checkAd

     277  0 Kommentare STLLR Gold Announces Windjammer South Infill Drilling Results at the Tower Gold Project and Appointment of VP Projects & Technical Services

    STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) (“STLLR” or the “Company”) announces the remaining assay results from the infill and confirmatory drilling program at the Windjammer South Deposit at the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario, Canada. STLLR appoints James Gagne, P.Eng., MBA, as the Vice President, Projects & Technical Services.

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240404998068/en/

    Figure 1: Tower Gold Project - General Location Map (Graphic: Business Wire)

    Figure 1: Tower Gold Project - General Location Map (Graphic: Business Wire)

    Table 1: Windjammer South Drilling Highlights (See Figures 2 and 3 for the drill location map and section views):

    Hole ID

    Deposit

    Result

    MGH23-468

    Windjammer South

    1.63 g/t Au over 102.00 m (incl. 5.38 g/t Au over 14.00 m)

    MGH23-460

    Windjammer South

    0.93 g/t Au over 74.65 m (incl. 1.40 g/t Au over 30.00 m)

    MGH23-478

    Windjammer South

    0.69 g/t Au over 115.00 m (incl. 2.62 g/t Au over 8.00 m) &

    4.72 g/t Au over 16.00 m (incl. 21.10 g/t Au over 3.00 m)

    MGH23-507

    Windjammer South

    8.04 g/t Au over 10.90 m &

    2.34 g/t Au over 50.65 m (incl. 8.48 g/t Au over 5.00 m & incl.

    12.10 g/t Au over 3.65 m)

    MGH23-484

    Windjammer South

    0.57 g/t Au over 74.95 m (incl. 1.10 g/t Au over 13.91 m)

    g/t Au”: grams per tonne gold; “m”: metres

    Tower Gold Project Update:

    • 129,737 m, in 477 drill holes, of the 140,000 m infill drill program completed have been released.

    Keyvan Salehi, P.Eng., MBA, President, CEO, and Director of STLLR stated: “Windjammer South Deposit infill drilling results continue to confirm the continuity of mineralization of the Tower MRE block model. Drill hole MGH23-484 appears to have intersected mineralization that was previously modelled as waste, suggesting a potential addition to the known mineralization in that area. Overall, the drilling information gives us additional confidence in the Tower MRE block model in the areas drilled.”

    “We are pleased to announce the appointment of James Gagne, P.Eng., MBA as Vice President, Projects & Technical Services. James brings significant technical and operational experience from the Timmins and Kirkland Lake mining camps. I’ve known James for the entirety of his mining career; We worked together at Lake Shore Gold and we were involved with the construction and operation of the Bell Creek and Timmins West Mines. James will play an instrumental role as we advance our cornerstone Tower Gold and Colomac Gold Projects.”

    Windjammer South Deposit Drilling

    The Windjammer South Deposit is located on the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario (See Figure 1 for the Tower Gold Project - General Location Map). Mineralization at Windjammer South is associated with extensional and stockwork-type quartz veining within Timiskaming age meta-sediments, located between 2 major splays of the prolific Destor-Porcupine Fault Zone. The 2023 drill program at Windjammer South was focused on confirming and infilling (50 m drill-centre spacings) the Tower Gold Project Mineral Resource Estimate1 (“Tower MRE”).

    The results from this batch of drilling (please also refer to the Company’s October 19, 2023 news release for the previous batch of drilling at Windjammer South) appear to confirm the continuity of the Windjammer South mineralization as estimated by the Tower MRE block model. This is evident particularly with holes MGH23-468, MGH23-478 and MGH23-507 (See Figures 2 & 3). In addition:

    • Drill hole MGH23-484 (See Figures 2 & 3): Intersected significant mineralization in an area previously modelled as waste.
    • Drill holes MGH23-483, MGH23-489, MGH23-490, MGH23-493, and MGH23-494: Geomechanical and Geometallurgical drilling that will benefit future mine designs.

    Overall, the drilling at Windjammer South confirmed the Tower MRE block model. The increased drill density provides the potential to upgrade the areas drilled to a higher resource category and further define future geological models.

