checkAd

     708  0 Kommentare Lion One Announces MOU for EPC Contract and Vendor Financing with Ansteel-CapitalAsia for Construction of the Tuvatu Gold Project - Seite 2

    The Tuvatu Gold Project is located 17 km from the Nadi International Airport on the main island of Viti Levu in Fiji. Discovered in 1987, Tuvatu was advanced by previous owners through underground exploration and development from 1997 through to the completion of a feasibility study in 2000. Acquired by Lion One in 2011, the project has over 100,000 meters of drilling completed to date in addition to 1,600 meters of underground development. Tuvatu is a high grade, low sulphidation, epithermal gold deposit hosted inside a South Pacific-style volcanic caldera, along the Viti Levu lineament, Fiji's own corridor of high grade gold deposits. In January 2016 the Hon. Prime Minister of Fiji, Mr. V. Bainimarama, formally presented the previously granted Tuvatu Mining Lease to Lion One, concluding the permitting process for the development of an underground gold mine and processing plant at Tuvatu, demonstrating strong government support for Fiji's 85 year-old gold mining industry.

    The Company envisages a low cost underground gold mining operation producing 352,931 ounces of gold at head grades of 11.30 g/t Au over an initial 7 year mine life, including 262,000 ounces at 15.30 g/t through year three, at cash costs of US$567 per ounce with all-in sustaining costs of US$779 per ounce. Total capex of US$48.6 million includes a contingency of US$6.1 million with an 18 month preproduction schedule and 18 month payback on capital. At a US$1,200 gold price the project generates net cash flow of US$112.66 million and an IRR of 52% (after tax). Tuvatu is situated upon a 5 hectare footprint inside a larger 384 hectare mining lease that contains numerous high grade prospects proximal to Tuvatu, at depth, and up to 1.2 km along strike from the resource area, giving the project near-term production potential and further discovery upside inside of one of Fiji's underexplored volcanic goldfields.

    Lesen Sie auch

    The information in this report that relates to the Exploration Results or Mineral Resources is based upon, and fairly represents, information and supporting documentation compiled by Mr. Stephen Mann, who is an officer and director of the Company and is a member of The Australasian Institute of Mining and Metallurgy. Mr. Mann has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and the activity in which he is undertaking to qualify as a Competent Person under 2012 Edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr. Mann consents to the inclusion in this news release of the matters based on his information in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information included in previous news releases referred to above, and confirms that the form and context in which the findings are presented have not been materially modified from the original news releases. Albert Siega, P. Eng., a full time employee of the Company and Qualified Person as defined by NI 43-101 has reviewed and approved the technical content of this release.

    Seite 2 von 4



    Diskutieren Sie über die enthaltenen Werte




    Verfasst von Marketwired
    Lion One Announces MOU for EPC Contract and Vendor Financing with Ansteel-CapitalAsia for Construction of the Tuvatu Gold Project - Seite 2 VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug. 24, 2016) - Lion One Metals Limited (TSX VENTURE:LIO)(ASX:LLO)(OTCQX:LOMLF)(FRANKFURT:LY1) (the "Company") is pleased to announce the signing of a non-binding Memorandum of Understanding (MOU) for an …