SAN-CR-10 22 3.65 77
      -----------------------------------------------------------
      SAN-CR-11 24.5 3.06 69
      -----------------------------------------------------------
      SAN-CR-12 19.4 2.67 71
      -----------------------------------------------------------
      SAN-CR-13 16.5 1.87 62
      -----------------------------------------------------------
      SAN-CR-14 16 1.55 58
      -----------------------------------------------------------
      SAN-CR-15 8.5 1.35 77
      -----------------------------------------------------------
      SAN-CR-16 5 1.2 84
      -----------------------------------------------------------
      SAN-CR-17 12.5 2.52 75
      -----------------------------------------------------------
      SAN-CR-18 32 3.27 84
      -----------------------------------------------------------
      SAN-CR-19 22.8 2.82 65
      -----------------------------------------------------------
      SAN-CR-20 22.5 2.23 72
      -----------------------------------------------------------
      SAN-CR-21 25.4 2.44 69
      -----------------------------------------------------------
      SAN-CR-22 21.3 1.83 62
      -----------------------------------------------------------
      SAN-CR-23 11.5 1.42 77
      -----------------------------------------------------------
      SAN-CR-24 6 1.42 84
      -----------------------------------------------------------
      SAN-CR-25 Abandoned - intersected boulders at edge of dam
      -----------------------------------------------------------
      SAN-CR-26 12.2 2.2 81
      -----------------------------------------------------------
      SAN-CR-27 16 2.58 52
      -----------------------------------------------------------
      SAN-CR-28 15 2.54 75
      -----------------------------------------------------------
      SAN-CR-29 16.5 2.15 75
      -----------------------------------------------------------
      SAN-CR-30 20.5 2.15 71
      -----------------------------------------------------------
      SAN-CR-31 21.5 1.62 60
      -----------------------------------------------------------
      SAN-CR-32 11.5 1.15 58
      -----------------------------------------------------------
      SAN-CR-33 10.5 0.76 56
      -----------------------------------------------------------
      SAN-CR-33A 21.5 3.49 77
      -----------------------------------------------------------
      SAN-CR-34 20.5 3.45 70
      -----------------------------------------------------------
      SAN-CR-35 12.5 2.22 68
      -----------------------------------------------------------
      SAN-CR-36 21 2.32 58
      -----------------------------------------------------------
      SAN-CR-37 23 1.77 59
      -----------------------------------------------------------
      SAN-CR-38 21 1.35 56
      -----------------------------------------------------------
      SAN-CR-39 20.5 1.77 47
      -----------------------------------------------------------
      SAN-CR-40 26.5 2.64 68
      -----------------------------------------------------------
      SAN-CR-41 27.5 3 74
      -----------------------------------------------------------
      SAN-CR-42 32.5 2.31 73
      -----------------------------------------------------------
      SAN-CR-43 23 1.91 51
      -----------------------------------------------------------
      SAN-CR-44 21.5 1.14 59
      -----------------------------------------------------------
      SAN-CR-45 24 1.37 50
      -----------------------------------------------------------
      SAN-CR-46 11.5 0.91 57
      -----------------------------------------------------------
      SAN-CR-47 21 1.94 64
      -----------------------------------------------------------
      SAN-CR-48 18 1.93 72
      -----------------------------------------------------------
      SAN-CR-49 20 1.76 75
      -----------------------------------------------------------
      SAN-CR-50 23.5 1.51 48
      -----------------------------------------------------------
      SAN-CR-51 19.5 1.17 65
      -----------------------------------------------------------
      SAN-CR-52 18 1.37 72
      -----------------------------------------------------------
      SAN-CR-53 20 1.51 63
      -----------------------------------------------------------
      SAN-CR-54 23.5 1.24 80
      -----------------------------------------------------------
      SAN-CR-55 20.15 1.14 57
      -----------------------------------------------------------
      SAN-CR-59 15.5 0.89 32
      -----------------------------------------------------------
      Note: (i) Interval equals total borehole depth from surface
      to end of hole.
      (ii) Sieve tests (coarseness) performed in Company's
      on-site metallurgical laboratory. Rounded to
      nearest %.
      To view Figure 1 accompanying this press release please click on the following link: http://media3.marketwire.com/docs/zinc0507.pdf

      Tailings Background

      The Santander tailings impoundment covers an area of roughly 500 by 500 metres and is located about 150 to 900 metres, at its furthest point, from the concentrate plant. Examination of historic records indicates that significant zinc mineralization reported to the tailings pond throughout its 35-year life of mine.