    Appointment of VP Projects & Technical Services

    The Company has appointed Mr. Gagne to the role of Vice President, Projects & Technical Services. James brings 15 years of progressive experience in mine operations, engineering, and consulting. Previously, Mr. Gagne was with Kirkland Lake Gold as the Mine Superintendent of the Macassa Mine and was then promoted to the role of Manager of Mining. As the Manager, James was responsible for the totality of site operations comprised of 3 shafts, a paste plant, and a processing facility. He was also involved with the execution of various major projects such as the new #4 Shaft, the commencement of the Near Surface Portal deposit, and the new overall mine ventilation upgrade within the complex. At Lake Share Gold (subsequently acquired by Tahoe Resources then Pan American Silver), James was involved with the construction, ramp-up and operation of the Bell Creek and Timmins West Mines in the Timmins Mining Camp. He held various roles in engineering and operations, ultimately becoming the Senior Production Engineer. Prior to joining STLLR, James was the General Manager at Black Rock Engineering within the IONIC Technology Group, a firm that specialized in providing engineering services to mining and heavy industries across North America. Mr. Gagne received his Bachelor of Engineering at Laurentian University, his MBA at the Lazaridis School of Business & Economics at Wilfrid Laurier University and is a Professional Engineer in Ontario.

    Table 2: Tower Gold – Windjammer South Deposit: Drill Intercepts

    Zone

    Hole Number

    From

    (m)

    To

    (m)

    Interval

    (m)

    Grade

    (g/t Au)

    Metal Factor

    (g/t Au x m)

