checkAd

    `Avino Silver´(ASM.V) besser als `Mines Management´(MGN)? (Seite 55)

    eröffnet am 22.12.04 21:46:10 von
    neuester Beitrag 18.04.24 11:11:06 von
    Beiträge: 1.461
    ID: 938.312
    Aufrufe heute: 2
    Gesamt: 133.315
    Aktive User: 0

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    0,9500+26,67
    0,7200+12,50
    0,8947+11,85
    0,5700+11,76
    205,00+10,81
    WertpapierKursPerf. %
    1,3400-10,07
    1,2950-11,30
    183,20-19,30
    1,1367-22,67
    12,000-25,00

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 55
    • 147

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 15.08.14 13:36:30
      Beitrag Nr. 921 ()
      Antwort auf Beitrag Nr.: 47.525.662 von Fantomas96 am 15.08.14 12:44:23oh Gott

      nochmals bla bla.

      Es gibt ne uralte Resourcen Rechnung über Avino,
      da stehen schon Grades drin.

      und sicherlich werden erstmal nur 250 tons in Angriff
      genommen bis No 3 fertig ist.
      Hoffentlich haben sie genügend Futter um ordentlich zu minen.

      Gonzalo stagniert ja, sollten die Grades sich nicht bessern.
      Da muß man schon zur Maniküre greifen um das 3. Quartal
      ein ganz klein wenig aufzuhübschen.
      2 Antworten
      Avatar
      schrieb am 15.08.14 12:44:23
      Beitrag Nr. 920 ()
      Antwort auf Beitrag Nr.: 47.522.755 von dosto am 15.08.14 09:05:27Ja, so unterschiedlich kann eine Beurteilung ausfallen, vor allem, wenn man nicht die ganze Nachricht liest, gelle Dosto.

      Erstens ist die von Dir zitierte Passage meiner Ansicht nach überhaupt nicht unwichtig, da jetzt zum ersten Mal seit 2001 mit dem Untertage-Material wieder die Gehalte der Avino Mine bestimmt werden.

      Zweitens, woher kommt Deine Aussage, dass "erstmal nur 250 tons in Angriff genommen werden" ?
      Das ist völliger Quatsch und ich glaube, Du weißt das auch. Die zweite 250tpd Anlage ist ja schon lange im Betrieb und verarbeitet Avino stockpiles (Oberflächenmaterial).

      Die zusätzlich angekündigten 1000tpd in Circuit #3 (und damit insgesamt 1500tpd) sind laut der gestrigen News weiter voll im Plan für Q4, wie ebenfalls bereits schon mehrfach angekündigt:

      Processing Plant Expansion

      Scalping screen has been installed and is now operating
      Product screen is scheduled for installation later this month and preparatory work is now being done to minimize crushing plant downtime
      A large quantity of crushed mill feed has been stockpiled to ensure both mill circuits operate during the scheduled crusher downtime period
      Mill liners for the large ball mill have arrived and are ready to install
      Purchase order for first fill of grinding balls has been issued
      Mill electrical starter to be wired in later this month
      Mill clutch to be installed in September
      Thickener mechanism with bridge has been installed in tank; installation of the rakes and tank launder modification work are currently underway.
      Foundations for the filter press have been poured; the filter has arrived in Manzanillo and is awaiting customs clearance.
      Circuit #3 should be ready for commissioning in the 4th Quarter as scheduled.


      Und die von Dir sehnsüchtig erwarteten Q2 Ergebnisse kommen wie immer zum festgelegten Zeitpunkt:

      Avino Silver & Gold Mines Ltd.: Second Quarter Financial Results to be Released on August 20, 2014

      http://www.juniorminingnetwork.com/junior-miner-news/news-re…


      Wie Du aus dieser Nachricht ein "unwichtiges .... blablabla" machst, bleibt mir verborgen.
      Für mich waren das sehr ermutigende News, dass Avino weiter auf dem vorgezeichneten Pfad ist.
      3 Antworten
      Avatar
      schrieb am 15.08.14 09:05:27
      Beitrag Nr. 919 ()
      Prima,

      aber was solls

      wenn erstmal nur 250 tons in Angriff genommen werden.

      Er soll die 2. Quartals-Ergebnisse liefern.

      Immer wieder dasselbe, zuerst das unwichtige
      vornedraus mit viel blablabla.


      2,960 tonnes of mineralized material on stockpile available for processing in circuit #2; this material represents the first mill feed taken from underground at the Avino Mine since its closure in 2001. Circuit 2, which is currently processing above ground stockpiles


      ist ja der Wahnsinn.

      Wann gehts ab in die geplanten 1.000 tons?