      Percussion boreholes were drilled on 50-metre centers with results clearly demonstrating that zinc mineralization commences on surface and displays good to excellent intra and inter-hole continuity.

      Golder Associates, of Vancouver, BC, has been retained to complete the resource estimate and mine scoping studies.

      Project Background

      The former Santander Mine produced approximately 8 million tonnes of ore at 6 - 10% zinc, between 1% and 4% lead and 60 g/t silver, plus additional copper credits from a single high grade pipe or chimney. Mining ceased in c. 11% Zn with historic exploration indicating mineralization extends for at least an additional 200 metres depth.

      Site infrastructure includes a large camp and associated support facilities, an ore processing / concentrator plant (including various crushers, mills and cell houses) able to produce zinc, lead-silver and copper concentrates, and the Tingo hydro-electric power-station.

      Future Work

      The Company is committed to fast-tracking its Santander project to production by late 2008 -- reviewing the feasibility of initially commencing production from the potentially large tailings resource followed by high-grade hard-rock production upon receipt of all necessary permits (see TRC-NR-08-03 for details).

      The current resource definition drill program is designed to define mineralization to nominal open-pittable depths, although considerable geotechnical and geological analysis and modeling is required prior to assigning the optimum mining method.

      Qualified Person and Quality Control/Quality Assurance

      EurGeol Dr. Mark D. Cruise, Trevali's President & CEO and a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company, as he is an officer and shareholder.

      The work programs at the Company's property were designed by, and are supervised by, Mark D. Cruise, President, Trevali, and Les Oldham, General Manager, Consultora Minera Anglo Peruana S.A. (independent geological consultants), who together are responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Chemex Laboratories, Lima, for assay. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Blind certified reference material is inserted at regular intervals into the sample sequence by Trevali personnel in order to independently assess analytical accuracy. Finally, representative blind duplicate samples are routinely forwarded to ISO compliant third party laboratories for additional quality control.

      About Trevali Resources Corp.

      The Company is currently exploring and conducting various scoping level studies on the former Santander poly-metallic mine Peru in order to ascertain as best as possible the cost and feasibility of re-commencing mining operations in a timely manner should exploration prove to be successful.

      The common shares of the Company are currently listed on the CNQ (symbol ZINC). For further details on the Company readers are referred to the Company's web site (www.trevaliresources.com), Canadian regulatory filings on SEDAR at www.sedar.com.

      On Behalf of the Board of Directors of TREVALI RESOURCES CORP.

      Mark D. Cruise, President



      The CNQ has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.



      Contact:
      Contacts:
      Trevali Resources Corp.
      Steve Stakiw
      Manager - Corporate Communications
      (604) 408-7488
      (604) 408-7499 (FAX)
      Email: sstakiw@trevaliresources.com
      Website: http://www.trevaliresources.com



      --------------------------------------------------------------------------------
      Source: Trevali Resources Corp.
      Avatar
      schrieb am 07.05.08 15:39:21
      Beitrag Nr. 484 ()
      Trevali drills average of 2.09% Zn at Santander

      Trevali Resources Corp (C:ZINC)
      Shares Issued 28,800,000
      Last Close 5/6/2008 $1.80
      Wednesday May 07 2008 - News Release

      Mr. Mark Cruise reports

      TREVALI COMPLETES SANTANDER TAILINGS RESOURCE DEFINITION PROGRAM

      Trevali Resources Corp.'s outstanding borehole assay results from the tailings resource definition program at its Santander Zn-Pb-Ag project, located in the province of Huaral, west-central Peru, indicates the presence of a potentially large bulk-tonnage and low-cost zinc resource. The program has been successfully completed within budget and ahead of schedule.

      These highly positive results will greatly empower the Company to realize its plan of achieving initial cash flow through commercial concentrate production, in conjunction with low capital and operational expenditures, in late 2008 - preceding planned production from high-grade hard rock material.