    Windjammer South

    MGH23-444

    63.00

    75.00

    12.00

    0.63

    7.56

    Windjammer South

    MGH23-449

    154.00

    159.47

    5.47

    0.37

    2.02

    Windjammer South

    and

    178.00

    179.33

    1.33

    0.96

    1.28

    Windjammer South

    and

    189.00

    195.00

    6.00

    0.31

    1.86

    Windjammer South

    and

    217.00

    229.40

    12.40

    0.98

    12.15

    Windjammer South

    and

    254.77

    298.00

    43.23

    0.68

    29.40

    Windjammer South

    MGH23-460

    86.20

    91.50

    5.30

    0.40

    2.12

    Windjammer South

    and

    103.50

    178.15

    74.65

    0.93

    69.42

    Windjammer South

    including

    139.00

    169.00

    30.00

    1.40

    42.00

    Windjammer South

    MGH23-460

    209.00

    212.50

    3.50

    0.88

    3.08

    Windjammer South

    MGH23-465

    63.00

    104.00

    41.00

    0.75

    30.75

    Windjammer South

    and

    118.15

    132.00

    13.85

    0.64

    8.86

    Windjammer South

    MGH23-467

    81.20

    138.00

    56.80

    0.57

    32.38

    Windjammer South

    MGH23-468

    49.00

    59.00

    10.00

    0.62

    6.20

    Windjammer South

    and

    72.00

    81.00

    9.00

    0.36

    3.24

    Windjammer South

    and

    154.00

    221.00

    67.00

    0.65

    43.55

    Windjammer South

    including

    184.00

    197.00

    13.00

    1.38

    17.94

    Windjammer South

    and

    233.40

    237.00

    3.60

    0.80

    2.88

    Windjammer South

    and

    246.00

    348.00

    102.00

    1.63

    166.26

    Windjammer South

    including

    324.00

    338.00

    14.00

    5.38

    75.32

    Windjammer South

    MGH23-471

    107.26

    125.45

    18.19

    0.65

    11.82

    Windjammer South

    and

    144.00

    151.20

    7.20

    0.41

    2.95

    Windjammer South

    and

    190.70

    210.20

    19.50

    1.64

    31.98

    Windjammer South

    including

    205.10

    207.50

    2.40

    5.56

    13.34

    Windjammer South

    MGH23-474

    44.00

    63.50

    19.50

    0.95

    18.53

    Windjammer South

    and

    197.80

    323.00

    125.20

    0.61

    76.37

    Windjammer South

    including

    293.00

    315.30

    22.30

    1.06

    23.64

    Windjammer South

    MGH23-477

    97.00

    101.10

    4.10

    2.57

    10.54

    Windjammer South

    and

    162.00

    177.00

    15.00

    0.71

    10.65

    Windjammer South

    and

    197.00

    201.00

    4.00

    0.67

    2.68

    Windjammer South

    MGH23-478

    53.00

    126.00

    73.00

    0.47

    34.31

    Windjammer South

    and

    158.00

    160.00

    2.00

    3.08

    6.16

    Windjammer South

    and

    186.00

    301.00

    115.00

    0.69

    79.35

    Windjammer South

    including

    276.00

    284.00

    8.00

    2.62

    20.96

    Windjammer South

    and

    312.00

    328.00

    16.00

    4.72

    75.52

    Windjammer South

    including

    321.00

    324.00

    3.00

    21.10

    63.30

    Windjammer South

    and

    380.90

    384.20

    3.30

    11.53

    38.05

    Windjammer South

    and

    418.00

    422.00

    4.00

    1.87

    7.48

    Windjammer South

    MGH23-481

    161.00

    163.00

    2.00

    0.52

    1.04

    Windjammer South

    and

    172.00

    175.60

    3.60

    0.77

    2.77

    Windjammer South

    and

    197.00

    214.25

    17.25

    1.33

    22.94

    Windjammer South

    MGH23-482A

    No significant intervals

    Windjammer South

    MGH23-483

    Geomechanical; Not assayed

    Windjammer South

    MGH23-484

    53.50

    60.50

    7.00

    1.21

    8.47

    Windjammer South

    and

    104.00

    178.95

    74.95

    0.57

    42.72

    Windjammer South

    including

    111.00

    124.91

    13.91

    1.10

    15.30

    Windjammer South

    MGH23-486

    43.00

    101.00

    58.00

    0.43

    24.94

    Windjammer South

    MGH23-487

    48.00

    50.00

    2.00

    0.65

    1.30

    Windjammer South

    and

    58.00

    60.00

    2.00

    0.68

    1.36

    Windjammer South

    and

    94.00

    104.00

    10.00

    0.31

    3.10

    Windjammer South

    and

    138.00

    140.00

    2.00

    0.70

    1.40

    Windjammer South

    MGH23-489

    Geomechanical; Not assayed

    Windjammer South

    MGH23-490

    Geomechanical; Not assayed

    Windjammer South

    MGH23-493

    Geometallurgical; Not assayed

    Windjammer South

    MGH23-493A

    Geometallurgical; Not assayed

    Windjammer South

    MGH23-494

    Geometallurgical; Not assayed

    Windjammer South

    MGH23-505

    65.00

    76.00

    11.00

    0.52

    5.72

    Windjammer South

    and

    99.00

    101.00

    2.00

    0.60

    1.20

    Windjammer South

    and

    142.00

    150.00

    8.00

    0.85

    6.80

    Windjammer South

    and

    170.00

    172.00

    2.00

    0.92

    1.84

    Windjammer South

    and

    188.00

    190.00

    2.00

    0.72

    1.44

    Windjammer South

    and

    200.00

    214.00

    14.00

    0.70

    9.80

    Windjammer South

    and

    222.30

    224.00

    1.70

    8.14

    13.84

    Windjammer South

    and

    240.00

    246.00

    6.00

    0.39

    2.34

    Windjammer South

    and

    252.00

    264.00

    12.00

    1.07

    12.84

    Windjammer South

    MGH23-506

    42.00

    44.00

    2.00

    0.52

    1.04

    Windjammer South

    and

    112.00

    114.00

    2.00

    0.60

    1.20

    Windjammer South

    MGH23-507

    38.00

    63.00

    25.00

    0.55

    13.75

    Windjammer South

    and

    75.00

    112.00

    37.00

    0.39

    14.43

    Windjammer South

    and

    142.00

    154.00

    12.00

    0.48

    5.76

    Windjammer South

    and

    160.00

    162.00

    2.00

    1.12

    2.24

    Windjammer South

    and

    168.00

    236.00

    68.00

    0.56

    38.08

    Windjammer South

    including

    214.00

    228.00

    14.00

    1.22

    17.08

    Windjammer South

    and

    243.25

    255.90

    10.90

    8.04

    87.64

    Windjammer South

    and

    277.00

    287.00

    10.00

    2.11

    21.10

    Windjammer South

    and

    305.00

    355.65

    50.65

    2.34

    118.52

    Windjammer South

    including

    305.00

    310.00

    5.00

    8.48

    42.40

    Windjammer South

    including

    352.00

    355.65

    3.65

    12.10

    44.17

    Windjammer South

    MGH23-507

    385.35

    435.00

    49.65

    1.18

    58.59

    Note: All intercepts are calculated using a 0.30 g/t Au cut-off, a maximum of 5m internal dilution and no top cap applied. Drill intercepts are not true widths. Geomechanical and Geometallurgical drill holes are not shown in the section because they were not assayed.