      Und dann das Wichtige.

      Der Mann muß sich da noch ändern.
      4 Antworten
      Avatar
      schrieb am 15.08.14 08:49:09
      Beitrag Nr. 918 ()
      Antwort auf Beitrag Nr.: 47.387.782 von Fantomas96 am 28.07.14 22:39:48Avino Expansion & Operational Update

      http://www.juniorminingnetwork.com/junior-miner-news/news-re…


      VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug. 14, 2014) - Avino Silver & Gold Mines Ltd. (TSX VENTURE:ASM)(NYSE MKT:ASM)(FRANKFURT:GV6); "Avino" or "the Company" is pleased to announce the following expansion update from its Avino mine and operational update from its San Gonzalo Mine, both of which are located on Avino property, 80km northeast of Durango, Mexico.

      Having just returned from a 3 day trip to the mine, I am very impressed with the progress. I'm looking forward to completing our current expansion in short order.

      David Wolfin, President & CEO Avino Silver & Gold Mines Ltd.
      To view recent photos documenting the expansion, please click here.

      Avino Mine Expansion

      Dewatering (100% Complete)

      The Avino Mine is now completely dewatered down to level 12, mining operations will resume with the continuation of the ramp to level 12.5 where mining ceased in 2001 once power and air are available. The new jumbo and scoop are on-site and ready for operation and the new 1mW generator and fuel tank to supply underground power has been installed; testing of the generator will start once service piping and electrical wiring have been completed. The new air compressor is also on site and ready to be hooked up.

      Main Haulage Ramp Rehabilitation (100% Complete)

      The ramp in general is in very good condition as the host rock is solid; areas where sloughing has occurred are being stabilized with steel and timber sets and sprayed with shotcrete. Slashing of the sharp corners has been carried out to accommodate larger haulage vehicles.

      Due to rain and inflow of water with overburden from the open pit, the haulage ramp has been used to haul out this added waste material to the surface. In addition, mineralized material from level 11.5 has also been hauled to the surface. Currently, there is an estimated 2,960 tonnes of mineralized material on stockpile available for processing in circuit #2; this material represents the first mill feed taken from underground at the Avino Mine since its closure in 2001. Circuit 2, which is currently processing above ground stockpiles, will transition to processing higher grade underground material from the Avino mine on a full time basis starting in September. The new flotation concentrate will be used to negotiate with trading firms in anticipation of circuit #3 coming online.

      Initial mining for mill feed will be from levels 11.5 and 12 with start date of late August/early September. Development of the ramp to lower levels (down to level 17) will continue separately with an additional mining crew.

      Processing Plant Expansion

      Scalping screen has been installed and is now operating
      Product screen is scheduled for installation later this month and preparatory work is now being done to minimize crushing plant downtime
      A large quantity of crushed mill feed has been stockpiled to ensure both mill circuits operate during the scheduled crusher downtime period
      Mill liners for the large ball mill have arrived and are ready to install
      Purchase order for first fill of grinding balls has been issued
      Mill electrical starter to be wired in later this month
      Mill clutch to be installed in September
      Thickener mechanism with bridge has been installed in tank; installation of the rakes and tank launder modification work are currently underway.
      Foundations for the filter press have been poured; the filter has arrived in Manzanillo and is awaiting customs clearance.
      Circuit #3 should be ready for commissioning in the 4th Quarter as scheduled.
      Surface and Infrastructure

      There has been a delay with the permit for the construction of the power line due to changes in personnel in the Ministry's office following a recent election. The new schedule calls for completion of the power line sometime in February 2015. Caterpillar has been approached to supply a 1.5 to 2 mW generator for circuit #3 in the interim.

      GeoQuality has completed the new tailings storage facility study and the draft report has been issued for comment. Once complete, the report will be submitted in support of our permit application and the design will be used for the basis of the construction cost estimate to build the new tailings facility.

      San Gonzalo Mine

      At the San Gonzalo mine, exploration drifting on the vein on level 4 to the Southeast has been halted pending the completion of the raise from the 5th level to provide better ventilation. The drift has advanced a total of 121 metres from the cross-cut to the ramp. This is a new zone that was not included in the Tetra Tech resource estimate and was reported in our news release of June 5th 2014. This new zone on level 5 has advanced a distance of 182 metres from the cross-cut where the vein has split. The splay is just as wide as the main vein of 2.5 metres. Drifting and sampling of this new zone on level 6 will commence once the by-pass access ramp to the vein has been completed.

      Development on the vein on level 6 to the Northwest has advanced a total of 113 metres from the main cross cut. Material from this development work and from stope 5-080 are the main sources of mill feed at the present time.

