checkAd

     246  0 Kommentare Roxgold Drills 38.3 g/t Au Over 12m, 28.3 g/t Au Over 16m in Koula Deposit as Séguéla Advances Toward Goal of Initial Production Next Year - Seite 4

    Q2 2021

    Séguéla construction decision

    H1 2021

    Initial resource at Boussoura

    H2 2021

    Commissioning of Séguéla Gold Project

    H2 2022

    Quality Assurance/Quality Control

    All drilling data completed by Roxgold utilized the following procedures and methodologies. All drilling was carried out under the supervision of Roxgold personnel.

    RC drilling used a 5.25 inch face sampling pneumatic hammer with samples collected into 60 litre plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Aircore (“AC”) drilling was collected in one metre intervals and sampled in a similar fashion to RC methods. Once collected, RC and AC samples were riffle split through a three-tier splitter to yield a 12.5% representative sample for submission to the analytical laboratory. The residual 87.5% sample were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company controlled core yard.

    DD drill holes were drilled with HQ sized diamond drill bits. The core was logged, marked up for sampling using standard lengths of one metre. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at Séguéla. The other half was sampled, catalogued and placed into sealed bags and securely stored at the site until shipment.

    All Séguéla RC, AC and DD core samples were shipped to ALS Laboratories preparation laboratory in Yamoussoukro for preparation. Samples were dried and crushed by the Lab and a 250-gram split prepared from the coarse crushed material, prior to pulverization and preparation of a 200g sample. Samples are then shipped via commercial courier to ALS’s analytical facility in Ouagadougou, Burkina Faso where routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the Lab inserted its own quality control samples.

    Seite 4 von 6



    Business Wire (engl.)
    0 Follower
    Autor folgen

    Weitere Artikel des Autors


    Roxgold Drills 38.3 g/t Au Over 12m, 28.3 g/t Au Over 16m in Koula Deposit as Séguéla Advances Toward Goal of Initial Production Next Year - Seite 4 Roxgold Inc. (“Roxgold” or the “Company”) (TSX: ROXG) (OTCQX: ROGFF) is pleased to announce additional results and the successful conclusion of the infill drilling program from the newest high grade deposit, Koula, at the Séguéla Gold Project …