    Qualified Person

    The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Gernot Wober, P.Geo. VP Exploration Canada for Osisko Mining Inc, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

    About the Garrison Project

    The Garrison Project area is comprised of 214 mineral claims, 25 mining leases, and 87 patent claims encompassing approximately 8,000 hectares. Both Garrcon and Jonpol have resource estimates that are described in a technical report prepared in accordance with NI 43-101, which was completed by a previous operator Northern Gold Mining Inc. (entitled "Technical Report on the Golden Bear Project - Garrison Property: Larder Lake Mining Division, Garrison Township, Ontario, Canada") dated December 30, 2013, with an effective date of December 30, 2013 (the "Garrison Technical Report"). The Garrison Technical Report was prepared by A.C.A. Howe International Limited for Northern Gold Mining Inc. (a wholly-owned subsidiary of Osisko) and is available on Osisko's website at www.osiskomining.com and on SEDAR under Northern Gold Mining Inc.'s issuer profile at www.sedar.com.

    Resource estimates were conducted by A.C.A. Howe International Limited according to CIM standards. The Garrcon Zone estimates showed 15.1 million tonnes with an average grade of 1.07 g/t Au (521,000 oz) in measured resources; 14.1 million tonnes averaging 1.16 g/t Au (526,000 oz) in indicated resources; and 1.7 million tonnes averaging 0.72 g/t Au (39,000 oz) in inferred resources. Potential underground resources of 5.1 million tonnes averaging 3.49 g/t Au (577,000 oz) in the inferred category were also outlined. Resources were reported at a cut-off grade of 0.4 g/t Au for open pit extraction and 1.5 g/t in a bulk underground mining scenario using a gold price of US$1,250/oz.

    At the Jonpol Zone, resources were estimated as 0.87 million tonnes averaging 5.34 g/t Au (150,000 oz) in the indicated category; and 1.07 million tonnes averaging 5.56 g/t Au (192,000 oz) in inferred resources. Resources were reported at a cut-off grade of 3.0 g/t Au and assume an underground extraction scenario using a gold price of US$1,250/oz.

    Readers are cautioned that inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

    Seite 2 von 5


    Diskutieren Sie über die enthaltenen Werte



    Verfasst von Marketwired
    Osisko Mining Provides Ontario Exploration Update - Seite 2 TORONTO, ONTARIO--(Marketwired - Feb. 13, 2018) - Osisko Mining Inc. (TSX:OSK) ("Osisko" or the "Corporation") is pleased to provide an update on the progress of exploration at its 100% owned Garrison gold project located in Garrison Township, …