checkAd

     126  0 Kommentare Azincourt Energy 2021 Winter Drill Program Preparations Underway at the East Preston Uranium Project - Seite 2

    Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan
    https://www.globenewswire.com/NewsRoom/AttachmentNg/ffe79c42-8d76-4e16 ... 

    Figure 2: 2020 HLEM survey Interpretation at the East Preston Uranium Project
    https://www.globenewswire.com/NewsRoom/AttachmentNg/0355375b-cb82-4c00 ... 

    Figure 3: Project Location – Western Athabasca Basin, Saskatchewan, Canada
    https://www.globenewswire.com/NewsRoom/AttachmentNg/d2757afa-1df9-4106 ...

    About East Preston

    Azincourt is currently earning towards 70% interest in the 25,000+ hectare East Preston project as part of a joint venture agreement with Skyharbour Resources (TSX.V: SYH), and Dixie Gold Inc (Figure 2: Project Location – Western Athabasca Basin, Saskatchewan, Canada). Three prospective conductive, low magnetic signature corridors have been discovered on the property. The three distinct corridors have a total strike length of over 25 km, each with multiple EM conductor trends identified.   Ground prospecting and sampling work completed to date has identified outcrop, soil, biogeochemical and radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

    The East Preston Project has multiple long linear conductors with flexural changes in orientation and offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement-hosted unconformity uranium deposits. These are not just simple basement conductors; they are clearly upgraded/enhanced prospectivity targets because of the structural complexity.

    The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone cover – therefore they are relatively shallow targets but can have great depth extent when discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

    Lesen Sie auch

    Qualified Person

    The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by C. Trevor Perkins, P.Geo., Exploration Manager of Azincourt Energy, and a Qualified Person as defined by National Instrument 43-101.

    Seite 2 von 3


    Diskutieren Sie über die enthaltenen Werte


    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Azincourt Energy 2021 Winter Drill Program Preparations Underway at the East Preston Uranium Project - Seite 2 VANCOUVER, British Columbia, Jan. 21, 2021 (GLOBE NEWSWIRE) - AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTC: AZURF), is pleased to provide an update on preparations for the 2021 winter exploration program at the East …

    Schreibe Deinen Kommentar

    Disclaimer