    Table 3: Tower Gold – Windjammer South Deposit: Infill Drill Hole Details

    Zone

    Hole Number

    Easting

    Northing

    Elevation

    Azimuth

    Inclination

    End of Hole Depth (m)

    Windjammer South

    MGH23-444

    572328.6

    5370498.451

    333.748

    79.96

    -55.11

    135

    Windjammer South

    MGH23-449

    572097.238

    5370278.302

    329.224

    80.07

    -57.20

    330

    Windjammer South

    MGH23-460

    572236.755

    5370324.572

    331.073

    80.02

    -56.96

    285

    Windjammer South

    MGH23-465

    572325.177

    5370401.252

    333.544

    79.99

    -57.01

    132

    Windjammer South

    MGH23-467

    572431.373

    5370424.81

    337.926

    80.01

    -56.15

    165

    Windjammer South

    MGH23-468

    572067.463

    5370372.409

    329.104

    80.08

    -57.06

    348

    Windjammer South

    MGH23-471

    572278.513

    5370236.425

    331.116

    80.20

    -55.97

    211

    Windjammer South

    MGH23-474

    571972.783

    5370302.477

    329.051

    80.19

    -57.02

    324

    Windjammer South

    MGH23-477

    572324.278

    5370285.499

    332.525

    80.06

    -55.90

    207

    Windjammer South

    MGH23-478

    571950.754

    5370327.328

    328.975

    80.02

    -58.12

    422

    Windjammer South

    MGH23-481

    572158.898

    5370246.868

    329.186

    79.99

    -56.99

    273

    Windjammer South

    MGH23-482A

    571940.556

    5370350.876

    328.72

    81.89

    -57.02

    75

    Windjammer South

    MGH23-483

    572313.497

    5370348.952

    332.691

    99.92

    -75.08

    465

    Windjammer South

    MGH23-484

    571895.021

    5370305.912

    328.907

    80.04

    -56.00

    219

    Windjammer South

    MGH23-486

    572004.304

    5370336.94

    329.258

    44.97

    -56.18

    234

    Windjammer South

    MGH23-487

    572045.997

    5370536.206

    329.115

    80.02

    -56.09

    219

    Windjammer South

    MGH23-489

    572250.284

    5370289.164

    330.75

    189.95

    -75.00

    465

    Windjammer South

    MGH23-490

    572214.013

    5370395.708

    331.042

    320.07

    -75.02

    465

    Windjammer South

    MGH23-493

    572349.18

    5370259.36

    331.67

    342.71

    -59.72

    273

    Windjammer South

    MGH23-493A

    572349.1

    5370260

    340.8

    342.89

    -59.72

    162

    Windjammer South

    MGH23-494

    572348.9

    5370468.169

    335.81

    80.00

    -55.03

    132

    Windjammer South

    MGH23-505

    571960.178

    5370486.958

    328.713

    80.18

    -61.83

    330

    Windjammer South

    MGH23-506

    571956.134

    5370453.053

    328.798

    80.00

    -61.01

    126

    Windjammer South

    MGH23-507

    571981.902

    5370351.767

    328.787

    80.05

    -56.08

    450

    Quality Control Procedures

    NQ drill core is oriented and cut with half sent to ALS Laboratories Inc. (ALS) for drying and crushing to -2 mm, with a 1.00 kg split pulverized to -75 µm (200#). ALS is an ISO 17025 accredited laboratory. A 50 g charge is Fire Assayed and analyzed using an AAS finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire Assay with a gravimetric finish and selected samples with visible gold or high-grade mineralization are assayed by Metallic Screen Fire Assay on a 1.00 kg sample. STLLR inserts independent certified reference material and blanks with the samples and assays routine pulp repeats and coarse reject sample duplicates, as well as completing routine third-party check assays at Bureau Veritas Commodities Canada Ltd.