      Results confirm initial interpretations indicating mineralization is thickest and higher grade in the north-western portion of the tailings impoundment -- thinning gradually towards the south-eastern area (see TRC-NR-08-04) (Table 1 & Figure 1). The average grade of the tailings is 2.09% Zn within which a higher-grade zone in the northwestern quadrant averaged 2.78% Zn (Figure 1).

      The Operations Team (Mining - Metallurgy - Geology) is currently finalizing the mining and process flow sheets but they envisage a very efficient and simple process greatly aided by the fact that the tailings are located only 150 metres from the concentrate plant and are predominantly comprised of dry material. The final flow sheets will be announced in due course.

      Additionally, a representative bulk tonnage sample has been collected and is en route to Resource Development Inc., of Denver, Colorado, for optimization of the metallurgical process. Previous testwork at the Company's on site laboratory utilizing only a 1.95% zinc head-grade produced a 49% zinc concentrate using a simple single stage cleaning and scavenging process (see TRC-NR-08-03 for details).







      Table 1: Summary of Initial Tailings borehole results

      -----------------------------------------------------------

      Interval(i) Coarseness %

      Borehole Number (metres) Zn% (+200#)(ii)

      -----------------------------------------------------------

      SAN-CR-01 2 1.44 78

      -----------------------------------------------------------

      SAN-CR-02 3 3.04 88

      -----------------------------------------------------------

      SAN-CR-03 6 1.75 88

      -----------------------------------------------------------

      SAN-CR-04 5.5 1.86 91

      -----------------------------------------------------------

      SAN-CR-05 6.8 1.9 89

      -----------------------------------------------------------

      SAN-CR-06 2.5 1.66 90

      -----------------------------------------------------------

      SAN-CR-07 2.5 1.51 83

      -----------------------------------------------------------

      SAN-CR-08 4.5 3.37 85

      -----------------------------------------------------------

      SAN-CR-09 14.5 3.04 63

      -----------------------------------------------------------

      SAN-CR-10 22 3.65 77

      -----------------------------------------------------------

      SAN-CR-11 24.5 3.06 69

      -----------------------------------------------------------

      SAN-CR-12 19.4 2.67 71

      -----------------------------------------------------------

      SAN-CR-13 16.5 1.87 62

      -----------------------------------------------------------

      SAN-CR-14 16 1.55 58

      -----------------------------------------------------------

      SAN-CR-15 8.5 1.35 77

      -----------------------------------------------------------

      SAN-CR-16 5 1.2 84

      -----------------------------------------------------------

      SAN-CR-17 12.5 2.52 75

      -----------------------------------------------------------

      SAN-CR-18 32 3.27 84

      -----------------------------------------------------------

      SAN-CR-19 22.8 2.82 65

      -----------------------------------------------------------

      SAN-CR-20 22.5 2.23 72

      -----------------------------------------------------------

      SAN-CR-21 25.4 2.44 69

      -----------------------------------------------------------

      SAN-CR-22 21.3 1.83 62

      -----------------------------------------------------------

      SAN-CR-23 11.5 1.42 77

      -----------------------------------------------------------

      SAN-CR-24 6 1.42 84

      -----------------------------------------------------------

      SAN-CR-25 Abandoned - intersected boulders at edge of dam

      -----------------------------------------------------------

      SAN-CR-26 12.2 2.2 81

      -----------------------------------------------------------

      SAN-CR-27 16 2.58 52

      -----------------------------------------------------------

      SAN-CR-28 15 2.54 75

      -----------------------------------------------------------

      SAN-CR-29 16.5 2.15 75

      -----------------------------------------------------------

      SAN-CR-30 20.5 2.15 71

      -----------------------------------------------------------

      SAN-CR-31 21.5 1.62 60

      -----------------------------------------------------------

      SAN-CR-32 11.5 1.15 58

      -----------------------------------------------------------

      SAN-CR-33 10.5 0.76 56

      -----------------------------------------------------------

      SAN-CR-33A 21.5 3.49 77

      -----------------------------------------------------------

      SAN-CR-34 20.5 3.45 70

      -----------------------------------------------------------

      SAN-CR-35 12.5 2.22 68

      -----------------------------------------------------------

      SAN-CR-36 21 2.32 58

      -----------------------------------------------------------

      SAN-CR-37 23 1.77 59

      -----------------------------------------------------------

      SAN-CR-38 21 1.35 56

