Figure 2: Underground development of new ramp-portal to surface at Caribou Mine: http://media3.marketwire.com/docs/984755Pic2.jpg.
SURFACE WORKS
- Zinc and lead concentrate shed rehabilitation is in progress and will improve winter concentrate load-outs and management. Copper concentrate shed planning and engineering is advancing
well.
- Several site bridges have been replaced in order to improve access to the Tailings Management Facility (TMF). The Reclaim Pumping Station and water polishing pond areas have be raised and
placed on new foundations to facilitate potential future TMF expansions.
- Geotechnical drilling has been completed in order to access long-term tailings management planning.
- The Mill site has been contoured to improve surface water management.
- Fire suppression system is refurbished and fully operational.
GEOLOGY
- Exploration targeting and drill testing of potential extensions of both the East and North Mine Limbs has resulted in the intersection of significant intervals of massive sulphide mineralization ranging from 7 metres to plus-45 metres downhole thicknesses and remain open for extension. Assay results are pending and will be released upon receipt.