checkAd

     912  0 Kommentare Globex Options Ramp Gold Property to RJK Exploration - Seite 2


    14,328 cut 31,187 5,611 70,568 17,040 127,917 @ .373
    .289 cut #2 Vein - - - - - - 42,945 12,273 42,945 @ .286 Shaft Vein 5,141 1,542 6,883 1,203 3,241 447 15,309 3,194 30,574 @ .209 Total 96,166 21,033 94,419 35,243 81,399 15,087 238,132 55,219 510,116 @ .248
    126,582 Oz Au

    Deep Resource

    Per the same report, Bennett reports that below 220 m elevation a resource estimate was previously calculated from deep surface drill intercepts plotted on cross and longitudinals sections of 283,358 tons grading 0.22 oz Au/ton (62,906 oz) (historical, non NI-43-101 compliant).

    The resources described above are historic. A qualified person has not done sufficient work for Globex to classify the historical estimates as current mineral resource and Globex is not treating the historical estimates as current mineral resources under National Instrument 43-101 and CIM Standards for Mineral Resources and Reserves. These historical resources should not be relied upon.

    The large Ramp Gold Property provides ample space for additional modern exploration both in the area of the known historical resource and elsewhere on the claims.

    The surface expression of the Ramp deposit has been stripped within an open pit and the mineralized zones have been previously accessed at depth by an exploration ramp on five levels. Both features are currently flooded. The property is accessible by an all season gravel road.

    Seite 2 von 3



    Diskutieren Sie über die enthaltenen Werte




    Verfasst von Marketwired
    Globex Options Ramp Gold Property to RJK Exploration - Seite 2 ROUYN-NORANDA, QUEBEC--(Marketwired - May 31, 2016) - GLOBEX MINING ENTERPRISES INC. (TSX:GMX)(FRANKFURT:G1M)(STUTTGART:G1M)(BERLIN:G1M)(MUNICH:G1M)(XETRA:G1M)(OTCQX:GLBXF) wishes to inform shareholders that it has reached a tentative agreement to …

    Schreibe Deinen Kommentar

    Disclaimer