5.46MT @ 2.04 g/t Au Measured, 15.39MT @ 1.65 g/t Au Indicated
8.887MT @ 1.98 g/t Au Measured, 13.149MT @1.53 g/t Au Indicated
Notes for table 1. | |
(1) | NB The 2017 PFS study numbers are subject to change as the study progresses. |
(2) | Current exchange rate |
(3) | New ramp inter-slope angles based on the geotechnical study announced May 16 2013 |
(4) | New resource statement released September 27th 2016 by Keith Waterhouse QP prepared in accordance to NI 43-101 compared to the Resource announced in the 2011 PFS by the same QP. |
(5) | Guidance based on other open pit mining operations, mining cost in Brazil and other recent 43-101 PFS and Feasibility studies from Brazil |
(6) | The authorities have requested the tailings facility should be lined as part of the Preliminary License, (LP) this will increase the capital expenditures compared to 2011 |
SRK have indicated that the base case gold price to be used in the updated economic model will remain at US$1,200 per ounce, this will allow easy comparison between the studies, likewise a spread of gold prices will be given in a sensitivity analysis similar to the 2011 PFS. The same mill throughput of 2.5 million tonnes a year will also be used.