checkAd

     168  0 Kommentare Candente Gold Secures Cornerstone for New Growth Strategy - Seite 4

    The following longitudinal section by Prospero shows the drilling pattern along the El Dorado veinin the area of the Hundido and El Dorado mines, along with summary drill hole intersection grades and widths used in the historical resource estimation. (Prospero News Release dated June 22, 2011)
     (https://pr.globenewswire.com/FileDownloader/DownloadFile?source=ml& ...)

    Significant data compilation, re-drilling, re-sampling and data verification may be required by a Qualified Person for the Company before the intersection widths and grades can be verified to be compliant with current NI 43-101 standards. The Company’s QP has not done sufficient work to verify the above-mentioned intersections.

    In addition to the data described above, exploration potential outside of the area of historical mining and Prospero’s drilling is believed to be excellent based on the 3.5 km strike length of the vein structures as indicated by vein outcroppings, argillic alteration and silicification. Along this trend, potential exists for both high-grade veins and lower-grade bulk tonnage stockwork zones that have been observed to extend over tens of meters in width in both the hanging wall and footwall of the El Dorado vein system (“Magellan Gold Corporation, Form 10-K Annual Report US SEC dated Dec 31, 2018, File No. 333-174287”)
    (https://pr.globenewswire.com/FileDownloader/DownloadFile?source=ml& ...).  Both the northeasterly striking as well as east-west striking splits of the main structure exhibit structural complexity and potential for multi-meter wide precious metal mineralization. Anomalous base metal assays (100's to 1000's of parts per million lead, zinc and copper) are ubiquitous as evidenced by the common occurrence of visible galena, sphalerite and chalcopyrite in outcrop and dumps.

    El Dorado lies 50 km south of the SDA Plant, 70 km north-northwest of Tepic, the state capital, and 180 km southeast of Mazatlan, Sinaloa. The project has excellent road and rail infrastructure.

    Terms of the Agreement

    Candente Gold has the Option to earn up to a 100% interest in the Plant and assume the Lease Agreement to the El Dorado Property by making staged payments in shares totalling a value of US$1.425 million over 30 months as well as $5,000 on signing the MOU and 5,000,000 shares on signing the Definitive Agreement and obtaining TSXV approval. Share values are to be calculated using a 30 day VWAP. The Company also has the option to earn a partial interest in the plant and pay Magellan Acquisitions a fee for usage based on percentage owned. (See News Release No. 077 dated April 28th, 2020 for more details)

    Seite 4 von 6



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Candente Gold Secures Cornerstone for New Growth Strategy - Seite 4 VANCOUVER, British Columbia, Sept. 28, 2020 (GLOBE NEWSWIRE) - Candente Gold Corp. (TSXV:CDG) ("Candente Gold” and/or the “Company”) is pleased to advise that the Company has signed the Definitive Agreement (in keeping with the Memorandum of …