    While the conditions of Test 1 resulted in the best product quality (higher lithium concentration and lower impurities), Test 2 was able to achieve the highest flow rate ratio and optimized cycle duration. While the product quality of Test 2 was lower, it is still significantly greater than the KPI success criteria and a preferable trade-off from a commercial design perspective, outlined below. The average main impurities in the Test 2 product stream include: Na: 76.5 mg/L, K: 11.2 mg/L, Ca: 59.2 mg/L, Mg: 10.1 mg/L, Mn:0.2 mg/L mg/L, Sr: 1.5 mg/L and B 68.8mg/L.

    Given the results of the three tests, E3 Lithium is running the conditions for Test 2 for an extended operating period that is currently underway. E3 Lithium will continue to monitor and verify the results of the extended operating period.

    Results Discussion

    The details below provide context on the results and how they impact the overall design of E3 Lithium’s commercial facility. Being able to extract lithium from the Leduc brines in Alberta efficiently and effectively at this scale has a significant positive impact on the project and advances the Company forward.

    Lithium Recovery: The mass of lithium recovered from raw brine was calculated based on the lithium concentration measured in the brine before and after the lithium was extracted using the DLE system. The average lithium recovery over the duration of each test is reported above.

    Concentration of lithium relative to other impurities: The average lithium grade is reported as the concentration of lithium relative to the total concentration of the impurities. Samples were pulled every four hours throughout the duration of each test.

    Concentration of lithium in the lithium product stream: The concentration of lithium in the product stream is reported as an average. Samples were pulled every four hours throughout the duration of each test.

    Lesen Sie auch

    Flow Rate Ratio: The flow rate ratio is calculated from the brine flow rate relative to the volume of sorbent used. A higher number represents more brine flowing across the same amount of sorbent.

    The main KPI that is impacted by increasing the flow rate ratio is lithium recovery. The goal of the initial three tests was to maximize the flow rate ratio while maintaining lithium recovery and the purity of the product stream. Various parameters in each of the three tests were modified to increase the flow rate ratio while aiming to ensure recovery was maintained, along with achieving high levels of purity and high lithium concentration.

    Seite 2 von 4


    Diskutieren Sie über die enthaltenen Werte


    Business Wire (engl.)
    0 Follower
    Autor folgen

    E3 Lithium Completes Initial Field Pilot Plant Tests and Shares Results Against KPIs   - Seite 2 E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3 Lithium” or the “Company,” Alberta’s leading lithium developer and extraction technology innovator, is pleased to report it has completed the series of three optimized tests at its Direct …