      The main haulage ramp has now advanced past the elevation of level 7 of 2043 metres. Construction of a sump to contain the water inflows is now underway together with the cross cutting.

      To view a cross section map documenting San Gonzalo development, please click here:

      2014 Drill Program

      Further to the news release dated June 5th, 2014, Avino has now completed 1277.75 metres of drilling out of a planned 4,000 metres both above and below surface around the San Gonzalo Mine.

      About Avino

      Founded in 1968, Avino's mission is to create shareholder value through profitable organic growth at the historic Avino property near Durango, Mexico, and the strategic acquisition of mineral exploration and mining properties. We are committed to managing all business activities in an environmentally responsible and cost-effective manner, while contributing to the well-being of the communities in which we operate.

      ON BEHALF OF THE BOARD

      "David Wolfin"

      ________________________________

      David Wolfin
      Avatar
      schrieb am 28.07.14 22:39:48
      Beitrag Nr. 917 ()
      Antwort auf Beitrag Nr.: 47.387.548 von Popeye82 am 28.07.14 22:02:14;) Thanks ;)
      1 Antwort

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1995EUR +1,01 %
      Der geheime Übernahme-Kandidat?!mehr zur Aktie »
      Avatar
      schrieb am 28.07.14 22:02:14
      Beitrag Nr. 916 ()
      2 Antworten
      Avatar
      schrieb am 28.07.14 20:02:49
      Beitrag Nr. 915 ()
      weeenn man solche Vorstellungen nicht hat, dann kann man sich auch mal solche Unternehmen anschauen.
      Aber wie gesagt -ich denke dass das Nadelöhr auf nanoscale geschrumpft ist, und dem trage ich auf die eigene Art Rechnung.
      www.wallstreet-online.de/diskussion/1160748-81-90/cmc-metals…
      www.cmcmetals.ca/i/pdf/CMC_2014_FINAL-FINAL-REVISED-MARCH-15…

      Gruß
      P.
      3 Antworten
      Avatar
      schrieb am 28.07.14 15:10:01
      Beitrag Nr. 914 ()
      Antwort auf Beitrag Nr.: 47.381.660 von Fantomas96 am 27.07.14 20:33:18
      Hi,

      Also auf Basis des Artikels schätze ich schon dass die, wenn einige Dinge gut laufen, Chancen haben kööönnten.
      Als erstes Mal sind da wohl die Bohrer in der Pflicht.


      Hab aber -weeenn ich noch etwas bei Rohstoffunternehmen tue- die eigenen Anforderungen extrem angezogen.
      Wenn man es als ein 'Sieb' sehen würde, gehen wahrscheinlich noch -wesentlich(?)- weniger als 1, 2 von 100 durch.

      Eine der Grundvorstellungen/Bedingungen dabei ist -angenommen es gibt 1.000 Rohstoffförderer im Gesamten. wwworldwide
      Die Rohstoffpreise fallen, mehr und mehr und mehr müssen diePforten schliessen.
      Dann will ich eigentlich sehen -oder denken dass die dazugehören, können- dass die miiindestens eine der Letzten 200 Firmen wäre, die das tun muss.
      Lieber unter den letzten 100, oder besser.
      Also, im Optimalfall, möcht ich da gern förderkostenseitig eine quasi "(fast")Unangreifbarkeit" sehen.
      Und da bleiben dann glaub ich noch paar Dutzend Sandkörner, der Wüste Gobi, übrig.

      Vielleicht beschreibt es das bildlich vernünftig.

      Gruß
      P.
      Avatar
      schrieb am 27.07.14 20:33:18
      Beitrag Nr. 913 ()
      Zitat von Popeye82: [.......]
      bringt, kann da vielleicht einiges gehen-, und vielleicht lohnenswert einen Blick auf Deren weiteren Werdegang zu haben.
      ich werde es nicht tun.
      [.,,,,,,]
      Gruß
      P.


      Warum nicht ?
      1 Antwort
      Avatar
      schrieb am 27.07.14 14:22:41
      Beitrag Nr. 912 ()
      das Interview zu dieser Firma ist auch mal interessant zu lesen -wenn deren Bohrprogramm, weiterhin, Anständiges zu Tage bringt, kann da vielleicht einiges gehen-, und vielleicht lohnenswert einen Blick auf Deren weiteren Werdegang zu haben.
      ich werde es nicht tun.
      www.caesarsreport.com/blog/aftermath-silver-a-qa-with-ceo-do…

      Gruß
      P.
      • 1
      • 55
      • 147
       DurchsuchenBeitrag schreiben


      `Avino Silver´(ASM.V) besser als `Mines Management´(MGN)?