      -----------------------------------------------------------

      SAN-CR-39 20.5 1.77 47

      -----------------------------------------------------------

      SAN-CR-40 26.5 2.64 68

      -----------------------------------------------------------

      SAN-CR-41 27.5 3 74

      -----------------------------------------------------------

      SAN-CR-42 32.5 2.31 73

      -----------------------------------------------------------

      SAN-CR-43 23 1.91 51

      -----------------------------------------------------------

      SAN-CR-44 21.5 1.14 59

      -----------------------------------------------------------

      SAN-CR-45 24 1.37 50

      -----------------------------------------------------------

      SAN-CR-46 11.5 0.91 57

      -----------------------------------------------------------

      SAN-CR-47 21 1.94 64

      -----------------------------------------------------------

      SAN-CR-48 18 1.93 72

      -----------------------------------------------------------

      SAN-CR-49 20 1.76 75

      -----------------------------------------------------------

      SAN-CR-50 23.5 1.51 48

      -----------------------------------------------------------

      SAN-CR-51 19.5 1.17 65

      -----------------------------------------------------------

      SAN-CR-52 18 1.37 72

      -----------------------------------------------------------

      SAN-CR-53 20 1.51 63

      -----------------------------------------------------------

      SAN-CR-54 23.5 1.24 80

      -----------------------------------------------------------

      SAN-CR-55 20.15 1.14 57

      -----------------------------------------------------------

      SAN-CR-59 15.5 0.89 32

      -----------------------------------------------------------

      Note: (i) Interval equals total borehole depth from surface

      to end of hole.

      (ii) Sieve tests (coarseness) performed in Company's

      on-site metallurgical laboratory. Rounded to

      nearest %.





      To view Figure 1 accompanying this press release please click on the following link: http://media3.marketwire.com/docs/zinc0507.pdf

      Tailings Background

      The Santander tailings impoundment covers an area of roughly 500 by 500 metres and is located about 150 to 900 metres, at its furthest point, from the concentrate plant. Examination of historic records indicates that significant zinc mineralization reported to the tailings pond throughout its 35-year life of mine.

      Percussion boreholes were drilled on 50-metre centers with results clearly demonstrating that zinc mineralization commences on surface and displays good to excellent intra and inter-hole continuity.

      Golder Associates, of Vancouver, BC, has been retained to complete the resource estimate and mine scoping studies.

      Project Background

      The former Santander Mine produced approximately 8 million tonnes of ore at 6 - 10% zinc, between 1% and 4% lead and 60 g/t silver, plus additional copper credits from a single high grade pipe or chimney. Mining ceased in c. 11% Zn with historic exploration indicating mineralization extends for at least an additional 200 metres depth.

      Site infrastructure includes a large camp and associated support facilities, an ore processing / concentrator plant (including various crushers, mills and cell houses) able to produce zinc, lead-silver and copper concentrates, and the Tingo hydro-electric power-station.

      Future Work

      The Company is committed to fast-tracking its Santander project to production by late 2008 -- reviewing the feasibility of initially commencing production from the potentially large tailings resource followed by high-grade hard-rock production upon receipt of all necessary permits (see TRC-NR-08-03 for details).

      The current resource definition drill program is designed to define mineralization to nominal open-pittable depths, although considerable geotechnical and geological analysis and modeling is required prior to assigning the optimum mining method.

      Qualified Person and Quality Control/Quality Assurance

      EurGeol Dr. Mark D. Cruise, Trevali's President & CEO and a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company, as he is an officer and shareholder.

      The work programs at the Company's property were designed by, and are supervised by, Mark D. Cruise, President, Trevali, and Les Oldham, General Manager, Consultora Minera Anglo Peruana S.A. (independent geological consultants), who together are responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Chemex Laboratories, Lima, for assay. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Blind certified reference material is inserted at regular intervals into the sample sequence by Trevali personnel in order to independently assess analytical accuracy. Finally, representative blind duplicate samples are routinely forwarded to ISO compliant third party laboratories for additional quality control.

      © 2008 Canjex Publishing Ltd.
      • 1
      • 379
      • 428
       DurchsuchenBeitrag schreiben


      Think big - think ZINC! Trevali Resources Produzent in 6 Monaten