checkAd

     131  0 Kommentare I-5 Electric Truck Charging Sites Mapped Out by Electric Utilities

    Electric utilities in three West Coast states have announced the results of a study that could lead to significant reductions of pollution from freight transportation up and down the Pacific Coast and create jobs in an economy hit hard by the novel coronavirus.

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20200617005125/en/

    (Graphic: Business Wire)

    (Graphic: Business Wire)

    The West Coast Clean Transit Corridor Initiative, a study commissioned by an unprecedented collaboration among nine electric utilities and two agencies representing more than two dozen municipal utilities, recommends adding electric vehicle charging for freight haulers and delivery trucks at 50-mile intervals along Interstate 5 and adjoining highways.

    “The results of this study provide a roadmap for electric utilities in Washington, Oregon and California to help electrify transportation in a coordinated fashion,” said Katie Sloan, director of eMobility and Building Electrification for Southern California Edison, one of the study’s sponsors. “This study comes at a time when we believe major investment in electric vehicle charging infrastructure will help significantly with economic recovery from COVID-19 in our states.”

    Other sponsors of the study are Los Angeles Department of Water & Power, Northern California Power Agency, Pacific Gas and Electric Company, Pacific Power, Portland General Electric, Puget Sound Energy, Sacramento Municipal Utility District, San Diego Gas & Electric, Seattle City Light and Southern California Public Power Authority. HDR completed the study.

    The study’s final report, published today, proposes a phased approach for electrifying the I-5 corridor. The first phase would involve installing 27 charging sites along I-5 at 50-mile intervals for medium-duty electric vehicles, such as delivery vans, by 2025. Then, later, 14 of the 27 charging sites would be expanded to also accommodate charging for electric big rigs by 2030, when it is estimated that 8% of all trucks on the road in California could be electric.

    Of the 27 proposed sites, 16 are in California, five are in Oregon and six are in Washington. An additional 41 sites on other highways that connect to I-5 are being proposed for electrification. Those highways include Interstates 8, 10, 80, 210 and 710 and state routes 60 and 99 in California; I-84 in Oregon and I-90 in Washington.

    Seite 1 von 3



    Business Wire (engl.)
    0 Follower
    Autor folgen

    I-5 Electric Truck Charging Sites Mapped Out by Electric Utilities Electric utilities in three West Coast states have announced the results of a study that could lead to significant reductions of pollution from freight transportation up and down the Pacific Coast and create jobs in an economy hit hard by the novel …