DGAP-News
XIMEN Provides Summary Compilation of Its Comprehensive 2014 Exploration Program at Its Brett Gold Property
DGAP-News: Ximen Mining Corp. / Key word(s): Miscellaneous
XIMEN Provides Summary Compilation of Its Comprehensive 2014
Exploration Program at Its Brett Gold Property
07.04.2015 / 15:01
---------------------------------------------------------------------
Vancouver, British Columbia--(Newsfile Corp. - April 7, 2015) - Ximen
Mining Corp. (TSXV: XIM) (the 'Company' or 'Ximen') is pleased to provide a
summary compilation of its comprehensive exploration program conducted in
2014 at its Brett gold property in south central British Columbia. The
technical information contained in this press release has been previously
disclosed, but the Company felt that both interested investors and others
watching the company should know all that was done on their behalf since
the Brett property was acquired in late 2013. The following highlights the
most important events in Brett's history of discovery.
Historical Context The Brett gold property was discovered in 1983 when
prospectors located visible gold in a quartz vein. Through a series of
exploration programs by various companies, a total of 15,600 metres of
diamond drilling in 131 holes, almost 3,000 metres in 53 reverse
circulation holes, 459 m of underground development, surface trenching and
road building were completed on the property. Additionally, geochemical
surveys consisting of 4,659 soil samples over 15 square kilometers were
completed, many of which returned anomalous results. The majority of this
work was concentrated in a small portion of the property, along what is
known as the Main shear zoneRW vein.
Exploration was stopped in late 1996 and the property was tied up in
litigation for several years. No work has been conducted on the property in
the 10 years prior to Ximen acquiring the exploration rights.
Significant gold intercepts from the earlier diamond drilling effort
include the following results, reported in a 2004 NI 43-101 compliant
technical report by a previous operator:
+-----------+---------+------------------------+--------------------------+
|Hole 04-02 |10.1 m |11.7 g/t Au |0.34 opt Au |
+-----------+---------+------------------------+--------------------------+
|Including |3.1 m |34.0 g/t Au |0.99 opt Au |
+-----------+---------+------------------------+--------------------------+
|Hole 04-12 |1.3 m |168.3 g/t Au |4.91 opt Au |
Vancouver, British Columbia--(Newsfile Corp. - April 7, 2015) - Ximen
Mining Corp. (TSXV: XIM) (the 'Company' or 'Ximen') is pleased to provide a
summary compilation of its comprehensive exploration program conducted in
2014 at its Brett gold property in south central British Columbia. The
technical information contained in this press release has been previously
disclosed, but the Company felt that both interested investors and others
watching the company should know all that was done on their behalf since
the Brett property was acquired in late 2013. The following highlights the
most important events in Brett's history of discovery.
Historical Context The Brett gold property was discovered in 1983 when
prospectors located visible gold in a quartz vein. Through a series of
exploration programs by various companies, a total of 15,600 metres of
diamond drilling in 131 holes, almost 3,000 metres in 53 reverse
circulation holes, 459 m of underground development, surface trenching and
road building were completed on the property. Additionally, geochemical
surveys consisting of 4,659 soil samples over 15 square kilometers were
completed, many of which returned anomalous results. The majority of this
work was concentrated in a small portion of the property, along what is
known as the Main shear zoneRW vein.
Exploration was stopped in late 1996 and the property was tied up in
litigation for several years. No work has been conducted on the property in
the 10 years prior to Ximen acquiring the exploration rights.
Significant gold intercepts from the earlier diamond drilling effort
include the following results, reported in a 2004 NI 43-101 compliant
technical report by a previous operator:
+-----------+---------+------------------------+--------------------------+
|Hole 04-02 |10.1 m |11.7 g/t Au |0.34 opt Au |
+-----------+---------+------------------------+--------------------------+
|Including |3.1 m |34.0 g/t Au |0.99 opt Au |
+-----------+---------+------------------------+--------------------------+
|Hole 04-12 |1.3 m |168.3 g/t Au |4.91 opt Au |
Diskutieren Sie über die enthaltenen Werte
Aktuelle Themen
Weitere Artikel des Autors
1 im Artikel enthaltener WertIm Artikel enthaltene Werte