    Qualified Person

    John McBride, MSc., P.Geo., Vice President of Exploration for STLLR, who is the “Qualified Person” as defined by NI 43-101 for this project, has reviewed and approved of the technical disclosure contained in this news release.

    About STLLR Gold

    STLLR Gold Inc. (TSX: STLR; OTCQX: STLRF; FSE: O9D) is a Canadian gold development company actively advancing two cornerstone gold projects in Canada: The Tower Gold Project in the Timmins Mining Camp in Ontario and the Colomac Gold Project located north of Yellowknife, Northwest Territories. Each of these two projects has the potential for a long-life and large-scale operation and are surrounded by exploration land with favorable upside potential. STLLR’s experienced management team, with a track record of successfully advancing projects and operating mines, is working towards rapidly advancing these projects.

    Forward-Looking Information

    This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, information with respect to timing of the updated Tower MRE, confirmation of the Tower MRE block model, potential expansion of the known mineralization at the Tower Gold Project, the timing of the release of the assay results from Tower Gold project drilling, the goals, synergies, strategies, opportunities, profile, mineral resources and potential production, project timelines, prospective shareholding, integration and comparables to other transactions, the future financial or operating performance of STLLR and STLLR’s mineral properties and project portfolios, the advancement of the Tower Gold and Colomac Gold Projects, long-life and large-scale potential of the Tower and Colomac Gold Projects and exploration upside of the land packages. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “accelerate”, “add” or “additional”, “advancing”, “anticipates” or “does not anticipate”, “appears”, “believes”, “can be”, “conceptual”, “confidence”, “continue”, “convert” or “conversion”, “deliver”, “demonstrating”, “estimates”, “encouraging”, “expand” or “expanding” or “expansion”, “expect” or “expectations”, “fast-track”, “forecasts”, “forward”, “goal”, “improves”, “increase”, “intends”, “justification”, “leading”, “plans”, “potential” or “potentially”, “pro-forma”, “promise”, “prospective”, “prioritize”, “reflects”, “re-rating”, “robust”, “scheduled”, “stronger”, “suggesting” or “suggests”, “support”, “updating”, “upside”, “will be” or “will consider”, “work towards”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might”, or “will be taken”, “occur”, or “be achieved”.

    Forward-looking information is based on the opinions and estimates of management at the date the information is made, and is based on a number of assumptions and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of STLLR to be materially different from those expressed or implied by such forward-looking information, including risks associated with required regulatory approvals, the exploration, development and mining such as economic factors as they effect exploration, future commodity prices, changes in foreign exchange and interest rates, actual results of current exploration activities, government regulation, political or economic developments, the ongoing wars and their effect on supply chains, environmental risks, COVID-19 and other pandemic risks, permitting timelines, capex, operating or technical difficulties in connection with development activities, employee relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of reserves, contests over title to properties, and changes in project parameters as plans continue to be refined as well as those risk factors discussed in the joint management information circular of STLLR dated December 20, 2023, available on www.sedarplus.ca. Although STLLR has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. STLLR does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

    1 For more information on the Tower MRE and Tower PEA effective as of September 7, 2022, please refer to the NI 43-101 technical report titled “NI 43-101 Report & Preliminary Economic Assessment of the Tower Gold Project Northeastern Ontario, Canada” dated November 29, 2022, which is available on STLLR Gold’s profile on SEDAR+ www.sedarplus.ca and www.stllrgold.com


    The STLLR Gold Stock at the time of publication of the news with a raise of 0,00 % to 0,938CAD on Lang & Schwarz stock exchange (04. April 2024, 13:42 Uhr).

    Diskutieren Sie über die enthaltenen Werte


    Business Wire (engl.)
    0 Follower
    Autor folgen

    STLLR Gold Announces Windjammer South Infill Drilling Results at the Tower Gold Project and Appointment of VP Projects & Technical Services STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) (“STLLR” or the “Company”) announces the remaining assay results from the infill and confirmatory drilling program at the Windjammer South Deposit at the Golden Highway Area (western end) of the …