checkAd

     623  0 Kommentare Gold X Mining Commences Definition Drilling and Resource Expansion Program at the Toroparu Gold Project - Seite 4

    The PEA documentation of mining production quantities replaces the 2013 Prefeasibility Study (the “2013 PFS”) Statement of Mineral Reserves3.  The PEA is based on exploitation of measured, indicated and inferred mineral resources while the 2013 PFS is based on the exploitation of proven and probable mineral reserves.  Inferred resources from the Mineral Resource Estimate comprise 5% of the resources used in the production schedule reported in the PEA.  Mineral Resources that are not mineral reserves do not have demonstrated economic viability.  The conclusions and results of the PEA replace the conclusions and results from the 2013 PFS.

    Visit Gold X’s website at www.goldxmining.com.

    Contact Gold X Mining Corp.
    Freddie Leigh
    Telephone: +1 (604) 609-6132
    Email: investors@goldxmining.com

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Forward-looking Statements

    This press release includes certain forward-looking statements concerning future performance and operations of the Company, including the expected positive results from the Toroparu Project based on the estimates and findings contained in the PEA, as summarized herein, as well as management's objectives, strategies, beliefs and intentions. Forward-looking statements are frequently identified by such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and results. Forward-looking statements are based on the current opinions and expectations of management at the time such statements are made. All forward-looking statements and information are inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, changes in project parameters as plans continue to be refined, uncertainties of project cost overruns or unanticipated costs and expenses, uncertainties inherent in conducting operations in a foreign country, uncertainties related to the availability and costs of financing needed in the future, the risk that the conclusion of pre-production studies may not be accurate, the Company's successful advancement of the Toroparu Project toward feasibility and obtaining positive results from ongoing evaluation and testing of multiple gold targets located in the Company's landholdings in Guyana, among other risks as described in our public filings available at www.sedar.com. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. Gold X Mining Corp. has an ongoing obligation to disclose material information, as it becomes available.

    Seite 4 von 5



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Gold X Mining Commences Definition Drilling and Resource Expansion Program at the Toroparu Gold Project - Seite 4 Drill program designed to upgrade and expand Toroparu’s current mineral resource, already one of the largest gold resources in the Americas Definition drilling to target recently discovered, open-ended, high grade structures within the Toroparu …