checkAd

     105  0 Kommentare Maverick Energy Group, Ltd. Announces Work Commenced on Bonnie Davis #1

    ST. AUGUSTINE, FL / ACCESSWIRE / December 6, 2023 / Maverick has acquired funds as previously announced to recomplete the Bonnie Davis #1 well in Jones County, Texas. The well has been reevaluated by our geologist and a summary of the geological …

    ST. AUGUSTINE, FL / ACCESSWIRE / December 6, 2023 / Maverick has acquired funds as previously announced to recomplete the Bonnie Davis #1 well in Jones County, Texas. The well has been reevaluated by our geologist and a summary of the geological work is included in this report. After certain surface work is completed, Maverick will attempt to recomplete the Penn Lime at 2,960-2,968 and expect results similar to the three offset wells described in this report. Work has commenced on the surface work and the recompletion work will begin when completed.

    Royal Texan Resources drilled Bonnie Davis #1 (42-253-35492) April 22, 2017 to 3185'.

    *The top of the Penn Lime (Canyon) zone at 2960 had excellent oil and gas mud log shows, and the GR-DIL, Density-Neutron and microlog indicated pay. The mud log shows that the maximum drill break is at 2962 and e-logs showed best porosity and Sw at 2966-70.

    *A second zone occurs at 2974-82, and whereas it has a drilling break, good SP, and excellent porosity (19%) from the density log, the drop off in resistivity suggests a mixed oil and gas reservoir. It has no mud log show. If a completion is in contact with this zone it may produce water.

    *A third Zone at 2990-3000 is very porous (22%), excellent SP (relative permeability), but resistivity is less than 1 ohm-meter, and if a completion is in contact with this zone, it will produce water. It also has no mud log show.

    Three other Penn Lime producers shown on the map below had impressive initial production rates of 55, 115 and 137 Bopd…none of the 3 wells initially produced water. Bonnie Davis #1 was perforated 2960-68 and was acidized (unknown volume, but likely 250 gal 15% HCl as in the other 3 wells). The next day, the operator immediately set CIBP at 2400'. It is assumed the zone was abandoned because it produced water, the speculation that the acid broke through to one or both of the high porosity, low resistivity zones beneath the top of the Penn Lime. Comments by the Trenergy engineer have been made that the bond logs over different zones "are not good".

    When or if the decision to recomplete this zone after drilling out the plug at 2883, the top zone from 2960-2970 must be cement-squeezed before the zone is reperforated and acidized.

    Royal Texan Res, Davis #1, 42-253-35492

    Mud log shows were encountered an e-logs indicated pay in the Breckinridge at 2200-2206, 2207-2211, and 2218-2222. Royal Texan may not have tested this zone.

    Seite 1 von 2



    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Maverick Energy Group, Ltd. Announces Work Commenced on Bonnie Davis #1 ST. AUGUSTINE, FL / ACCESSWIRE / December 6, 2023 / Maverick has acquired funds as previously announced to recomplete the Bonnie Davis #1 well in Jones County, Texas. The well has been reevaluated by our geologist and a summary of the geological …