Auriant Mining AB (publ.) publishes Q1 2021 operational update
Highlights:
• In Q1 2021, total hard rock gold production was 209.7 kg (6,743 oz), compared to 278 kg (8,938 oz) in Q1 2020, a decrease of 25%, or 68.3 kg (2,196 oz), but in line with the 2021 production plan;
• Q1 2021 gold sales were 180 kg (5,787 oz), compared to 317 kg (10,193 oz) in Q1 2020, a decrease of 137 kg (4,406 oz), or 43%;
• 96 thousand tonnes of ore was processed with an average grade of 2.04 g/t;
• The CIL plant was operating at the targeted throughput rate of 50 tonnes per working hour (>50 t/hour) and at the higher recovery rate of 92.5%;
• 26 thousand tonnes of ore was mined which coincided with the production volume in the same period of the previous year. Stripping volume in Q1 2021 was 413 thousand m3 (+179 thousand m3, or 76% more than in the Q1 of 2020);
• The average grade in Q1 2021 was 2.42 g/t, compared to 2.10 g/t in Q1 2020, an increase of 15%;
Lesen Sie auch
Production
Production unit | Q1 2021 | Q1 2020 | Change | ||||
Unit | kg | oz | kg | oz | kg | oz | % |
Hard rock | |||||||
Tardan (CIL) | 209.7 | 6,743 | 278 | 8,938 | (68.3) | (2,196) | (25%) |
Alluvial | |||||||
Solcocon | - | - | - | - | - | - | - |
Tardan